BRIDGE DECK WEARING COURSE:

Mastic Asphalt is a bituminous design mix containing ingredients bitumen, coarse


aggregate, fine aggregate and filler material. It is working as a waterproofing material
and used as wearing course for a whole range of construction work of roads and
bridges. It protects structural concrete and flexible pavement top from wear and
tears due to environmental impact. Percentage of bitumen content consider for the
design of mastic asphalt is preferably 14 – 17%. Nowadays it is also used for roofing,
tanking and flooring to avoid seepage of water.

Mastic Asphalt for Roads and Bridges


Construction of Mastic Asphalt:
Construction materials for Bitumen Mastic:
The following construction materials are used for the execution of mastic works:

Bitumen: Industrial Bitumen of grade 85/25 having Softening point of 50-90°C and
Penetration at 25°C in 1/100 cm is 10-40 satisfying all requirement of IS:702-1988.
Coarse Aggregates: Coarse aggregates will be from an approved source, consist of
crushed rock of aggregate impact value not more than 20 and abrasion value not
more than 40 and satisfying all other requirements and they will be clean, hard and
durable of the cubical shape, free from dust and soft or brittle matter, organic or
other harmful substances.
Fine Aggregates: Fine Aggregates will be from an approved source, consist of crushed
stone satisfying requirements and they shall be clean, hard and durable, dry and free
from dust and soft or brittle matter, organic and other harmful matter.
Filler: Filler will be limestone powder passing 75 microns IS sieve and shall have a
calcium carbonate content of not less than 80% by weight conforming to IS:1195-
1978 and satisfying the requirements.
Equipment and Machinery for Mastic Asphalt Construction:
The following equipment and machinery are used for the execution of mastic works:

• Bitumen Mastic cooker – ½-1 tonne capacity-1no


• Tack coat spraying appliance
• Wheelbarrows and Flat mortar pans adequate in numbers to suit to the
requirements
• Wooden trowels, heavy wooden floats, suitable hand tools, guage, straight edge
and hand level
• Angle irons or wooden strips required to contain the mastic in required width and
thickness
• Water tanker – 1 number
• Broomer – 1 number
• Air compressor – 1 number
• Measuring can
Survey and Setting Out Works for Bitumen Mastic:
The limits of mastic asphalt marked as per the established grid lines and benchmarks
etc. after completion of the BC laying as per approved construction drawings.

Preparation of Mastic Asphalt Mix and Transportation:


Mastic Asphalt manufacture involves the following stages:

• The required quantity of materials for the mix will be converted to volumes with
the help of a measuring can.
• Heating of filler alone will be done to a temperature of 170 – 200°C in a
mechanically agitated mastic cooker.
• Half the required quantity of bitumen heated to 170 – 180º C will be added with
filler and cooked for one hour after proper mixing.
• Fine aggregate and another half bitumen (at 170 – 180º C) will be added to the
above-prepared mix in the cooker and heated at 170 – 200º C for another hour.
• After that, the required quantity of coarse aggregates will be added, and heating of
the mix will continue for an extra one hour.
• During mixing and cooking, utmost care should be taken to ensure that the mix in
the cooker at no time heated to a temperature exceeding 205ºC.
If the material is not required for instant use, will be cast into blocks of each weighing
about 25 kg. The Bitumen Mastic blocks (without Coarse Aggregates), when
subsequently meant to be used at the site, will be transported to the site. The blocks
will be broken into pieces of size not exceeding 60mm cube and re-melted in the
cooker at a temperature of 170 – 200º C.

Mastic Asphalt Laying:


Preparation of Base for Bitumen Mastic:
• The base, i.e. the BC surface over which Bitumen Mastic is to be done will prepared,
shaped and conditioned.
• The surface will be swept clean and made free from dust and other harmful
matter.
• Spots rich in binder shall be scraped and repaired.
• The Tack Coat will be applied under clause 503 of MORTH. The rate of application
shall be as per Table 500-2 of MORTH.
• The tack coat will be left to cure until all the volatiles has evaporated before any
subsequent construction is started.
• To receive and contain the mastic MS angle section or wooden strips of size 25 mm
are placed at required spacing till the finish of the job.
Transportation of Mix:
The mix will be transported in the wheelbarrows/flat mortar pans. To prevent sticking
of the molten material to wheelbarrows/mortar pans, the inside of the same will be
sprinkled with a minimum quantity of fine inorganic material limestone filler dust.
However, in case, the mix is to be transported over a long distance, the same shall
be done with towed mixer transporter with adequate provision for a stirring
arrangement so as to keep the aggregates and filler suspended in the mix till the time
of laying.

Laying of Mastic Asphalt Mix:


• The Bitumen Mastic will be deposited directly on the prepared base immediately
in front of the spreader where it is spread uniformly by means of wooden floats to
the required thickness.
• The mix will be laid in one-meter width confined between standard angle iron or
wooden strips of size 25 mm to receive and contain the mastic of required
thickness.
• The temperature of the mix at the time of laying will be at least 170º C.
• In case blowing takes place while laying the Bitumen Mastic, the bubbles will be
punctured while it is hot and the surface treated well.
• Extreme care will be taken while fixing angle iron or wooden strips, and their level
checked with the instrument at suitable intervals.
Laying of Mastic Asphalt Mix
Mastic Asphalt Joints:
All construction joints will be made by warming the existing Bitumen Mastic by
application of an excess quantity of hot bitumen mastic, which afterwards will be
stripped off to make it flush with the surface on the other side.

Mastic Asphalt Joints


Surface Finish of Mastic:
After spreading the Mastic Asphalt bitumen pre-coated aggregates of approved
quality of 9.5 – 13.2 mm size is pressed or rolled into the surface when the
temperature of mastic asphalt is between 80 – 100ºC. The chips shall be pre-blended
with S 65 grade bitumen where lime powder may be added over it to avoid sticking
with one another. Flakiness Index of stone aggregates used for anti-skid measures
will be less than 25%.

Surface Finish of Bitumen Mastic


Limitations to Construction of Mastic Asphalt:
Laying will be postponed while free-standing water is present on the surface over
which mastic asphalt is to be laid, or during rain, fog and dust storms. After the rain,
the water present over the bituminous surface should be blown off with a high-
pressure air jet, or the surface left to dry before laying. Laying of mastic, asphalt mix
will not be permitted below 10ºC or when the wind speed exceeds 40 km/hr at 2.0 m
height.

Opening to Traffic:
We can allow traffic after completion of the work when the Mastic Asphalt
temperature at the mid-depth of the completed layer has cooled to the daytime
maximum ambient temperature.