Standardized Work
Department: Die Maint revision
Position: All
Heating steels before and after Welding date: 11/7/2018

Task # Work Element Description Key Points Notes/ Diagrams


1

Prepared By:

MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562925734.xlsx date of last revision: 14Feb17
UNCONROLLED IF PRINTED

Checked By:

Approved By: # WIP Measurement/ Quality Check


details Name
revision date
Setting

MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562925734.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED

Standardized Work
Department: revision
Position: date:

Task # Work Element Description Key Points Notes/ Diagrams

Prepared By:

Checked By:
WIP Measurement/ Quality Check Safety
Setting
Approved By: # details revision date Name

MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562925734.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED

Standardized Work
Department: revision
Position: date:

Task # Work Element Description Key Points Notes/ Diagrams

Prepared By:

Checked By: Measurement/ Quality Check Safety


WIP Setting
Approved By: # details revision date Name

MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562925734.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED

Standardized Work
Department: Die Maint revision
Position: All
PF8 Forklift Instructions and Considerations date: 10-Dec-19

Task # Work Element Description Key Points Notes/ Diagrams

Start-Up Checks and Operation Standards are located with crane and tool room
#1 Inspection of the truck before operation.
equipment checksheet. If associate needs assistance ask T.L. to lend a hand.

PF8 is typically used for tooling transport from 2500ton presses (A,B,C). DO NOT
Be mindful of truck load capacity, width and
#2 length.
use PF8 for 250T nor 250S dies. This rule goes for 250S dies especially; trying to
place 250S tooling in die storage rack is likely to result in Topre property damage.

Always check and take into account the following: weight of inteneded load, center
of mass and how much it overhangs(side-to-side) and/or extends beyond forks. If
#3 Load and lifting considerations.
associate is unsure about truck capacities see specification plate mounted on
dash.

Operating the lift truck is much like driving your own vehicle. Use both hands when
climbing aboard. Wear your lap belt and use the horn to signal your location. Be
#4 Personnel expectations.
alert, Topre is a busy place, lift trucks are around every corner. Practice caution
every second of operation. Good judgement goes a long way.

Always place forks on the floor, thinnest section lying flat when vehicle is parked.
Propane bottles are to be placed inside their cabinet when empty. Always use the
#5 Other things worth noting.
parking brake. Take care when manuvering in tight areas, the trucks forks and
counterweight protrude further than most realize.

Check The
Weight.

Prepared By: Zach Copeland


Measurement/
Checked By: Jamie Holmes WIP Setting Quality Check Safety

MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562925734.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED

Measurement/
WIP Setting
Approved By: Chris Jones # details revision date Name

MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562925734.xlsx date of last revision: 14Feb17

You might also like