Professional Documents
Culture Documents
Part : 1 Page : 1 of 2
* Country: Pakistan
Project Name or Spot Inspection: PSI of Pre Engineered Building Project Ref. No.:
* Email:
* Equipment/Goods PEB
Description:
* Applicable Norms, Standards: N/A
Final Destination of Equipment/Goods: Pakistan
Part : 1 Page : 2 of 2
Other Instructions
No Overtime
Please co-ordinate with vendor to make sure everything in place before visit i.e. material available for inspection and
documents to be arranged beforehand.
Inspection Report to be sent by next day after completion
PI to be sent immediately after job completion
IWO No : Reference No.
Part : 1 Page : 1 of 2