You are on page 1of 8

RMA PLANNING

Return Material Authorization


Case Study

Truc Nguyen
INTRODUCTION
• What is RMA?
• What’ll happen when RMA happened?
• The role of planning

Truc Nguyen
CONTAINMENT ACTION

CORRECTIVE ACTION

PREVENTATIVE ACTION

Truc Nguyen
PLANNING
QE analyze the defect

Receive information
Management sign
RMA agreement
Calculate capacity &
Scenario 1: Based on the input data:
resource requirement
REWORK
• Volume returned Logistics conduct return
• Cycle time of shipment
Scenario 2: Materials replacement unpacking/rework/asse
mbly
SCRAP & DEBIT requirement
• Headcount needs
Production prepare
Scenario 3: • The component to
replace
work-floor & headcount
RUN NEW
Cost analysis • Logistics cost
BATCHES
RMA rework & ship back
to customer

Truc Nguyen
BEFORE AFTER

UNPACKING LINE
ASSEMBLY LINE

ASSEMBLY LINE
WORKFLOOR AND RESOURCE
PREPARATIOJN

Materials to replace REWORK


RESULTS
• RMA was completed with scenario REWORK on
schedule committed to customer.
• The cost was shared.
• Maintain good customer service.

Truc Nguyen
CHALLENGES
• Working under high pressure from
customer/market
• Shortening materials leadtime with
suppliers (component replacement)
• Coordinating between a big team,
including: customer, management,
engineering, production, logistics,…

Truc Nguyen
LESSONS LEARNED
• Think about the scenarios can happen
to have a good preparation.
• Should have backup plan to keep things
done on progress.
• Always ready for worst case.

Truc Nguyen