Professional Documents
Culture Documents
PVT. LTD.
Research by:
- Abinash Mohanty
- Vishal Kashyap
(Batch: Fashion Technology, Semester 6)
THE OBJECTIVES 01
THE
OBJECTIVES
The Apparel Internship
To gain substantial
knowledge and
psychophysical
enlightenment of the
practical aspects of the
working culture in a garment
industry.
THE
GIST
We did the Apparel Internship in Shahi Exports PVT. LTD.
In Noida for the period of 14 weeks under sincere
guidance and comfort.
Value Stream
Mapping Of
Value Stream Finishing
Mapping Of Department &
Cutting Layout
Department Improvement Of
Checking Tables
PROJECT 1 PROJECT 2
COMPANY 03
PROFILE
COMPANY
PROFILE
Name: Shahi Exports Private Limited
Established: 1974
Website
http://www.shahi.co.in
ABOUT THE
COMPANY
SHAHI Exports Pvt. Ltd. is engaged in the manufacture
and export of readymade garments in the International
market. It is No 1 .Export house of India having an annual
turnover of 450 million USD.
MAJOR BUYERS
ABOUT THE 07
COMPANY
COMPANY POLICIES
SHAHI EXPORTS
PVT. LTD. ,NOIDA C 35
YEAR OF ESTD. – July 2012
DISJUNCTURE
ORGANISATION CHART
FACTORY HEAD
DEPARTMENTS
DEPARTMENTS
STUDY &
OBSERVATION
PROCESS
FLOW
INFORMATIONS
HUMAN RESOURCE 14
DEPARTMENT
HUMAN RESOURCE
DEPARTMENT
Human resource department plays a vital role in the
working of any organization.
HR
Planning
Recruitment, Labor
selection & relations
introduction
Personnel
administration
HRM Succession
& Career
planning
Performance
& reward
management
FABRIC 16
STORE
FABRIC
STORE
The fabric store records data regarding the inward and
outward movement of the fabric in the specified quantity,
both to and from the departments.
In the store there are 42 racks within 5 rows .Fabric lot are
arranged according to style number, GRN number, and
shrinkage or shade variation according to the buyer.
PROCESS FLOW 17
OF FABIRC STORE
- Gate entry
FABRIC - Fabric chalaan to store manager
RECIEVING - Register entry
- Fabric unloading
- Width checking
RACK
- Length checking
SELECTION
- Segregate according to grn number , shrinkage , shades
- Fabric Inspection
INSPECTION - Centre to Selvedge Variation
- Shade Batching for the whole lot
- Stocking of inspection rolls to the alloted racks
SWATCH STATUS
BOARD BOARD
Records
Maintained in
the sotre
TRIM
STORE
This is the place where all the trims and accessories are
stored before and after their use.
REPORTS MAINTAINED
IN TRIM STORE
Material Delivery Schedule
Inspection Report
SAMPLING
DEPARTMENT
The Sampling Department works out to make the required
samples with the given specifications supplied by the
buyer.
All the buyers and all the styles do not require the same
types and same number of samples.
SAMPLING 23
PROCESS
SAMPLING PROCESS
Mr. Devender Singh: Sampling head
SAMPLING
ROOM
Cutting is done manually with patterns.
CAD
PRODUCTION PLANNING
&CONTROL DEPARTMENT
The planning department has the responsibility of
converting the orders booked by the merchant, to the
production team for the easy execution of the order.
Based on the TNA and the availability of the line the PPC
team allocates the order on the production floor as which
process has to be done at what time.
INDUSTRIAL ENGINEERING
DEPARTMENT
The Central IE department is responsible for the
preparation of the
Operation Breakdown
SMV analysis
ACTIVITIES
FOLLOWED
Study of sample or Tech Pack received from buyer and to
make observation sheet.
SPREADING &
CUTTING
Cutting production consist of all the process activities
involved in reducing the bulk material used in apparel in to
the component parts making up the apparel.
The lay is cut by straight knife on the same table and the
blocks are transferred to other table and then to band
knife for final cutting and then to numbering table.
THE WORKPLACE 31
THE
WORKPLACE
Spreading Tables = 6
Straight Knife = 8
Band Knife = 1
Workforce = 105 ( including 5 checkers)
Ticketing machines = 14
Table for bundling = 4
Table for audit = 2
Table for ticketing = 2
There is separate section for bundling and sorting.
PROCESS 32
INFORMATION
PROCESS
INFORMATION
Fabric issues by requisition form signed by cutting head.
PROCESS FLOW
SAMPLING
CAD
SEWING
BUNDLING
SPREADING
SORT
BLOCK CUT
CUTTING
TICKETING
SEWING
DEPARTMENT
Production Department is one of the most important
department of any apparel industry, where cut parts are
stitched together to make garments.
THE WORKING
INFORMATION
Capacity of the factory : 15000 Garments
Number of lines :18
Total number of floors :3
Total number of operators :950
No of machines per line: 44-50
No. of helping tables including pressing : 13
Software used for information storage : movex
THE WORKING 36
INFORMATION
PPC develops load plan for Feeders along with Cut plan to
be followed in lines.
THE WORKING 37
INFORMATION
Progressive Assembly
Loading bundle flow section
PRODUCTION PLANNING
&CONTROL DEPARTMENT