Private Vehicle 8:20 9:00 Dabra Sindh P8 soil dumping for working platform. A2/9 boring completed and A2/16 casting
7.11.2020 0.7 700 490
Private Vehicle 17:00 17:30 Sindh Dabra complete.
Private Vehicle 08:30 09:00 Dabra Sindh P1 pier cap bearing plate fixing in progress. P8 soil dumping for working platform.
11.11.2020 0.7 700 490
Private Vehicle 17:15 17:45 Sindh Dabra A2/19, A2/4, A2/12, P6/7 boring in progress.
Private Vehicle 09:05 09:30 Dabra Sindh A1 bed block shuttering work in progress. P3 6th lift shuttering in progress. A2/19,
16.11.2020 0.7 700 490
Private Vehicle 18:25 19:00 A2/4, A2/6, P6/7, P6/5 boring in progress.
Sindh Dabra
Private Vehicle 09:15 09:45 Dabra Sindh A1 bed block shuttering work in progress. P3 6th lift shuttering in progress. A2/19,
17.11.2020 0.7 700 490
Private Vehicle 17:05 17:40 A2/4, A2/6, P6/7, P6/5 boring in progress.
Sindh Dabra
Private Vehicle 8:55 9:25 Dabra Sindh A1 bed block shuttering work in progress. P1 OHE mast casting complete. P3 6th lift
18.11.2020 0.7 700 490 shuttering in progress. A2/19 boring complete. A2/4, A2/6, P6/7, P6/5, P6/2 boring in
Private Vehicle 18:05 18:40 Sindh Dabra progress.
Private Vehicle 8:30 8:45 Dabra Sindh A1 bed block shuttering work in progress. P3 6th lift shuttering in progress. A2/19,
19.11.2020 0.7 700 490
Private Vehicle 17:25 17:50 A2/4, A2/6 boring complete. P6/7, P6/5, P6/2 boring in progress.
Sindh Dabra
Private Vehicle 8:05 8:45 Dabra Sindh A1 bed block casting complete. P3 6th lift shuttering in progress. A2/19, A2/4, A2/6
20.11.2020 1 700 700
Private Vehicle 20:10 20:50 boring complete. P6/7, P6/5, P6/2 boring in progress.
Sindh Dabra
Signature
Date:- Bill may be passed as per entitlement.
Bill passed for : Rs. 10430.00 (Ten Thousands Four Hundreds Thirty Only)