COMPLETE THE TABLE

PROJECT Modify the Plug


ACTIVITY
[Activity stated in
Gantt chart]
PLANNING
Describe the activities We will take all the items that have arrived and hold a face -to -face meeting
that you have been
to discuss the set up system that we will make in order to facilitate the
planned for this week
to complete the custom process in this project.
PROJECT ACTIVITY
WORK DONE
Planned We chose to modify the PLUG to connect the pump with RELAY. With this
work/activities that
the process will move by using only one button switch to control all the
has been completed
[brainstorming, CDIO, pumps. With this also, can simplify the process to use Water Change if the
analysis etc...] project is completed. So we have to solder the wire to be connected with the
PLUG to avoid easy disconnection.

FINDINGS
Result/ Issue/ Among our issues should be, making sure that the wire with the copper
problem/
inside the PLUG sticks neatly .This is because to prevent the electric current
Information gathered
from work done from not being able to flow and cause our objectives will not be achieved.In
addition, we must make sure that the system can move and save for used.

CONCLUSION In conclusion, we managed to design the system and it works well as we


[Conclude on the want. In addition, the system we created is safe to use. However, we have to
all the task base on change a little more because to avoid being exposed to water splashes to
project activity] ensure it is safer to use.

DATE: 26/10/2021 (WEEK 4)) RECEIVED DATE:


PREPARED BY:
SIGNATURE OF SUPERVISOR:
SIGNATURE OF STUDENT: NAME:

NAME: NIK ABDUL HADI WAFA BIN COMMENT:


MUHAMAD RUSDI

Prepared by Mohammad Aizrulshah Kamaruddin