You are on page 1of 28

Name of the Project :-Construction of Important and Major Steel Girder Bridges, along with Foundation, Substructure and

related protection works in connection with


MATHURA - JHANSI Third Line in Agra & Jhansi Division of North Central Railway in the State of U.P., M.P., & Rajasthan .

Client :- RAIL VIKAS NIGAM LTD.


PMC :- LEA Associates South Asia PVT. LTD.
Contractor :- GPT Infraprojects LTD.
STANDARD DEVIATION FOR CUBES FOR SINDH BRIDGE (1176/1)
GRADE:- M-35 (SAND)
Strength of 28 days Av.
Strength
Date of Pile No/ Date of for one
SL NO Casting Br. No STRUCTURE Grade Testing CUBE sample (X-) (X-)² Remarks
DETAILS CUBE 2 CUBE 3 (X)
1

1 26-Apr-21 Br. 1176/1 P7/7 M-35 24-May-21 42.44 40.93 42.22 41.86 0.38 0.15
2 41.33 42.89 40.62 41.61 0.13 0.02
3 15-May-21 Br. 1176/1 P8 Pile Cap M-35 12-Jun-21 39.82 41.02 41.78 40.87 -0.61 0.37
4 42.31 41.69 41.20 41.73 0.25 0.06
5 41.47 42.67 42.09 42.08 0.60 0.36
6 39.56 41.33 40.62 40.50 -0.98 0.95
7 42.40 40.84 41.87 41.70 0.22 0.05
8 40.49 42.00 39.96 40.82 -0.66 0.44
9 42.88 41.07 41.42 41.79 0.31 0.10
10 39.47 41.60 41.07 40.71 -0.77 0.59
11 42.58 41.78 40.40 41.59 0.11 0.01
12 4-Jun-21 Br. 1176/1 P7 Pile Cap M-35 2-Jul-21 39.07 40.13 40.80 40.00 -1.48 2.19
13 41.20 40.04 41.69 40.98 -0.50 0.25
14 39.51 41.60 40.49 40.53 -0.95 0.89
15 42.44 39.56 41.20 41.07 -0.41 0.17
16 41.69 42.93 41.20 41.94 0.46 0.21
17 42.31 43.29 41.78 42.46 0.98 0.96
18 39.91 41.64 42.09 41.21 -0.27 0.07
19 40.89 42.53 40.31 41.24 -0.24 0.06
20 41.96 43.11 41.38 42.15 0.67 0.45
21 7-Jun-21 Br. 1176/1 P6 Pile Cap M-35 5-Jul-21 41.33 40.98 42.40 41.57 0.09 0.01
22 40.40 43.11 41.87 41.79 0.31 0.10
23 39.42 40.84 41.69 40.65 -0.83 0.69
24 42.75 41.47 42.22 42.15 0.67 0.45
25 41.20 42.53 41.87 41.87 0.39 0.15
26 40.36 42.58 41.96 41.63 0.15 0.02
27 40.84 42.84 41.73 41.80 0.32 0.11
28 42.93 42.09 42.31 42.44 0.96 0.93
29 41.47 43.11 41.82 42.13 0.65 0.43
= 41.48 ∑(x-)²= 11.22

N= 29 Remarks:-
(N-1) = 28
Standard Deviation (SD) = √[{∑(x-)²}/(N-1)] = 0.63

Target Mean Strength = fck+1.65*(SD) 36.04


Observed SD as 2.00 < 5.0 As per IS 10262 (2019), Table-2 & Clause
4.2.1.1(C), Hence OK
Symbols:-

X= Average 28 Days Compressive Strength of a set of Cube

=
Average 28 Days Compressive Strength of all set of Cube
N= Number of set of Cube

GPT Representative PMC Representative RVNL Representative


Name of the Project :-Construction of Important and Major Steel Girder Bridges, along with Foundation, Substructure and related protection works in connection with
MATHURA - JHANSI Third Line in Agra & Jhansi Division of North Central Railway in the State of U.P., M.P., & Rajasthan .

Client :- RAIL VIKAS NIGAM LTD.


PMC :- LEA Associates South Asia PVT. LTD.
Contractor :- GPT Infraprojects LTD.
STANDARD DEVIATION FOR CUBES FOR SINDH BRIDGE (1176/1)
GRADE:- M-35 (SAND)
Strength of 28 days Av.
Strength
Date of Pile No/ Date of for one
SL NO Casting Br. No STRUCTURE Grade Testing CUBE sample (X-) (X-)² Remarks
DETAILS CUBE 2 CUBE 3 (X)
1

1 15-Mar-21 Br. 1176/1 P7/5 M-35 12-Apr-21 40.76 39.73 41.42 40.64 -0.62 0.39
2 40.31 41.96 41.24 41.17 -0.09 0.01
3 16-Mar-21 Br. 1176/1 P7/11 M-35 13-Apr-21 40.00 40.84 41.60 40.81 -0.44 0.20
4 42.09 39.96 41.24 41.10 -0.16 0.03
5 23-Mar-21 Br. 1176/1 P7/1 M-35 20-Apr-21 41.20 39.96 41.60 40.92 -0.34 0.11
6 41.91 42.36 41.29 41.85 0.60 0.36
7 24-Mar-21 Br. 1176/1 P7/12 M-35 21-Apr-21 41.64 39.60 42.76 41.33 0.08 0.01
8 43.11 40.80 42.13 42.01 0.76 0.57
9 2-Apr-21 Br. 1176/1 P7/10 M-35 30-Apr-21 39.78 40.80 41.16 40.58 -0.68 0.46
10 41.64 40.40 40.80 40.95 -0.31 0.10
11 3-Apr-21 Br. 1176/1 P7/8 M-35 1-May-21 42.13 41.07 41.64 41.61 0.36 0.13
12 42.40 40.31 41.29 41.33 0.08 0.01
13 6-Apr-21 Br. 1176/1 P6/3 M-35 4-May-21 41.02 39.96 42.04 41.01 -0.25 0.06
14 40.31 42.44 41.60 41.45 0.19 0.04
15 10-Apr-21 Br. 1176/1 P7/6 M-35 8-May-21 41.96 42.31 40.89 41.72 0.46 0.21
16 42.93 41.60 42.53 42.35 1.10 1.20
17 11-Apr-21 Br. 1176/1 P7/3 M-35 9-May-21 42.04 39.91 40.98 40.98 -0.28 0.08
18 40.76 42.40 41.64 41.60 0.34 0.12
19 15-Apr-21 Br. 1176/1 P7/4 M-35 13-May-21 42.31 40.93 41.42 41.55 0.30 0.09
20 39.96 42.09 40.80 40.95 -0.31 0.09
21 19-Apr-21 Br. 1176/1 P7/2 M-35 17-May-21 43.20 41.82 42.67 42.56 1.31 1.71
22 42.98 40.98 41.64 41.87 0.61 0.37
23 24-Apr-21 Br. 1176/1 P9 Pile Cap M-35 22-May-21 39.42 40.53 41.07 40.34 -0.92 0.84
24 42.40 40.76 41.96 41.71 0.45 0.20
25 42.22 39.96 41.16 41.11 -0.14 0.02
26 41.51 43.47 41.82 42.27 1.01 1.02
27 42.53 40.40 41.33 41.42 0.16 0.03
28 40.04 39.56 42.00 40.53 -0.72 0.52
29 40.31 42.93 40.93 41.39 0.13 0.02
30 39.07 41.78 40.80 40.55 -0.71 0.50
31 38.22 39.96 39.73 39.30 -1.95 3.82
= 41.26 ∑(x-)²= 13.29

N= 31 Remarks:-
(N-1) = 30
Standard Deviation (SD) = √[{∑(x-)²}/(N-1)] = 0.67

Target Mean Strength = fck+1.65*(SD) 36.10


Observed SD as 2.06 < 5.0 As per IS 10262 (2019), Table-2 & Clause
4.2.1.1(C), Hence OK
Symbols:-

X= Average 28 Days Compressive Strength of a set of Cube

=
Average 28 Days Compressive Strength of all set of Cube
N= Number of set of Cube

GPT Representative PMC Representative RVNL Representative


Name of the Project :-Construction of Important and Major Steel Girder Bridges, along with Foundation, Substructure and related protection works in connection with
MATHURA - JHANSI Third Line in Agra & Jhansi Division of North Central Railway in the State of U.P., M.P., & Rajasthan .

Client :- RAIL VIKAS NIGAM LTD.


PMC :- LEA Associates South Asia PVT. LTD.
Contractor :- GPT Infraprojects LTD.
STANDARD DEVIATION FOR CUBES FOR SINDH BRIDGE (1176/1)
GRADE:- M-35 (SAND)
Strength of 28 days Av.
Strength
Date of Pile No/ Date of for one
SL NO Casting Br. No STRUCTURE Grade Testing CUBE sample (X-) (X-)² Remarks
DETAILS CUBE 2 CUBE 3 (X)
1

1 12-Feb-21 Br. 1176/1 P6/6 M-35 12-Mar-21 42.67 40.18 41.29 41.38 -0.29 0.08
2 42.22 43.24 41.51 42.32 0.66 0.43
3 13-Feb-21 Br. 1176/1 P10/16 M-35 13-Mar-21 42.44 43.24 41.78 42.49 0.82 0.67
4 42.13 42.93 41.64 42.23 0.57 0.32
5 41.02 42.00 41.47 41.50 -0.17 0.03
6 15-Feb-21 Br. 1176/1 P6/4 M-35 15-Mar-21 39.73 42.49 41.69 41.30 -0.36 0.13
7 43.11 42.71 40.98 42.27 0.60 0.36
8 27-Feb-21 Br. 1176/1 A2 Pile Cap M-35 27-Mar-21 41.69 42.67 40.93 41.76 0.10 0.01
9 40.53 43.11 41.29 41.64 -0.02 0.00
10 41.96 39.33 40.31 40.53 -1.13 1.28
11 42.36 42.76 42.09 42.40 0.74 0.54
12 41.42 42.00 40.04 41.15 -0.51 0.26
13 41.51 43.42 43.64 42.86 1.19 1.42
14 39.51 41.78 41.24 40.84 -0.82 0.68
15 41.69 42.18 40.62 41.50 -0.17 0.03
16 39.56 41.78 42.04 41.13 -0.54 0.29
17 41.55 39.55 40.84 40.65 -1.02 1.04
18 43.24 41.47 42.58 42.43 0.76 0.58
19 5-Mar-21 Br. 1176/1 P6/1 M-35 2-Apr-21 42.71 42.13 41.51 42.12 0.45 0.20
20 39.87 42.36 40.40 40.88 -0.79 0.62
21 6-Mar-21 Br. 1176/1 P7/9 M-35 3-Apr-21 40.71 41.87 42.09 41.56 -0.11 0.01
22 41.78 43.02 41.64 42.15 0.48 0.23
23 10-Mar-21 Br. 1176/1 P10 Pile Cap M-35 7-Apr-21 42.40 41.82 42.67 42.30 0.63 0.40
24 39.78 42.18 40.36 40.77 -0.89 0.80
25 41.69 40.93 42.53 41.72 0.05 0.00
26 43.11 41.73 42.13 42.32 0.66 0.43
27 39.78 41.29 42.84 41.30 -0.36 0.13
28 40.76 42.58 41.11 41.48 -0.18 0.03
29 42.09 41.20 39.96 41.08 -0.58 0.34
30 42.62 40.62 41.60 41.61 -0.05 0.00
31 43.33 42.27 42.00 42.53 0.87 0.75
32 43.11 41.56 42.13 42.27 0.60 0.36
33 41.20 39.87 40.44 40.50 -1.16 1.35
= 41.67 ∑(x-)²= 13.84

N= 33 Remarks:-
(N-1) = 32
Standard Deviation (SD) = √[{∑(x-)²}/(N-1)] = 0.66

Target Mean Strength = fck+1.65*(SD) 36.08


Observed SD as 2.12 < 5.0 As per IS 10262 (2019), Table-2 & Clause
4.2.1.1(C), Hence OK
Symbols:-

X= Average 28 Days Compressive Strength of a set of Cube

=
Average 28 Days Compressive Strength of all set of Cube
N= Number of set of Cube

GPT Representative PMC Representative RVNL Representative


Name of the Project :-Construction of Important and Major Steel Girder Bridges, along with Foundation, Substructure and related protection works in connection with
MATHURA - JHANSI Third Line in Agra & Jhansi Division of North Central Railway in the State of U.P., M.P., & Rajasthan .

Client :- RAIL VIKAS NIGAM LTD.


PMC :- LEA Associates South Asia PVT. LTD.
Contractor :- GPT Infraprojects LTD.
STANDARD DEVIATION FOR CUBES FOR SINDH BRIDGE (1176/1)
GRADE:- M-35 (SAND)
Strength of 28 days Av.
Strength
Date of Pile No/ Date of for one
SL NO Casting Br. No STRUCTURE Grade Testing CUBE sample (X-) (X-)² Remarks
DETAILS CUBE 2 CUBE 3 (X)
1

1 31-Dec-20 Br. 1176/1 P8/10 M-35 28-Jan-21 40.98 40.18 41.73 40.96 -0.82 0.68
2 42.36 43.07 41.38 42.27 0.48 0.23
3 2-Jan-21 Br. 1176/1 P6/11 M-35 30-Jan-21 40.04 41.60 42.04 41.23 -0.56 0.31
4 42.84 39.96 40.31 41.04 -0.75 0.56
5 2-Jan-21 Br. 1176/1 A2/7 M-35 30-Jan-21 42.67 43.29 41.02 42.33 0.54 0.29
6 39.82 40.49 40.09 40.13 -1.65 2.74
7 42.44 43.11 42.89 42.81 1.03 1.05
8 3-Jan-21 Br. 1176/1 P8/5 M-35 31-Jan-21 40.76 40.04 41.60 40.80 -0.99 0.97
9 42.22 43.02 41.33 42.19 0.40 0.16
10 7-Jan-21 Br. 1176/1 P8/11 M-35 4-Feb-21 42.53 41.78 43.07 42.46 0.67 0.45
11 39.42 40.04 39.69 39.72 -2.07 4.29
12 10-Jan-21 Br. 1176/1 P8/9 M-35 7-Feb-21 40.76 39.56 41.51 40.61 -1.18 1.39
13 42.80 41.20 42.53 42.18 0.39 0.15
14 10-Jan-21 Br. 1176/1 P6/10 M-35 7-Feb-21 43.20 42.09 42.71 42.67 0.88 0.77
15 41.60 42.40 39.87 41.29 -0.50 0.25
16 11-Jan-21 Br. 1176/1 P8/3 M-35 8-Feb-21 42.98 43.29 41.64 42.64 0.85 0.72
17 41.78 42.53 40.44 41.58 -0.20 0.04
18 27-Jan-21 Br. 1176/1 P8/6 M-35 24-Feb-21 41.60 43.24 43.96 42.93 1.15 1.31
19 44.36 42.09 42.36 42.94 1.15 1.32
20 28-Jan-21 Br. 1176/1 P8/8 M-35 25-Feb-21 40.36 43.16 41.29 41.60 -0.18 0.03
21 42.04 42.93 43.51 42.83 1.04 1.08
22 29-Jan-21 Br. 1176/1 P8/1 M-35 26-Feb-21 41.60 40.36 42.62 41.53 -0.26 0.07
23 43.64 42.31 41.78 42.58 0.79 0.62
24 5-Feb-21 Br. 1176/1 P6/9 M-35 5-Mar-21 40.89 39.69 41.82 40.80 -0.99 0.97
25 41.29 42.58 42.76 42.21 0.42 0.18
26 6-Feb-21 Br. 1176/1 P6/12 M-35 6-Mar-21 42.40 40.09 41.73 41.41 -0.38 0.14
27 42.98 41.96 42.31 42.42 0.63 0.40
28 8-Feb-21 Br. 1176/1 P8/7 M-35 8-Mar-21 40.36 42.80 41.60 41.59 -0.20 0.04
29 42.36 41.73 43.11 42.40 0.61 0.38
30 10-Feb-21 Br. 1176/1 P10/17 M-35 10-Mar-21 41.42 42.09 41.11 41.54 -0.25 0.06
31 43.20 39.87 41.96 41.68 -0.11 0.01
32 43.51 41.60 40.44 41.85 0.06 0.00
= 41.79 ∑(x-)²= 21.69

N= 32 Remarks:-
(N-1) = 31
Standard Deviation (SD) = √[{∑(x-)²}/(N-1)] = 0.84

Target Mean Strength = fck+1.65*(SD) 36.38


Observed SD as 2.20 < 5.0 As per IS 10262 (2019), Table-2 & Clause
4.2.1.1(C), Hence OK
Symbols:-

X= Average 28 Days Compressive Strength of a set of Cube

=
Average 28 Days Compressive Strength of all set of Cube
N= Number of set of Cube

GPT Representative PMC Representative RVNL Representative


Name of the Project :-Construction of Important and Major Steel Girder Bridges, along with Foundation, Substructure and related protection works in connection with
MATHURA - JHANSI Third Line in Agra & Jhansi Division of North Central Railway in the State of U.P., M.P., & Rajasthan .

Client :- RAIL VIKAS NIGAM LTD.


PMC :- LEA Associates South Asia PVT. LTD.
Contractor :- GPT Infraprojects LTD.
STANDARD DEVIATION FOR CUBES FOR SINDH BRIDGE (1176/1)
GRADE:- M-35 (SAND)
Strength of 28 days Av.
Strength
Date of Pile No/ Date of for one
SL NO Casting Br. No STRUCTURE Grade Testing CUBE sample (X-) (X-)² Remarks
DETAILS CUBE 2 CUBE 3 (X)
1

1 26-Nov-20 Br. 1176/1 A2/06 M-35 24-Dec-20 41.60 43.73 42.09 42.47 0.95 0.90
2 40.93 43.42 39.96 41.44 -0.09 0.01
3 42.93 40.76 42.22 41.97 0.44 0.20
4 27-Nov-20 Br. 1176/1 A2/04 M-35 25-Dec-20 42.89 41.47 43.64 42.67 1.14 1.30
5 42.04 41.29 43.42 42.25 0.72 0.52
6 43.07 41.73 42.44 42.41 0.89 0.79
7 28-Nov-20 Br. 1176/1 A2/02 M-35 26-Dec-20 40.76 42.80 44.44 42.67 1.14 1.30
8 40.98 41.82 43.73 42.18 0.65 0.42
9 42.44 41.51 41.20 41.72 0.19 0.04
10 7-Dec-20 Br. 1176/1 P6/7 M-35 4-Jan-21 41.60 38.76 41.02 40.46 -1.07 1.14
11 39.29 39.96 41.82 40.36 -1.17 1.37
12 7-Dec-20 Br. 1176/1 A2/08 M-35 4-Jan-21 41.73 39.73 40.49 40.65 -0.88 0.77
13 39.42 41.78 41.20 40.80 -0.73 0.53
14 40.36 40.71 39.56 40.21 -1.32 1.73
15 8-Dec-20 Br. 1176/1 A2/01 M-35 5-Jan-21 39.20 40.27 41.47 40.31 -1.21 1.47
16 41.78 41.16 40.40 41.11 -0.41 0.17
17 39.42 38.84 40.62 39.63 -1.90 3.61
18 26-Dec-20 Br. 1176/1 P8/2 M-35 23-Jan-21 42.00 41.78 42.93 42.24 0.71 0.50
19 40.71 40.04 41.33 40.69 -0.83 0.69
20 26-Dec-20 Br. 1176/1 P8/12 M-35 23-Jan-21 43.20 42.53 43.73 43.15 1.63 2.65
21 42.09 38.71 40.53 40.44 -1.08 1.17
22 27-Dec-20 Br. 1176/1 P6/8 M-35 24-Jan-21 39.87 39.29 42.04 40.40 -1.13 1.27
23 40.98 42.67 39.96 41.20 -0.32 0.10
24 27-Dec-20 Br. 1176/1 P6/02 M-35 24-Jan-21 41.96 43.20 42.22 42.46 0.93 0.87
25 43.51 40.71 40.18 41.47 -0.06 0.00
26 28-Dec-20 Br. 1176/1 P8/4 M-35 25-Jan-21 43.69 42.40 42.84 42.98 1.45 2.10
27 40.18 41.56 40.62 40.79 -0.74 0.55
28 28-Dec-20 Br. 1176/1 P6/5 M-35 25-Jan-21 41.24 39.73 43.42 41.46 -0.06 0.00
29 42.62 41.73 43.02 42.46 0.93 0.87
30 29-Dec-20 Br. 1176/1 A2/03 M-35 26-Jan-21 43.73 42.67 41.82 42.74 1.21 1.47
31 42.40 44.09 42.18 42.89 1.36 1.86
32 39.51 40.84 40.18 40.18 -1.35 1.82
= 41.53 ∑(x-)²= 32.20

N= #REF! Remarks:-
(N-1) = #REF!
Standard Deviation (SD) = √[{∑(x-)²}/(N-1)] = #REF!

Target Mean Strength = fck+1.65*(SD) #REF!


Observed SD as 2.36 < 5.0 As per IS 10262 (2019), Table-2 & Clause
4.2.1.1(C), Hence OK
Symbols:-

X= Average 28 Days Compressive Strength of a set of Cube

=
Average 28 Days Compressive Strength of all set of Cube
N= Number of set of Cube

GPT Representative PMC Representative RVNL Representative


Name of the Project :-Construction of Important and Major Steel Girder Bridges, along with Foundation, Substructure and related protection works in connection with
MATHURA - JHANSI Third Line in Agra & Jhansi Division of North Central Railway in the State of U.P., M.P., & Rajasthan .

Client :- RAIL VIKAS NIGAM LTD.


PMC :- LEA Associates South Asia PVT. LTD.
Contractor :- GPT Infraprojects LTD.
STANDARD DEVIATION FOR CUBES FOR SINDH BRIDGE (1176/1)
GRADE:- M-35 (SAND)
Strength of 28 days Av.
Strength
Date of Pile No/ Date of for one
SL NO Casting Br. No STRUCTURE Grade Testing CUBE sample (X-) (X-)² Remarks
DETAILS CUBE 2 CUBE 3 (X)
1

1 13-Oct-20 Br. 1176/1 A2/10 M-35 10-Nov-20 41.60 40.76 41.96 41.44 -1.19 1.42
2 40.80 42.44 41.51 41.58 -1.05 1.10
3 41.82 42.09 41.07 41.66 -0.97 0.95
4 14-Oct-20 Br. 1176/1 A2/14 M-35 11-Nov-20 42.71 41.38 42.04 42.04 -0.59 0.35
5 44.49 43.11 42.18 43.26 0.63 0.39
6 43.91 41.42 42.27 42.53 -0.10 0.01
7 27-Oct-20 Br. 1176/1 A2/17 M-35 24-Nov-20 43.47 41.02 41.91 42.13 -0.50 0.25
8 42.67 41.69 41.07 41.81 -0.82 0.68
9 42.09 42.58 43.91 42.86 0.23 0.05
10 28-Oct-20 Br. 1176/1 A2/05 M-35 25-Nov-20 43.73 45.91 45.16 44.93 2.30 5.29
11 46.71 46.31 45.73 46.25 3.62 13.09
12 44.13 45.82 46.62 45.52 2.89 8.36
13 29-Oct-20 Br. 1176/1 A2/20 M-35 26-Nov-20 43.51 43.78 44.13 43.81 1.17 1.38
14 42.93 43.38 42.53 42.95 0.31 0.10
15 43.91 42.80 43.56 43.42 0.79 0.63
16 30-Oct-20 Br. 1176/1 A2/13 M-35 27-Nov-20 43.07 42.44 44.09 43.20 0.57 0.32
17 42.09 41.69 41.96 41.91 -0.72 0.52
18 43.64 42.04 43.11 42.93 0.30 0.09
19 7-Nov-20 Br. 1176/1 A2/16 M-35 5-Dec-20 41.29 39.87 41.82 40.99 -1.64 2.69
20 41.33 40.76 42.09 41.39 -1.24 1.54
21 42.53 41.73 41.78 42.01 -0.62 0.38
22 8-Nov-20 Br. 1176/1 A2/09 M-35 6-Dec-20 40.76 42.31 42.80 41.96 -0.68 0.46
23 42.22 41.82 41.33 41.79 -0.84 0.71
24 43.07 41.47 42.18 42.24 -0.39 0.15
25 15-Nov-20 Br. 1176/1 A2/12 M-35 13-Dec-20 42.71 41.20 41.82 41.91 -0.72 0.52
26 42.18 42.53 40.76 41.82 -0.81 0.65
27 43.20 41.69 42.22 42.37 -0.26 0.07
28 25-Nov-20 Br. 1176/1 A2/19 M-35 23-Dec-20 43.33 41.33 43.73 42.80 0.16 0.03
29 42.00 43.07 43.51 42.86 0.23 0.05
30 41.69 42.53 43.51 42.58 -0.06 0.00
= 42.63 ∑(x-)²= 42.22

N= 30 Remarks:-
(N-1) = 29
Standard Deviation (SD) = √[{∑(x-)²}/(N-1)] = 1.21

Target Mean Strength = fck+1.65*(SD) 36.99


Observed SD as 2.47 < 5.0 As per IS 10262 (2019), Table-2 & Clause
4.2.1.1(C), Hence OK
Symbols:-

X= Average 28 Days Compressive Strength of a set of Cube

=
Average 28 Days Compressive Strength of all set of Cube
N= Number of set of Cube

GPT Representative PMC Representative RVNL Representative


Name of the Project :-Construction of Important and Major Steel Girder Bridges, along with Foundation, Substructure and related protection works in connection with
MATHURA - JHANSI Third Line in Agra & Jhansi Division of North Central Railway in the State of U.P., M.P., & Rajasthan .

Client :- RAIL VIKAS NIGAM LTD.


PMC :- LEA Associates South Asia PVT. LTD.
Contractor :- GPT Infraprojects LTD.
STANDARD DEVIATION FOR CUBES FOR SINDH BRIDGE (1176/1)
GRADE:- M-35 (SAND)
Strength of 28 days Av.
Strength
Date of Pile No/ Date of for one
SL NO Casting Br. No STRUCTURE Grade Testing CUBE sample (X-) (X-)² Remarks
DETAILS CUBE 2 CUBE 3 (X)
1

1 12-Jun-20 Br. 1176/1 P9/7 M-35 9-Jul-20 42.49 41.51 41.78 41.93 0.38 0.14
2 40.44 40.89 41.11 40.81 -0.73 0.54
3 41.78 42.00 41.29 41.69 0.14 0.02
4 13-Jun-20 Br. 1176/1 P9/10 M-35 10-Jul-20 43.78 42.67 43.11 43.19 1.64 2.69
5 41.56 42.89 42.53 42.33 0.78 0.61
6 42.04 41.51 40.89 41.48 -0.07 0.00
7 4-Sep-20 Br. 1176/1 P10/14 M-35 2-Oct-20 39.47 38.13 38.49 38.70 -2.85 8.13
8 39.73 38.71 40.04 39.49 -2.05 4.22
9 38.49 40.31 38.18 38.99 -2.55 6.53
10 18-Sep-20 Br. 1176/1 P10/8 M-35 16-Oct-20 42.04 41.73 42.62 42.13 0.58 0.34
11 43.20 44.13 41.38 42.90 1.36 1.84
12 43.56 40.71 41.20 41.82 0.28 0.08
13 21-Sep-20 Br. 1176/1 P10/12 M-35 21-Oct-20 38.44 39.07 40.49 39.33 -2.21 4.90
14 37.33 39.29 41.60 39.41 -2.14 4.59
15 38.76 38.36 39.24 38.79 -2.76 7.62
16 25-Sep-20 Br. 1176/1 A2/15 M-35 23-Oct-20 40.09 39.42 41.02 40.18 -1.37 1.88
17 42.27 41.33 42.76 42.12 0.57 0.33
18 42.62 41.96 41.64 42.07 0.53 0.28
19 27-Sep-20 Br. 1176/1 A2/18 M-35 25-Oct-20 39.64 41.60 42.67 41.30 -0.24 0.06
20 43.47 42.31 41.96 42.58 1.03 1.07
21 43.38 44.13 41.33 42.95 1.40 1.96
22 30-Sep-20 Br. 1176/1 A2/11 M-35 28-Oct-20 40.36 42.44 40.93 41.24 -0.30 0.09
23 43.11 41.51 42.18 42.27 0.72 0.52
24 40.76 41.29 38.36 40.14 -1.41 1.99
25 6-Oct-20 Br. 1176/1 P10/9 M-35 3-Nov-20 41.96 43.24 43.02 42.74 1.19 1.42
26 43.51 41.20 42.49 42.40 0.85 0.73
27 42.98 43.60 41.73 42.77 1.22 1.49
28 7-Oct-20 Br. 1176/1 P10/7 M-35 4-Nov-20 43.24 44.49 43.69 43.81 2.26 5.10
29 44.13 42.13 43.38 43.21 1.67 2.77
30 44.62 42.71 43.69 43.67 2.13 4.52
= 41.55 ∑(x-)²= 66.44

N= 30 Remarks:-
(N-1) = 29
Standard Deviation (SD) = √[{∑(x-)²}/(N-1)] = 1.51

Target Mean Strength = fck+1.65*(SD) 37.50


Observed SD as 2.61 < 5.0 As per IS 10262 (2019), Table-2 & Clause
4.2.1.1(C), Hence OK
Symbols:-

X= Average 28 Days Compressive Strength of a set of Cube

=
Average 28 Days Compressive Strength of all set of Cube
N= Number of set of Cube

GPT Representative PMC Representative RVNL Representative


Name of the Project :-Construction of Important and Major Steel Girder Bridges, along with Foundation, Substructure and related protection works in connection with
MATHURA - JHANSI Third Line in Agra & Jhansi Division of North Central Railway in the State of U.P., M.P., & Rajasthan .

Client :- RAIL VIKAS NIGAM LTD.


PMC :- LEA Associates South Asia PVT. LTD.
Contractor :- GPT Infraprojects LTD.
STANDARD DEVIATION FOR CUBES FOR SINDH BRIDGE (1176/1)
GRADE:- M-35 (SAND)
Strength of 28 days Av.
Strength
Date of Pile No/ Date of for one
SL NO Casting Br. No STRUCTURE Grade Testing CUBE sample (X-) (X-)² Remarks
DETAILS CUBE 2 CUBE 3 (X)
1

1 30-Apr-20 Br. 1176/1 P9/9 M-35 28-May-20 42.89 42.71 43.07 42.89 0.49 0.24
2 42.89 44.84 42.67 43.47 1.07 1.15
3 41.51 44.31 41.02 42.28 -0.12 0.01
4 6-May-20 Br. 1176/1 P9/4 M-35 3-Jun-20 43.56 40.58 43.42 42.52 0.12 0.02
5 43.07 44.89 43.82 43.93 1.53 2.34
6 42.89 41.11 42.22 42.07 -0.32 0.10
7 14-May-20 Br. 1176/1 P9/1 M-35 11-Jun-20 43.91 44.22 41.11 43.08 0.68 0.47
8 41.29 41.96 39.78 41.01 -1.39 1.92
9 40.58 41.91 44.71 42.40 0.00 0.00
10 20-May-20 Br. 1176/1 P9/8 M-35 17-Jun-20 42.27 43.20 41.33 42.27 -0.13 0.02
11 41.11 42.40 41.87 41.79 -0.60 0.36
12 42.80 42.04 44.89 43.24 0.85 0.72
13 21-May-20 Br. 1176/1 P9/3 M-35 18-Jun-20 42.00 42.84 40.62 41.82 -0.58 0.33
14 43.42 42.36 40.76 42.18 -0.22 0.05
15 44.27 43.02 43.24 43.51 1.11 1.24
16 27-May-20 Br. 1176/1 P9/5 M-35 24-Jun-20 40.18 41.91 44.09 42.06 -0.34 0.11
17 44.18 45.51 41.91 43.87 1.47 2.16
18 40.09 40.80 42.13 41.01 -1.39 1.93
19 28-May-20 Br. 1176/1 P9/2 M-35 25-Jun-20 41.82 43.82 41.87 42.50 0.11 0.01
20 39.91 39.64 43.42 40.99 -1.41 1.98
21 44.40 44.84 45.02 44.75 2.36 5.55
22 5-Jun-20 Br. 1176/1 P9/11 M-35 3-Jul-20 41.16 40.84 41.82 41.27 -1.12 1.26
23 41.02 43.96 44.04 43.01 0.61 0.37
24 42.93 42.09 41.56 42.19 -0.20 0.04
25 5-Jun-20 Br. 1176/1 P9/12 M-35 3-Jul-20 40.67 44.00 42.04 42.24 -0.16 0.03
26 43.38 40.89 40.09 41.45 -0.94 0.89
27 43.69 42.09 43.60 43.13 0.73 0.53
28 6-Jun-20 Br. 1176/1 P9/6 M-35 4-Jul-20 41.29 41.96 41.78 41.68 -0.72 0.52
29 40.44 43.02 43.56 42.34 -0.06 0.00
30 41.42 40.62 40.80 40.95 -1.45 2.10
= 42.40 ∑(x-)²= 26.47

N= 30 Remarks:-
(N-1) = 29
Standard Deviation (SD) = √[{∑(x-)²}/(N-1)] = 0.96

Target Mean Strength = fck+1.65*(SD) 36.58


Observed SD as 2.83 < 5.0 As per IS 10262 (2019), Table-2 & Clause
4.2.1.1(C), Hence OK
Symbols:-

X= Average 28 Days Compressive Strength of a set of Cube

=
Average 28 Days Compressive Strength of all set of Cube
N= Number of set of Cube

GPT Representative PMC Representative RVNL Representative


Name of the Project :-Construction of Important and Major Steel Girder Bridges, along with Foundation, Substructure and related protection works in connection with
MATHURA - JHANSI Third Line in Agra & Jhansi Division of North Central Railway in the State of U.P., M.P., & Rajasthan .

Client :- RAIL VIKAS NIGAM LTD.


PMC :- LEA Associates South Asia PVT. LTD.
Contractor :- GPT Infraprojects LTD.
STANDARD DEVIATION FOR CUBES FOR SINDH BRIDGE (1176/1)
GRADE:- M-35 (SAND)
Strength of 28 days Av.
Strength
Date of Pile No/ Date of for one
SL NO Casting Br. No STRUCTURE Grade Testing CUBE sample (X-) (X-)² Remarks
DETAILS CUBE 2 CUBE 3 (X)
1

1 13-Jan-20 Br. 1176/1 A1/6 M-35 10-Feb-20 42.36 42.53 44.93 43.27 -2.17 4.71
2 41.56 42.22 42.67 42.15 -3.29 10.85
3 42.44 41.87 40.98 41.76 -3.68 13.55
4 25-Jan-20 Br. 1176/1 A1/9 M-35 22-Feb-20 43.73 42.18 44.36 43.42 -2.02 4.09
5 42.93 43.20 42.09 42.74 -2.70 7.32
6 40.67 42.44 42.40 41.84 -3.61 13.02
7 10-Feb-20 Br. 1176/1 P1/7 M-35 9-Mar-20 43.91 42.80 43.16 43.29 -2.15 4.64
8 42.18 43.42 42.00 42.53 -2.91 8.48
9 41.11 42.27 40.44 41.27 -4.17 17.40
10 15-Feb-20 Br. 1176/1 A1/2 M-35 14-Mar-20 42.36 42.76 43.11 42.74 -2.70 7.30
11 43.73 43.91 41.60 43.08 -2.36 5.59
12 42.80 41.33 42.31 42.15 -3.30 10.88
13 18-Feb-20 Br. 1176/1 P1/8 M-35 17-Mar-20 43.29 44.76 43.33 43.79 -1.65 2.73
14 43.07 44.89 44.62 44.19 -1.25 1.57
15 44.98 43.33 44.58 44.30 -1.15 1.32
16 22-Feb-20 Br. 1176/1 A1/7 M-35 21-Mar-20 42.27 43.07 41.42 42.25 -3.19 10.18
17 44.31 43.47 41.87 43.22 -2.23 4.96
18 40.04 42.84 41.96 41.61 -3.83 14.68
19 28-Feb-20 Br. 1176/1 P1/10 M-35 27-Mar-20 51.24 51.20 54.40 52.28 6.84 46.72
20 55.33 56.80 54.80 55.64 10.20 104.01
21 55.51 55.64 56.67 55.94 10.50 110.15
Cube tested
22 7-Mar-20 Br. 1176/1 A1/1 M-35 4-Apr-20 45.64 46.13 45.07 45.61 0.17 0.03 on 23.04.20
23 47.33 48.67 49.20 48.40 2.96 8.73 due to
24 50.67 51.47 50.53 50.89 5.45 29.65 lockdown for
25 14-Mar-20 Br. 1176/1 P1/12 M-35 12-Apr-20 55.56 52.71 53.20 53.82 8.38 70.20 covid-19
26 52.40 52.18 51.16 51.91 6.47 41.84
27 51.02 50.93 52.44 51.46 6.02 36.22
28 25-Apr-20 Br. 1176/1 P1/11 M-35 23-May-20 44.18 43.38 43.96 43.84 -1.60 2.57
29 41.02 44.00 41.78 42.27 -3.18 10.10
30 41.11 42.36 41.47 41.65 -3.80 14.42
= 45.44 ∑(x-)²= 617.93

N= 30 Remarks:-
(N-1) = 29
Standard Deviation (SD) = √[{∑(x-)²}/(N-1)] = 4.62

Target Mean Strength = fck+1.65*(SD) 42.62


Observed SD as 3.21 < 5.0 As per IS 10262 (2019), Table-2 & Clause
4.2.1.1(C), Hence OK
Symbols:-

X= Average 28 Days Compressive Strength of a set of Cube

=
Average 28 Days Compressive Strength of all set of Cube
N= Number of set of Cube

GPT Representative PMC Representative RVNL Representative


Name of the Project :-Construction of Important and Major Steel Girder Bridges, along with Foundation, Substructure and related protection works in connection with
MATHURA - JHANSI Third Line in Agra & Jhansi Division of North Central Railway in the State of U.P., M.P., & Rajasthan .

Client :- RAIL VIKAS NIGAM LTD.


PMC :- LEA Associates South Asia PVT. LTD.
Contractor :- GPT Infraprojects LTD.
STANDARD DEVIATION FOR CUBES FOR SINDH BRIDGE (1176/1)
GRADE:- M-35 (SAND)
Strength of 28 days Av.
Strength
Date of Pile No/ Date of for one
SL NO Casting Br. No STRUCTURE Grade Testing CUBE sample (X-) (X-)² Remarks
DETAILS CUBE 2 CUBE 3 (X)
1

1 9-Dec-19 Br. 1176/1 A1/14 M-35 6-Jan-20 40.98 42.44 41.16 41.53 -0.90 0.82
2 42.67 41.87 43.56 42.70 0.27 0.07
3 43.07 42.04 41.51 42.21 -0.22 0.05
4 9-Dec-19 Br. 1176/1 P1/5 M-35 6-Jan-20 41.56 41.96 42.13 41.88 -0.55 0.30
5 43.20 41.33 40.09 41.54 -0.89 0.79
6 43.91 42.76 41.87 42.85 0.42 0.17
7 13-Dec-19 Br. 1176/1 A1/5 M-35 10-Jan-20 42.27 41.24 43.38 42.30 -0.13 0.02
8 43.47 43.87 43.02 43.45 1.02 1.05
9 42.40 43.91 40.80 42.37 -0.06 0.00
10 13-Dec-19 Br. 1176/1 A1/11 M-35 10-Jan-20 40.71 42.80 42.67 42.06 -0.37 0.14
11 42.00 44.27 43.27 43.18 0.75 0.56
12 41.91 41.60 42.93 42.15 -0.28 0.08
13 18-Dec-19 Br. 1176/1 A1/10 M-35 15-Jan-20 43.87 43.07 43.47 43.47 1.04 1.08
14 42.89 40.98 41.64 41.84 -0.59 0.35
15 43.96 39.51 42.71 42.06 -0.37 0.14
16 28-Dec-19 Br. 1176/1 A1/4 M-35 25-Jan-20 43.87 40.00 41.87 41.91 -0.52 0.27
17 43.29 43.51 42.31 43.04 0.61 0.37
18 43.96 41.69 40.62 42.09 -0.34 0.12
19 29-Dec-19 Br. 1176/1 A1/12 M-35 26-Jan-20 42.44 43.47 42.76 42.89 0.46 0.21
20 43.51 42.31 43.33 43.05 0.62 0.38
21 41.42 41.60 41.91 41.64 -0.79 0.62
22 29-Dec-19 Br. 1176/1 P1/3 M-35 26-Jan-20 40.22 41.78 43.91 41.97 -0.46 0.21
23 43.47 43.56 41.02 42.68 0.25 0.06
24 43.69 42.27 43.16 43.04 0.61 0.37
25 7-Jan-20 Br. 1176/1 P1/6 M-35 4-Feb-20 43.69 42.22 42.49 42.80 0.37 0.14
26 43.24 41.60 44.27 43.04 0.61 0.37
27 40.22 43.33 40.53 41.36 -1.07 1.14
28 9-Jan-20 Br. 1176/1 A1/8 M-35 6-Feb-20 42.80 41.82 43.87 42.83 0.40 0.16
29 43.11 41.42 40.71 41.75 -0.68 0.47
30 42.36 43.38 43.96 43.23 0.80 0.65
= 42.43 ∑(x-)²= 11.16

N= 30 Remarks:-
(N-1) = 29
Standard Deviation (SD) = √[{∑(x-)²}/(N-1)] = 0.62

Target Mean Strength = fck+1.65*(SD) 36.02


Observed SD as 1.20 < 5.0 As per IS 10262 (2019), Table-2 & Clause
4.2.1.1(C), Hence OK
Symbols:-

X= Average 28 Days Compressive Strength of a set of Cube

=
Average 28 Days Compressive Strength of all set of Cube
N= Number of set of Cube

GPT Representative PMC Representative RVNL Representative


Name of the Project :-Construction of Important and Major Steel Girder Bridges, along with Foundation, Substructure and related protection works in connection with
MATHURA - JHANSI Third Line in Agra & Jhansi Division of North Central Railway in the State of U.P., M.P., & Rajasthan .

Client :- RAIL VIKAS NIGAM LTD.


PMC :- LEA Associates South Asia PVT. LTD.
Contractor :- GPT Infraprojects LTD.
STANDARD DEVIATION FOR CUBES FOR SINDH BRIDGE (1176/1)
GRADE:- M-35 (SAND)
Strength of 28 days Av.
Strength
Date of Pile No/ Date of for one
SL NO Casting Br. No STRUCTURE Grade Testing CUBE sample (X-) (X-)² Remarks
DETAILS CUBE 2 CUBE 3 (X)
1

1 28-Jun-19 Br. 1176/1 P1/9 M-35 26-Jul-19 37.90 44.93 40.80 41.21 0.21 0.05
2 45.73 42.84 44.26 44.28 3.28 10.76
3 14-Jul-19 Br. 1176/1 A1/20 M-35 11-Aug-19 43.02 48.26 39.68 43.65 2.66 7.06
4 36.00 44.48 45.33 41.94 0.94 0.89
5 49.06 35.46 43.20 42.57 1.58 2.49
6 22-Jul-19 Br. 1176/1 P1/1 M-35 19-Aug-19 36.44 42.17 37.06 38.56 -2.44 5.95
7 40.88 39.86 37.73 39.49 -1.51 2.27
8 39.55 41.79 38.66 40.00 -1.00 0.99
9 2-Aug-19 Br. 1176/1 A1/18 M-35 30-Aug-19 43.15 38.35 36.17 39.22 -1.77 3.14
10 37.42 41.60 41.11 40.04 -0.95 0.91
11 39.73 41.24 39.82 40.26 -0.73 0.54
12 31-Aug-19 Br. 1176/1 P1/4 M-35 28-Sep-19 41.20 41.64 40.08 40.97 -0.02 0.00
13 39.91 40.88 39.60 40.13 -0.87 0.75
14 40.84 41.20 40.66 40.90 -0.10 0.01
15 6-Sep-19 Br. 1176/1 A1/16 M-35 4-Oct-19 39.73 38.13 40.53 39.46 -1.53 2.35
16 39.82 40.13 42.75 40.90 -0.10 0.01
17 41.51 41.45 40.84 41.27 0.27 0.07
18 7-Sep-19 Br. 1176/1 A1/19 M-35 5-Oct-19 41.60 37.91 42.84 40.78 -0.21 0.05
19 39.51 38.75 40.88 39.71 -1.28 1.64
20 41.37 42.22 40.62 41.40 0.41 0.17
21 28-Sep-19 Br. 1176/1 A1/3 M-35 26-Oct-19 40.44 39.64 38.84 39.64 -1.36 1.84
22 41.20 40.66 39.86 40.57 -0.42 0.18
23 41.60 41.37 38.97 40.65 -0.35 0.12
24 42.88 41.60 42.30 42.26 1.26 1.60
25 18-Nov-19 Br. 1176/1 A1/17 M-35 16-Dec-19 40.89 38.93 41.16 40.33 -0.67 0.45
26 41.24 43.20 39.64 41.36 0.36 0.13
27 42.58 41.42 42.04 42.01 1.02 1.04
28 28-Nov-19 Br. 1176/1 A1/15 M-35 26-Dec-19 40.53 39.07 42.04 40.55 -0.45 0.20
29 42.76 39.20 41.16 41.04 0.04 0.00
30 41.60 43.73 40.67 42.00 1.00 1.01
31 28-Nov-19 Br. 1176/1 A1/13 M-35 26-Dec-19 43.20 37.29 42.93 41.14 0.14 0.02
32 43.87 40.53 40.00 41.47 0.47 0.22
33 42.80 44.09 41.29 42.73 1.73 3.00
34 29-Nov-19 Br. 1176/1 P1/2 M-35 27-Dec-19 40.80 43.07 43.47 42.45 1.45 2.11
35 41.91 39.82 40.58 40.77 -0.23 0.05
36 41.60 41.16 43.51 42.09 1.09 1.20
= 41.00 ∑(x-)²= 53.24

N= 36 Remarks:-
(N-1) = 35
Standard Deviation (SD) = √[{∑(x-)²}/(N-1)] = 1.23

Target Mean Strength = fck+1.65*(SD) 37.04


Observed SD as 1.23 < 5.0 As per IS 10262 (2019), Table-2 & Clause
4.2.1.1(C), Hence OK
Symbols:-

X= Average 28 Days Compressive Strength of a set of Cube

=
Average 28 Days Compressive Strength of all set of Cube
N= Number of set of Cube

GPT Representative PMC Representative RVNL Representative


Construction of Important and Major Steel Girder Bridges, along with Foundation, Substructure and related protection works in connection with
Name of the Project :- MATHURA - JHANSI Third Line in Agra & Jhansi Division of North Central Railway in the State of U.P., M.P., & Rajasthan .

Client :- RAIL VIKAS NIGAM LTD.


PMC :- LEA Associates South Asia PVT. LTD.
Contractor :- GPT Infraprojects LTD.
STANDARD DEVIATION FOR CUBES FOR SINDH BRIDGE (1176/1)
GRADE M35 (M-SAND)
Strength of 28 days Avg.
Pile No/ Strength
SL Date of Date of
Br. No STRUCTURE Grade for one (X-) (X-)² Remarks
NO Casting Testing CUBE 1 CUBE 2 CUBE 3
DETAILS sample
(X)
1 11-Jul-20 Br. 1176/1 Pile P10/5 M-35 8-Aug-20 41.47 40.90 42.09 41.49 0.86 0.75
2 40.76 41.29 39.87 40.64 0.02 0.00
3 42.09 43.20 42.62 42.64 2.01 4.06
4 17-Jul-20 Br. 1176/1 Pile P10/11 M-35 14-Aug-20 40.71 41.02 40.18 40.64 0.01 0.00
5 40.49 41.42 40.40 40.77 0.15 0.02
6 39.91 40.76 41.82 40.83 0.21 0.04
7 25-Jul-20 Br. 1176/1 Pile P10/15 M-35 22-Aug-20 40.75 40.62 40.27 40.55 -0.08 0.01
8 39.69 38.89 39.47 39.35 -1.27 1.62
9 41.02 39.73 40.49 40.41 -0.21 0.04
10 27-Jul-20 Br. 1176/1 Pile P10/4 M-35 24-Aug-20 40.04 39.64 40.93 40.20 -0.42 0.18
11 41.42 40.53 41.24 41.06 0.44 0.19
12 39.87 39.47 40.40 39.91 -0.71 0.50
13 5-Aug-20 Br. 1176/1 Pile P10/1 M-35 2-Sep-20 39.07 39.51 39.69 39.42 -1.20 1.44
14 40.93 39.42 39.96 40.10 -0.52 0.27
15 41.60 40.53 41.82 41.32 0.69 0.48
= 40.62 ∑(x-)²= 9.60
N= 15 Remarks:-
(N-1) = 14
Standard Deviation (SD) = √[{∑(x-)²}/(N-1)] = 0.83
Target Mean Strength = fck+1.65*(SD) 36.37
Remarks:-

Observed SD as 2.82< 5.0 As per IS 10262 (2019), Table-2 & Clause 4.2.1.1(C), Hence OK
Symbols:-

X= Average 28 Days Compressive Strength of a set of Cube

=
Average 28 Days Compressive Strength of all set of Cube
N= Number of set of Cube

GPT Representative PMC Representative RVNL Representative


Strength of 28
Pile No/ CUBE
Date of Date of
SL NO Br. No STRUCTURE Grade 1
Casting Testing
DETAILS

1 7-Jun-20 Br. 1176/1 P1 Pile Cap M-35 5-Jul-20 43.47


2 45.64
3 43.87
4 44.89
5 46.22
6 45.64
7 43.96
8 44.98
9 45.29
10 14-Jun-20 Br. 1176/1 A1 Pile Cap M-35 12-Jul-20 44.58
11 41.87
12 41.16
13 43.20
14 44.98
15 44.49
16 45.02
17 42.62
18 44.36
19 43.68
20 44.22

N= 20
(N-1) = 19
Standard Deviation (SD)
√[{∑(x-)²}/(N-1)] = 1.17
=
Target Mean Strength = fck+1.65*(SD) 36.92
Observed SD as 2.82< 5.0 As per IS 10262 (2019), Table-2 & Clause
4.2.1.1(C), Hence OK
Symbols:-
Average 28 Days Compressive Strength of a set
X=
of Cube
Average 28 Days Compressive Strength of all set of
= Cube
N= Number of set of Cube

GPT Representative PMC Represe


Strength of 28 days Avg.
CUBE CUBE 3 Strength
2 for one (X-) (X-)² Remarks
sample (X)

43.69 42.89 43.35 -0.68 0.47


45.29 45.51 45.48 1.45 2.09
44.40 44.53 44.27 0.23 0.05
45.33 44.71 44.98 0.94 0.89
45.16 45.24 45.54 1.51 2.27
44.80 45.42 45.29 1.25 1.57
44.40 44.76 44.37 0.34 0.11
46.04 45.38 45.47 1.43 2.05
44.84 46.18 45.44 1.40 1.97
45.33 45.78 45.23 1.20 1.43
43.78 44.62 43.42 -0.61 0.37
40.98 43.11 41.75 -2.28 5.22
45.02 43.82 44.01 -0.02 0.00
41.78 42.44 43.07 -0.97 0.94
42.22 43.11 43.27 -0.76 0.58
42.00 42.89 43.30 -0.73 0.53
41.78 42.00 42.13 -1.90 3.62
42.53 43.20 43.36 -0.67 0.45
42.67 42.44 42.93 -1.10 1.22
44.00 43.87 44.03 0.00 0.00
= 44.03 ∑(x-)²= 25.82
Remarks:-
PMC Representative RVNL Representative

You might also like