1176/1 Sindh Bridge Lateral Load Test Summary

Design Cut-Off Foundation Anchor Total Net Reaction Cut-Off Foundation Anchor Total Net
Start Date End Date Load Test Load Test Pile Level Level Length Deflection Rebound Deflection Pile Level Level Length Deflection Rebound Deflection
Routine Lateral Pile
Load Test A1 pile 18-05-2020 20-05-2020 19 28.5 A1-9 189.575 176.575 8.50 4.47 4.11 0.36 A1-4 189.575 177.090 8.00 9.53 8.06 1.47
group

Routine Lateral Pile


Load Test P10 pile 18-02-2021 20-02-2021 8.2 12.3 P10-7 186.549 168.981 7.32 3.66 3.47 0.19 P10-8 186.549 168.276 7.32 2.86 2.53 0.33
group