Professional Documents
Culture Documents
Gamma Ray Corrections For Barite Mud in Small Boreholes
Gamma Ray Corrections For Barite Mud in Small Boreholes
Schlumberger
1.2
GR 1.0
ed
ter
cen
l,
0.8 too
6-
in.
11 ⁄1
1
Bmud 0.6 ed
nter
l , ecce
. too
6-in
0.4 111 ⁄1
ered
o l , cent
in . to
33 ⁄8-
0.2 d
centere
tool, ec
33 ⁄8-in.
0.0
7 8 9 10 11 12 13 14 15 16 17 18 19 20
Mud weight (lbm/gal)
1.2
1.0
0.8
l
too
Fbh 0.6
in.
⁄8-
33
l
oo
.t
0.4
-in
⁄16
1 11
0.2
0.0
0 1 2 3 4 5 6 7 8 9 10
dh – dsonde (in.)
© Schlumberger
These charts correct for the barite mud effect in hole sizes Example: With the same conditions shown in the example on
smaller and larger than the 8-in. standard. In these cases, the Chart GR-1 except for a 6-in. hole, t = 4.8 g/cm2,
correction factor from Chart GR-1 is multiplied by the borehole resulting in a correction factor of 0.95. Using Chart
correction factor 1 + Bmud × Fbh. GR-2, Bmud = 0.15 and Fbh = 0.81 for a borehole cor-
rection of 1.12 and a revised correction factor of 1.06.
The corrected GR = 38 API units.
2-2