ALL-PILE Version 6 CivilTech Software www.civiltech.

com Licensed to

PILE DEFLECTION & FORCE vs DEPTH


Y-Back, Single Pile, Kbc =2

Depth (Zp) DEFLECTION, yt -cm MOMENT -kN-m SHEAR -kN Depth (Zp)
from from
Pile Top-m -0.02 0 +0.02 -100 0 +100 -100 0 +100  -kN/m3  C-kN/m2 k-MN/m3e50 % Pile Top-m
0 0
20.8 0.0 101.7 178.2 0.63
Soft Clay

2 2
20.8 0.0 107.7 192.3 0.61
Stiff Clay

4 4
11.0 0.0 113.7 206.5 0.59
Stiff Clay
yt=0 at 5.4-m
6 6
St=0 at 7.1-m
8 8
9.9 39.0 0.0 33.3
Sand

10 10

12 12
11.7 42.1 0.0 53.5
Sand/Gravel

14 14

16 16
Tip yt=3.31E-5 Top yt=1.89E-2 Top Moment=-94.9 Top Shear=79.5
Max. yt=1.89E-2 Max. Moment=94.9 Max. Shear=79.5 E -MP=199930
Top St=-8.39E-20 I'-cm4=12660
18 18

20 20

22 22

24 24

26 26

28 28

30 30

PANCANG BAJA ABUTMEN


Quancons Forensik Indonesia
AWE Diameter =JEMBATAN
60 CM KALIORANG 5.0