You are on page 1of 2

FAARFIELD

FAARFIELD v 1.42 - Airport Pavement Design

Section PCConRigid01 in Job latihan1.

Working directory is C:\Users\Ranatika TBL\Documents\FAARFIELD\

The structure is Unbonded PCC Overlay on Rigid.

SCI of the existing pavement = 80.

Design Life = 20 years.

A design for this section was completed on 12/02/21 at 10:25:48.

Pavement Structure Information by Layer, Top First

Thickness Modulus Poisson's Strength


No. Type
mm MPa Ratio R,MPa
1 PCC Overlay Unbond 363.1 27,579.03 0.15 4.48
2 PCC Surface 300.0 27,579.03 0.15 4.48
3 Variable St (rigid) 200.0 1,723.69 0.20 0.00
4 P-209 Cr Ag 200.0 207.67 0.35 0.00
5 Subgrade 0.0 62.20 0.40 0.00

Total thickness to the top of the subgrade = 1,063.1 mm

Airplane Information

Gross Wt. Annual % Annual


No. Name
tonnes Departures Growth
1 S-50 22.680 7,300 10.00
2 B737-400 68.266 2,920 0.00
3 B737-500 60.781 5,840 1.28
4 B737-800 79.243 21,170 5.50
5 B737-900 ER 85.366 16,060 7.39
6 A320-200 Twin opt 78.400 8,760 3.84
7 A318-100 opt 68.400 4,380 0.00
8 C-130 70.307 1,460 0.00

Additional Airplane Information

CDF CDF Max P/C


No. Name
Contribution for Airplane Ratio
1 S-50 0.00 0.00 2.73
2 B737-400 0.00 0.00 3.51
3 B737-500 0.00 0.00 3.80
4 B737-800 0.20 0.20 3.52
5 B737-900 ER 0.78 0.78 3.53
6 A320-200 Twin opt 0.02 0.03 3.67
7 A318-100 opt 0.00 0.00 3.64
8 C-130 0.00 0.00 4.67
User is responsible for checking frost protection requirements.