Standardized Work
Department: Die maint revision
Position: all
PAD CHECK date:
Make sure to
always verify how
#1 flipping upper die safety
the pad is held
in .
Always double
check that all
pads are secured
#3 flipping upper die safety by all retainer
blocks and spool
retainers before
flipping upper die
MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562926559.xlsx date of last revision: 14Feb17
UNCONROLLED IF PRINTED
# details
WIP Measurement/ Quality Check
Setting
Prepared By:
Checked By:
Approved By:
revision date Name
MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562926559.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED
Standardized Work
Department: revision
Position: date:
Prepared By:
Checked By:
WIP Measurement/ Quality Check Safety
Setting
Approved By: # details revision date Name
MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562926559.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED
Standardized Work
Department: Die Maintenance revision
Position: All
Flipping Upper Die Safety date: 4/13/2020
MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562926559.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED
Standardized Work
Department: revision
Position: date:
Prepared By:
Checked By: Measurement/
WIP Setting Quality Check Safety
Approved By: # details revision date Name