Presentation 03 How To Make ESPs Last Longer
Presentation 03 How To Make ESPs Last Longer
European AL Forum
25-02-04
Unocal Netherlands ESP experience
10.0
8.0
YEARS
6.0
4.0
ALL FIELDS
2.0 HELDER
HOORN
HAVEN, HrB
0.0 HORIZON
European AL Forum
25-02-04
ESP Runlife Improvers - Hardware
European AL Forum
25-02-04
European AL Forum
25-02-04
European AL Forum
25-02-04
European AL Forum
25-02-04
Thrust Forces in Pump
Recommended
Operating Range
Thrust at optimum
efficiency point
Down-thrust
Up-thrust
Thrust
European AL Forum
25-02-04
European AL Forum
25-02-04
Failure Analysis
European AL Forum
25-02-04
Teardown and Failure Analysis –
Before Workover & Ordering new ESP
Offshore
• HV megger test power cable + motor
• Megger/ check surface systems (cables, VSD, transf.)
• Echoplot (el.) to check location of short circuit
• If doubt, connect ESP to power supply of other well
In Office
• Review/ assessment of:
¾ Amp-charts
¾ Well tests/ inlet pressure etc.
¾ ESP performance by simulation
European AL Forum
25-02-04
Teardown and Failure Analysis –
During Workover
European AL Forum
25-02-04
European AL Forum
25-02-04
Explosive decompression
of power cable
European AL Forum
25-02-04
European AL Forum
25-02-04
European AL Forum
25-02-04
Teardown and Failure Analysis –
After Workover
European AL Forum
25-02-04
C.S. bolts between tandem
motors corroded after 5 yrs
European AL Forum
25-02-04
Helder A-03 ESP failure
after 2 yrs 3 mo
due poor cable protectors
June 2003
European AL Forum
25-02-04
Helder A-9 ESP failures
After 7 yrs After 3 mo
European AL Forum
25-02-04
A9 SS centralizers
European AL Forum
25-02-04
Broken shaft caused by: …
European AL Forum
25-02-04
Scale inside pump
bearings due
operation below B.P.
Solution:
Acid injection line with
entry above pump and
below check valve
European AL Forum
25-02-04
European AL Forum
25-02-04
Tandem motor connections
failed due design error
European AL Forum
25-02-04
Failure Analysis – Lessons Learned
Problems and Solutions
Corroded/ eroded tubing by • All tubing changed to 9 Cr 1 Mo tbg w/
gas/ CO2 VAM couplings
Corroded pup joints • Checked all pups to be ss and scrapped cs
Cable plug failures • Splice below packer + conn. Above (init.)
• Splices below packer + 300’ lead above
• Eliminate SSSV’s
Reservoir mgt. + ESP • Pressure gauge w/signal on power cable
performance analysis • Now Baker CAC gauge w/ external wire/tbg
Water in seals/ bags failing • Tandem seals w/ 2 bags
• Deviated wells w/ 4 bags
Limited clearance 675 series in • 90 Ft flat lead also for installation in 7” liner
9 5/8” csg for round cable (up to above pump)
Operator error • ESP course
Pulled ESP’s that had not • HV megger/ echoplot (el.)/ checking of
failed VSD etc./ connect system of other ESP
European AL Forum
25-02-04
Failure Analysis – Lessons Learned
General
• Proper ESP design/ installation/ operation/ failure analysis is
a team effort (Prodn. & Res. Eng./ WO Sup’r/ Vendor)
• ESP sizing software is essential
• Working with vendor pays off, but do not blindly rely on them
for pump selection
• Consider with design of pump that it may last 4 - 6 yrs
• Try to keep operating within recommended operating range
of pump curve
• Teardowns - although expensive - pay off
• Sharing through EESPOG etc. is valuable
• Experienced Workover Supervisor / crew are crucial
European AL Forum
25-02-04
ESP Economics
European AL Forum
25-02-04
T-39 workover rig
European AL Forum
25-02-04 Horizon/Seafox
European AL Forum
25-02-04
ESP Economics