Project Number : L-032

Sub. District: Iliomar HIDROLIC CALCULATION


Suco/Aldeia : Iliomar II / Caidabu

Reach Distance (m) Pipe used Reduced level (m) Elevation Elevation Frictional Total
Design Flow Residual
( Q) l/s Design HDPE different from factor/100 Head loss Head HGL (m) Remarks
head (m)
From To Actual d*1.05 Chainage GIP (") (mm) Upper Lower (m) intake (m) (m) loss(m)

Intake CT (P10) 0.5 200 210 210 DN.50 mm 1000 994 6 6 0.37 0.74 0.74 5.26 999.26

P10 P21 0.5 900 945 1155 DN.40mm 994 981 13 19 0.37 3.33 4.07 14.93 990.67

P21 RT 0.5 450 472.5 1627.5 11/2" 981 985 -4 15 0.37 1.66 5.735 10.93 979.34

RT T1 0.5 200 210 1837.5 DN.40mm 985 982 3 18 0.37 0.74 2.26 2.26 984.26

T1 T2 0.43 100 105 1942.5 DN.40mm 982 980 2 20 0.78 0.78 4.26 3.48 979.22

T2 T3 0.37 100 105 2047.5 DN.32 980 977 3 23 1.73 1.73 5.99 5.53 978.27

T3 T4 0.31 150 157.5 2205 DN.32 977 974 3 26 1.28 1.92 5.99 6.61 975.08

T4 T5 0.21 150 157.5 2362.5 DN.32 974 972 4 28 0.61 0.91 6.9 7.08 973.09

Prepared by : Checked by : Approved by :


Date : Date : Date :
Reservoir sizing
Project Title : New Water supply Fy : 2004
Location : Suco Iliomar II aldeia Caidabu Phase I
Sub.District : Iliomar

Q Demand = Present population x 1.36x 60 l/d Present population : 405


= 81.96 x present population Growth factor x 60 : 1.36 x 60
= 33193.8 liter Design period : 15 years
Population growth rate : 2.4 %
Minimum Continuous Demand = Present population x 1.36 x 60 Spring capacity : 0.70 l/d
86400
= 405 x 60 x 1.36 Number of house 60
86400 Number of house hole 60
= 0.38 l/d Lengt of transmission pipe 2250
Lengt of distributio pipe 96
It has been planed to construct 4 tapsstand
CDF minimum considered is 5 tapstandx 0.08 =0.4 l/d

Reservoir sizing :
V = 27.67 % x Q Demand
V = 33193.8 x 27.67%
= 9.18 M3
Reservoir size : 2.5x2.5x 1.45 = 9.06 m3
9 m3

Prepared by : Checked by :Rui Oliveira Approved by :Raynald Blouin


Date : Date : Date :