QRQC Manual
Quick Response Quality Control
2007.8.30
Index
7p. Proceeding for QRQC Carry-Back meeting 19p. QRQC 1-point lesson (Sample)
8p. Outline of Engineering in PDCA cycle 20p. QRQC 1-point lesson (standard)
9p. QRQC and Carry-Back meeting 21p. Case: Solution of facility/equipment defects
10p. Issuance standard for QRQC know-how sheet 22p. Viewpoint of defect analysis
11p. Quality info. flow (1) 23p. QRQC operating check sheet
12p. PDCA cycle to solve defects 25p. 10 QRQC prohibited matters
13p. Good information & bad information
14p. Quality info. flow (2)
Basic of Built-in quality
1. Operator’s self-assurance
*Comply with standard operation.
*Stop the line when defects are found.
2. In-line checkman’s quality confirmation.
*100% check of assurance items.
3. Final assurance at final area.
*Completion of repair at the first attempt.
*100% inspection by QA.
Purpose of QRQC administration
○confirmation ・ investigation ・
○Manager must
analysis temporary countermeasure
report
○Report to manager
○Request carry-
back sheet
Proceeding for QRQC meeting
Take a countermeasure
○confirmation ・ investigation ・
○Manager must
analysis temporary countermeasure
within a day of defects report
○Report to manager
occurring
○Request carry-
back sheet
QRQC and QRQE Basic Concepts
Q R Q Modify material,
Build in quality C machine, or
method
Recurrence
Quality info input preventions, F/B for
system next models
Arrangement of analysis
PDCA (QRQE)
One-point Lesson
Know-how sheet
Change in operation
and design change
- Complete tasks in
a shift QRQC mtg (Kaizen plan)
Sheet
Arrangement of analysis
PDCA (QRQE)
One-point Lesson
Know-how sheet
Change in operation
and design change
- Complete tasks in
a shift QRQC mtg (Kaizen plan)
Root cause
Sheet
*Decide the time the meeting is held according to availability of each plant.
6:30 9:00~9:30 12:00~12:30 15:00
Carry-back meeting
GRQC meeting
Lunch time
Early shift
Carry-back meeting
Dinner time
Late shift
Establish standard to issue for each line, according to its quality level.
Establish standard to issue for each line, according to its quality level.
1. Confirm defects.
5. Confirm the result of c
ountermeasure.
C
2. Take necessary action / measure.
CAPD
D cycle
A 6. Take necessary action / measure.
4. Execute countermeasur
e.
3. Make KAIZEN plan.
P
2.What is “taking necessary action/measure”? 6. What is “taking necessary action/measure?
* Countermeasure against defect *Confirm the result of the countermeasure.
1.Prevention of outflow. 1. If the countermeasure is NG.
*Find the first unit. *Redo “grasp of current condition” and “p
*Take a sample of vehicle between the last OK ve ursuit of the true cause.
hicle and defect vehicle to establish the extent of
defect. 2. If the countermeasure is OK.
*Improve the assurance system to prevent outflo *Report content or the countermeasure to the o
w of defect. perator who is responsible for the job.
2. Grasp the current condition, pursue the true ca *Is revision of SOS necessary?
use *Is job instruction necessary?
*With 4M (man, material, machine and method)
Good information and bad information
Defect example
Example)Room light does not come on.
Good information
*Put out the information of the cause based on repair contents.
1.Model : B11 2. CCR-No. 12345
3. Contents of defects : RH Fr Door switch harness not
connected.
*Being able to tell the responsible process and operator
immediately, and supervisor being able to take
countermeasure immediately.
Bad information
*Simply put out the information of the defect.
1. Model: B11 2. CCR- No:12345
3. Contents of defect : Room light does not come on
*The responsible process is not identified.
Quality info flow (2)
Operator
Own
Area/Process Supervisor in the zone that
causes a defect
downstream
Senior Next Process
Supervisor
FINAL/QA
Quality info. flow (3)
Collected information and report
Information
gathered weekly
1-2) Items occurring more than 2 cases
Model Part Name Case Parts caused Cased caused Responsible Sec CCR
3. Occurrences by causes
Considerations
Others
2cases, 17% •It is improving 0.04 case for this week
compared to 0.54case/100v of last week
Defective parts Picking mistake • There is no item that have more than 2 cases
2cases, 17% 6cases, 49%
•For by Area/Process, 3 cases occurred in T46
79 MH and T32P
Defective coupling •For occurrences by causes, 6 cases for picking
2cases, 17%
mistakes and takes 49% of overall
Specific actions for Carry-Back items (1)
If you can estimate a possible area responsible for the defect…
Supervisor in the zone that Senior supervisor in the zone that Supervisor in the Final area Department Manager
Senior supervisor in the Final area
causes a defect causes a defect
defect
Check the defect.
Estimate which area is
responsible.
With supervisor and the operator, investigate the cause and create a
countermeasure, according to the 3-gen principle
Revise SOS
Train operations
defect
Define a reporting line to the
responsible/associate areas
Check the concern.
Confirmation Date
( Off-line repair, VES value ) Measure
Grasp Current Situation Permanent measure
Operator permanent workers: engage in the operation from 4/2 Inform to practice cleaning 10 min. b/f line operation time at the meeting Judgment
3 month-experience proficiency level 100%
Objects HAMATAITO WS-303 No Changes make the gap disappear by pressing the overlapped part effective from night shift CCR #6476 on 6/16
Application device for Rr glass sealing Implement permanent
Device Judge measure
(no changes on the day of problem occurrence) Add how to press the glass in SOS
Method Automatic application of sealing
record of start-up check Request to eng. section. to add details as to how to clean in an operation instruction sheet
Cleaning:practice as stated in start-up check sheet(removal of coagulation, foreign objects, dirt) F/B to the
Cleaning:No details in operation instruction sheet or SOS Standardize the method of cleaning and create SOS, conduct the instruction
By 6/18 Decrease in next model
matrix points
Carry-back date Model CCR Dept. Request to maintenance section to review teaching of application device (overlapped part) necessary
not necessary
Sample example
Pursuit of cause Supervisor
Section Mgr
Issue Analysis/measure dept.
Dept.Manager Section Mgr person in charge Issue
Defect description
Seeking brokerage is found
conducted
scraping method
- operators did
dispose a little bit of sealing Scrape a hole of the nozzle with screwdriver
Start the
the line wrong procedure clean the nozzle(or miss one too early difference among workers
or less Finish analysis
by B shift with start-up check
(Senior supervisor in Final area)
with drill
Estimated Cause
…seek the true cause
Standard: start-up check is conducted 10min. b/f operation
Confirm how sealing comes out by deposing a little
After nozzle cleaning, it is ok.
(1) CCR NO Clog in the nozzle due to Problem: Problem:
CCR 6033-ok Incomplete Sealing -Investigate
concretion of sealing what may have
cleaning too early led to coagulation of sealing made method to the
scrape operator
with drill or screwdriver isfail
not clearto do the
(2) defect phenomenon steps. Temp. measure
Operator permanent workers: engage in the operation from 4/2 Inform to practice cleaning 10 min. b/f line operation time at the meeting Judgment
①situation based onproficiency
3 month-experience SOS. level 100% ②Do not just blame the operator .
Objects HAMATAITO WS-303 No Changes
Device
Application device for Rr glass sealing
② Grasp man, machine, material ③makeIt theshould be physical measures
gap disappear by pressing the overlapped part
rather than ones that Judge
effective from night shift CCR #6476 on 6/16
appeal Implement permanent
Subject
Water leak from B/door glass
②Conduct job observation
Promotion andDept.
Analysis/Measure confirm the result.
Control #
QRQC One-point lesson standard
< Purpose >
① Against occurred defect:
* Area mgr and operator execute a countermeasure
for pursuit of cause and prevention of recurrence against defects.
* The countermeasure should be conducted within shift.
② Raise awareness of technician for quality.
* Defects that require time
< Issue standard > for manual repair
① Off-line repair
* Worst 3 items in the zone
② Defect found in the PDI line
③ Defects found by check man * Defect that has the biggest effect on
First time OK ratio
< Conduct operation instruction to the operator. >
-Was there conversation with the operator?
①Is there any difficult standard operation?
②Is there a need for engineering countermeasure.?
③Is there a need to feedback to upstream?
-For <an item that
Sample needs> KAIZEN, conduct KAIZEN within a shift, and practice.
attached
QRQC One-point lesson (Sample)
Section mgr Area mgr Techinician
QRQC One-point lesson
ICHI SHI Ko
Zone C-1 (Shift A)
Defects A/C compressor bolt not tightened Report Yes / No Operator New Tech. /Existing / Contract
Date Sep. 28, Wed CCR・ No 7983 Model: 1
Z1 Place In-line・ Middle ・ Off-line
Reason why standard was
4M Fact Standard (rule) Result Follow the procedure not followed Cause
Method
- Operations delayed - Tighten 3 bolts × - Not observed - Operator thought he - Not followed
- Operator tried to - Loose tighten the fully tightened. steps to tighten.
make the call first bolt. - Delayed to call
- Missed steps - Tighten the second
because he was in and third ones.
hurry - Final tighten the first
one
Temporary measure
- 100% check on hangers *Bolt loosening, hanger closing size9
Result’ One loosening, but closing size is right.
Additional lock nut (Temp): 10 units for nut stock
Prevent loosening with clip plate, disk lock washer, etc.
Information distributed to zones and areas
- 100% check on hangers to carry bodies and its structure is similar to
the above
Inspection history
- Summer shutdown in 2003 – Size check for model modification
- Regular check on T24 hangers from 2004 March (No more bolt loosening like the above)
Example: Facility Break-down
Solution
①Contents of direct damage - 100% check on hangers to carry bodies and its structure is similar to
the above
inspection
Check item
Ideas for supervisors and senior supervisors to
Viewpoints for quality concern (T&C) investigate concerns with viewpoints: man,
material, machine, and method
Supervisor’s Concern:
Check item
.
viewpoint to
Check with actual objects immediately.
Did you understand the concern? Understanding of what and how bad it is.
Confirm Did you find out who caused the concern from CCR No? Examine if steps and key points are OK.
(Reference:T&C version) Is the operator in job rotation? Examine steps and key points in job
observation
Technician Does the operator have experiences of the zone and Teach operations according to SOS
is he/she at Level L?
Does the SOS include key points and instruction in detail? Improve immediately
Confirm
Did you check the concern with actual unit? Check with actual objects immediately.
viewpoint to
Did you understand the concern? Understanding of what and how bad it is.
Confirm
Defects
Defects
Did you find out who caused the concern from CCR No? Examine if steps and key points are OK.
Take preventive measures at first if that
analyze defects
Has the concern ever happed before? concern repeatedly occur
Technician
is he/she at Level L?
Teach operations according to SOS
Confirm
Is there any old parts abandoned? Manage old parts
Material
Guide for 4M inspection
Is there any problem in parts? Make Kaizen and sort out
Material
Is there any wrong parts mixed ? Classify parts
Guideline for supervisors Are the operators using air tools as instructed? Use protectors instructed immediately
so that they will know what Is there any protection on tools? Repair immediately
Confirm
Facility
Jig Is the bar code reader utilized properly?
kind of viewpoints they & tool
Teach operations immediately
Does the SOS include key points and instruction in detail? Improve immediately
Operation
Method
QRQC self-diagnosis check sheet
QRQC check sheet
NO Item Key point Reason Evaluation
1 QRQC meeting - Held every day - Share daily changes in production
QRQC meeting attendees - All Directors, all Dpt.managers, representative staff & sec
2 tion mgr (Maintenance, Mfg, QA must attend) -Plant/line management can make decision
- Report on production status and quality of previous day -Share information of the current status at genba.
3 QRQC meeting agenda - Solve production/quality concerns
-Discuss with managers if solution are appropriate
- Manager make reports on problems in production -Explain appropriateness of solutions and validity of
4 Reports in QRQC meeting and quality preventions to subordinates Mgr reporting. Enhance
communication with the shop floor.
- Senior supervisor in Final area - Have a full understanding of quality in the final area
5 Facilitator in QRQC meeting (Must understand), provide info to other areas and
facilitate meetings
-Hold the meeting every shift - Share info of changes in shifts.
6 Carry-back meeting
-Hold the meeting as the half time of the shift passes- Share info of situation and solve problems within the shift.
- Define the standard according to situations - Since it is very difficult to solve issues all at once,
7 Standard for issuing QRQC prioritize issues and take reliable countermeasures to
know-how sheet of the plant and line situation
every concern.
- Basically info includes: -The information receiver immediately takes actions
(feedback to technician or take countermeasures).
(1) Date, (2) Name of Repair man, (3) - Make it easy to obtain detailed info by notifying names of
Defect info: description of defect and Repair men.
Quality info flow
8 cause (Visual of actual unit), (4) Model, - Clarify causes to help to take countermeasures.
and (5) CCR-No
- Clarify whose operation it is from CCR-No and contribute
to deep analysis
- Issue a quick report on defect when res - Latest info helps to investigate causes.
9 Quality info flow ponsibie party is not clear - Solve problems within the shift.
- Unify management of defect info in the QRQC info center
Quality info flow (Classify defect into responsible areas and zone) - Unify management of info on quality defect in the QRQC
10 (Track down the progress of countermeasures) meeting so that everyone can obtain accurate info.
- Finish solving problems within the process by feedback
11 Quality info flow - Process QA
from Check man
- Supervisor and operator take countermeasure and
12 - Senior supervisor responsible for the defect make deeper analysis of causes and practical measures
Specific actions for Carry-back items by issuing know-how sheets
fill in the QRQC know-how sheet
-Establish action standard according to line/plant - Priorities concerns an solve defects.
capacity
13 Standard for One-point lesson -Except for the know-how sheet items - Take outflow preventions and recurrence preventions
-Don’t put a responsibility of defect on operator without - SOS? Training? Tools?
careful consideration
QRQC self-diagnosis check sheet
QRQC check sheet
NO Item Key point Reason Evaluation
1 QRQC meeting
QRQC check item
QRQC meeting attendees
- Held every day - Share daily changes in production
- All Directors, all Dpt.managers, representative staff & sec
2 tion mgr (Maintenance, Mfg, QA must attend) -Plant/line management can make decision
- Report on production status and quality of previous day -Share information of the current status at genba.
1.QRQC
3
Does it require QRQC meeting?
meeting agenda - Solve production/quality concerns
-Discuss with managers if solution are appropriate
- Manager make reports on problems in production -Explain appropriateness of solutions and validity of
2.Reports
4 Whoin QRQC shouldmeeting
attend and QRQCquality meeting? preventions to subordinates Mgr reporting. Enhance
communication with the shop floor.
3.
5 Whatin QRQC
Facilitator is the
meetingQRQC meeting agenda?
- Senior supervisor in Final area - Have a full understanding of quality in the final area
(Must understand), provide info to other areas and
facilitate meetings
4.
6
Who will report in-Hold
Carry-back meeting
QRQC the meeting meeting?
every shift - Share info of changes in shifts.
-Hold the meeting as the half time of the shift passes- Share info of situation and solve problems within the shift.
5.Standard
Whofor issuing
is Facilitator
QRQC
in QRQC
- Define meeting?
the standard according to situations - Since it is very difficult to solve issues all at once,
7 of the plant and line situation prioritize issues and take reliable countermeasures to
6. Does it require Carry-back
know-how sheet
- Basically info includes: meeting? every concern.
-The information receiver immediately takes actions
Previous month 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
1. Don’t excuse not attending meeting because you are busy (Quality
is the first priority: Send someone else)
2. Don’t make analysis to escape the responsibility of defects (First,
consider it is your fault.)
3. Don’t conclude only from info you received (Check actual units
according the 3-gen principle).
4. Don’t give up and leave defects unsolved as you are not able to
solve on your own. (Bring it up to QRQC meeting)
5. Superior positions track results, not just giving instructions.
6. Don’t consider it done after only requests (Everyone is busy, keep
following up).
7. Keep attention on even after good countermeasures are taken
(Check results with actual units).
8. Focus on data, not on experiences in the past.
9. Senior supervisors and supervisors should not put responsibilities
on technicians without careful considerations (Consider senior
supervisors and supervisors are responsible for all concerns).
10. Managers should not depend on senior supervisors and
supervisors on countermeasures (Learn cases together).
1 Point Lesson Sheet Making Issue
1. Defect Content
- Side drop of the rear Side Drop of Tyre
left tyre
2. Defect Cause
- Hand tightening for
every 5 bolt to install
tyres
3. Issue
- Identify factors of defect
causes & select the most
possible factors yourself
to summarize on 1 point
lesson sheet
QRQC 1 Point Lesson (Sample Answer)
SSV SV Operator
QRQC 1 Point Lesson
ICHI SHI Ko
Cause Process Tyre Installation Plant (team A)
Title Tyre Tightening Defect Apply Yes / No Operator New / Ordinary / Free
Cause Date CCR ・ No 7983 Model Z 11 Location QA Tester
4M Fact Relation Standard (rule) Judge Do you follow the rule? Why you do not follow the rule? Factor
Operation Method
-Man : New Comer - Stop the line - Equipment - Although the - Insufficient
and report × trouble is the first explanation about understanding
-Material : No
defect to time for the operation was for defect
Change
superior to have operator, thus the enough, the importance
-Machine : Breakage instruction operator got into a operator did not
- Insufficient
of Tightening panic understand enough
understanding
Equipment
for treatment of
- Method : Report defect
Breakage to Superior occurrence
- Sheet : Write Defect
Treatment
Countermeasures (tangible actions with 4 M) SV Comment
1. Man : Teaching the importance of operation responsible
Implement treatment training that expects machine breakage
SSV Comment
Method : Firm vehicle confirmation for defect occurrence - Prevent outflow
The contents above are informed to members thoroughly