FRAME LINES: 1 2 3 4 5 6 NOTES FOR REACTIONS

C A
COLUMN LINE 1. All loading conditions are examined and only maximum/minimum H or V and the
corresponding H or V are reported.
2. Positive reactions are as shown in the sketch. Foundation loads are in
opposite directions.
3. Bracing reactions are in the plane of the brace with the H pointing away
from the braced bay. The vertical reaction is downward.
4. Building reactions are based on the following building data:
Width (mm) = 10800
Length (mm) = 35710
Eave Height (mm) = 7000 (F.F.L)
Roof Slope (rise/100) = 1:10
Collateral Load (kN/m2) = 0.05
Live Load (kN/m2) = 0.57
Wind Speed (m/s ) = 160
H H Wind Code = MBMA 96
Closed/Open C
V V Importance Wind = 1.00
Seismic Zone = C
RIGID FRAME: BASIC COLUMN REACTIONS (kN)
Frame Column -----Dead---- --Collateral- -----Live---- --Wind_Left1- -Wind_Right1- --Wind_Left2-
Line Line Horiz Vert Horiz Vert Horiz Vert Horiz Vert Horiz Vert Horiz Vert
1* C 1.0 8.0 0.2 1.2 2.7 14.1 -28.7 -55.4 21.1 -6.6 -34.7 -44.2
1* A -1.0 8.0 -0.2 1.2 -2.7 14.1 -21.1 -6.6 28.7 -55.4 -15.0 4.7
2* C 1.6 11.3 0.4 2.3 4.9 26.1 -33.1 -72.9 28.6 -13.4 -44.4 -52.0
2* A -1.6 11.3 -0.4 2.3 -4.9 26.1 -28.6 -13.4 33.1 -72.9 -17.3 7.5

Frame Column -Wind_Right2- --Wind_Long1- --Wind_Long2- -Seismic_Left Seismic_Right -Seismic_Long


Line Line Horiz Vert Horiz Vert Horiz Vert Horiz Vert Horiz Vert Horiz Vert
1* C 15.0 4.7 9.3 -34.2 7.6 -27.9 -3.8 -6.0 3.8 6.0 0.0 0.0
1* A 34.7 -44.2 -7.6 -27.9 -9.3 -34.2 -3.8 6.0 3.8 -6.0 0.0 0.0
2* C 17.3 7.5 19.5 -61.8 17.6 -54.9 -5.0 -7.9 5.0 7.9 0.0 -13.6
2* A 44.4 -52.0 -17.6 -54.9 -19.5 -61.8 -5.0 7.9 5.0 -7.9 0.0 -13.6
..
1*
2*
Frame lines:
Frame lines:
1 6
2 3 4 5 NOTE: INCREASE ALL REACTIONS BY 15/
ENDWALL COLUMN: BASIC COLUMN REACTIONS (kN)
Wind Wind
FOR INFORMATION ONLY &
Frm Col Dead Press Suct 0 06.08.18
NOT FOR CONSTRUCTION
AS MI HAB
Line Line Vert Horz Horz
REV. DATE DESCRIPTION DRN CHK DSN
1 B 2.4 -38.4 38.4
6 B 2.4 -38.4 38.4
Optimus construction (Pvt) LTD

JOB NO / QUOTE NO. : HHR-189-20 (B#12)

PROJECT NAME : OPEN EXAMINATION AREA

CUSTOMER : NLC
JOBSITE LOCATION : TORKHAM
DRAWING TITLE : DWG.NO.

ANCHOR BOLT REACTIONS


D-01
1 6
35710 OUT-TO-OUT OF STEEL
2 3 4 5
7305 7000 7100 7000 7305

C
X-Bracing X-Bracing
B C C C C B
10800 OUT-TO-OUT OF STEEL

5400

B
A A
5400

B C C C C B

X-Bracing X-Bracing
A

ANCHOR BOLT PLAN

FOR INFORMATION ONLY &


0 06.08.18 AS MI HAB
NOT FOR CONSTRUCTION
REV. DATE DESCRIPTION DRN CHK DSN

Optimus construction (Pvt) LTD


250 200 225
EW
Ro
ta
te
90

JOB NO / QUOTE NO. : HHR-189-20 (B#12)


350

555

555

100 100 100 PROJECT NAME : OPEN EXAMINATION AREA


125 227 227 CUSTOMER : NLC
JOBSITE LOCATION : TORKHAM
50 50 50 50 50 50
EW SW SW DRAWING TITLE : DWG.NO.
See Plan See Plan
ANCHOR BOLT PLAN
DETAIL A DETAIL B DETAIL C D-02