You are on page 1of 4

UNCONROLLED IF PRINTED

Standardized Work
Department: Die Maintenance revision
Position: Die Makers
Control plan use for damaged dies date: 2-Feb-17
When to get CP Notes/ Diagrams
Pic 1 Die Sketch
After die damage assessment
1 and broke punch or punches
have been found

Cp has to be
2 Get CP from supervisor or TL updated thru
Engineering

CP should never
leave die at that
Immediately place Control point. CP should
3 Plan on die for all shifts to be stapled with
use. other paper work
going back to
press.

How To Use CP

Find location number of


1 See Pic. 1
punch info needed on sketch.

Using the number from the


2 sketch compare with parts See Pic. 2
list using parts list

Please beaware
and ask questions
if you find a
descrepancy.
Pic. 2 Parts List

Prepared By: 1
WIP Measurement/
Setting Quality Check Safety
Checked By: Chris Jones

Approved By: Chris Jones #


details revision date Name

MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562926666.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED

Standardized Work
Department: revision
Position: date:

Task # Work Element Description Key Points Notes/ Diagrams

Prepared By:

Checked By:
WIP Measurement/ Quality Check Safety
Approved By: # Setting
details revision date Name

MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562926666.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED

Standardized Work
Department: revision
Position: date:

Task # Work Element Description Key Points Notes/ Diagrams

Prepared By:

Checked By: Measurement/ Quality Check Safety


WIP Setting
Approved By: # details revision date Name

MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562926666.xlsx date of last revision: 14Feb17
UNCONTROLLED IF PRINTED

Standardized Work
Department: Die Maintenance revision
Position: All Positions
When/How to use Change Point Notice (CPN) date:

Task # Work Element Description Key Points Notes/ Diagrams


1 Identify when CPN is needed. Die repair or pm
requires a punch replacement

* Die repair requires the repair of a broke trim insert


that could change trim line.

Die repair requires the installation and repair of


* any new form, bend, flange, restrike, or extrusion
block/detail, that could change part quality.

Die repair requires the repair of any gauging for


* blank location or binder set/leveling blocks
Die repair requires a quality requested level-
* up,trim change, or hole location move.

How to use CPN. Obtain CPN from designated See Supervisor if CPN is not
2 areas in die shop. available.
Fill in all boxes and give detailed description of
3 change point.
Attach pictures to CPN if available, if not draw a
4 quick sketch of area worked on.
After completion of repair, place CPN securely on
5 die in designated sleeve.

Prepared By:
Checked By: Measurement/
WIP Quality Check Safety
Setting
Approved By: # details revision date Name

MFG Proc No 249 Rev Level 000 file:///conversion/tmp/activity_task_scratch/562926666.xlsx date of last revision: 14Feb17