SECTION I- SCOPE OF WORK

1. COMMUNICATION WORKS

1.01 CONSTRUCTION OF 110KV DOUBLE CIRCUIT OHTL & POWER CABLES FOR
DESCRIPTION

MADINAH SOLAR-PV (MDN-PV) 110/13.8KV SUBSTATION IN MADINAH.

A) OHTL BETWEEN MDN-PV GANRTY AND CUT POINT:

Provide and install Two (2) No of OPGW each having approximately 3.1 kilometers
route length between the gantry structure of MDN-PV and the proposed cut-point of the
existing line between ICITY and MEDSO as per the attached conceptual drawing
NO.

REVISIONS
(MDNPV-ICITY-MEDSO.110KV-TL-01). The new OPGW shall be 2x96 cores, single
mode G.652D type.
EMS
DRAWN BY
Refer to drawing no. WT-922403 for OH transmission line route.
DATE 01/05/2019

JF Supply and install single mode, overhead all dielectric Self-supporting non-metallic fiber
optic cable (ADSS NMFOC) (if applicable at all locations where the installation of OPGW
is not possible due to the low clearance of the existing overhead transmission lines or for
APPROVED
any other valid reason/requirements). The elevation of SS NMFOC shall not be lower
TESAD-WOA
than the elevation of the conductor.

CONTRACTOR shall maintain the continuity of overhead ground wire by installation of


counterpoise system between the steel structures/latticed steel gantry structures where
the OPGW/OGW cannot be continued due to the low clearance of the existing overhead
transmission lines or for any other valid reason/requirements. The counterpoise system
shall be designed to resist a fault current of 24kA for 0.3 second at 55 °C initial
temperature. The counterpoise system shall be in accordance with
TES-P-122.10 & 10-TMSS-6.

Provide and install four-way OPGW - SS NMFOC fiber optic cable joint boxes at the
steel structures or latticed steel gantry structures (OPGW-SS NMFOC transition).
CERTIFIED

BY: MRR B) RETROFTTING THE EXISTING OPTICAL GROUND WIRE BETWEEN ICITY,
DATE: 16-May-19
CUT POINT AND MEDSO:

1. Retroftting the existing 12 cores OPGW with new One (1) OPGW for the route
length between the gantry structure of ICITY until the proposed cut-point, as per the
attached conceptual drawing (MDNPV-ICITY-MEDSO.110KV-TL-01). This new
proposed OPGW shall be 96 cores, single mode G.652D type. The new OPGW shall
be of same mechanical charactersitics and weight to fit at the existing overhead
THIS DRAWING IS NOT transmission lines. (Length is approximately 2km).
TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL 2. Retroftting the existing 36 cores OPGW with new One (1) OPGW for the route
CERTIFIED AND DATED
MATERIALS UNTIL
length between the gantry structure of MEDSO until the proposed cut-point as per
CERTIFIED AND DATED the attached conceptual drawing (MDNPV-ICITY-MEDSO.110KV-TL-01). This new

PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.


ATTACHMENT III
JOB ORDER NO. Fiber Optic Cable And Link Requirements For 3
Communication System for new MADINAH PV 110/13.8KV NG0977 A PTS-19WO127 OF 0
SUBSTATION IN MADINAH 19
National Grid SA

proposed OPGW shall be 96 cores, single mode G.652D type. OPGW. The new
OPGW shall be of same mechanical charactersitics and weight to fit at the existing
overhead transmission lines. (Length is approximately 14km).

C) U/G-NMFOC FROM GANRTIES TO SUBSTATIONS


DESCRIPTION

1. FOR NEW MADINAH-PV:

i. Provide and install Two (2) No of U/G-NMFOC, 2x96 core single mode cable type
G.652D, each having approximately 1.2 kilometers route length from the fiber optic
cable joint box at steel take-off structure at Ganrty near MDN-PV up to the Optical
Fiber Management Rack inside communication of MDN-PV The U/G-NMFOC shall be
NO.

routed through the communication ductbank. CONTRACTOR shall provide and install
REVISIONS ductbank, PVC subducts for routing U/G-NMFOC.

DRAWN BY EMS Design and construction of communication ductbank and handholes for routing the
DATE 01/05/2019 U/G-NMFOC inside the switchyard up to the communication room at switchgear and
control building including the installation of PVC coated RSGC at the take-off structure
JF
and PVC coated RSGC and cable trays at the communication room shall be done by
the contractor.
APPROVED

TESAD-WOA ii. Provide and install four-way OPGW - U/G-NMFOC joint boxes at the proposed steel
take-off structures for MDN-PV (2Nos).

Refer to drawing number TA-800078 for typical conduit mounting details at latticed
steel take-off structure.

iii. Provide and install One (1) Optical Fiber Management Rack and Two (2) 1x96
Fiber Splicing/Termination Panel(s) in the Communication room of MDN-PV.

2. FOR ICITY:

i. Provide and install One (1) No of U/G-NMFOC, 1x96 core single mode cable type
G.652D, having approximately 0.2 kilometers route length from the fiber optic cable
CERTIFIED
joint box at steel take-off structure at Ganrty near ICITY up to the Optical Fiber
BY: MRR
Management Rack inside communication of ICITY The U/G-NMFOC shall be routed
DATE: 16-May-19
through the communication ductbank. CONTRACTOR shall provide and install
ductbank, PVC subducts for routing U/G-NMFOC.

Design and construction of communication ductbank and handholes for routing the
U/G-NMFOC inside the switchyard up to the communication room at switchgear and
control building including the installation of PVC coated RSGC at the take-off structure
and PVC coated RSGC and cable trays at the communication room shall be done by
THIS DRAWING IS NOT
TO BE USED FOR
the contractor.
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL ii. Provide and install four-way OPGW - U/G-NMFOC joint boxes at the existing steel
CERTIFIED AND DATED
MATERIALS UNTIL take-off structures for ICITY (1Nos).
CERTIFIED AND DATED

PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.


ATTACHMENT III
JOB ORDER NO. Fiber Optic Cable And Link Requirements For 4
Communication System for new MADINAH PV 110/13.8KV NG0977 A PTS-19WO127 OF 0
SUBSTATION IN MADINAH 19
National Grid SA

Refer to drawing number TA-800078 for typical conduit mounting details at latticed steel
take-off structure.
iii. Provide and install One (1) Optical Fiber Management Rack and Two (2) 1x48
Fiber Splicing/Termination Panel(s) in the Communication room of ICITY.
DESCRIPTION

3. FOR MEDSO:

i. Provide and install One (1) No of U/G-NMFOC, 1x96 core single mode cable type
G.652D, having approximately 0.2 kilometers route length from the fiber optic cable
joint box at steel take-off structure at Ganrty near MEDSO up to the Optical Fiber
Management Rack inside communication of MEDSO The U/G-NMFOC shall be routed
through the communication ductbank. CONTRACTOR shall provide and install
NO.

ductbank, PVC subducts for routing U/G-NMFOC.


3

REVISIONS
Design and construction of communication ductbank and handholes for routing the
DRAWN BY EMS
U/G-NMFOC inside the switchyard up to the communication room at switchgear and
DATE 01/05/2019
control building including the installation of PVC coated RSGC at the take-off structure
and PVC coated RSGC and cable trays at the communication room shall be done by
JF the contractor.

APPROVED
ii. Provide and install four-way OPGW - U/G-NMFOC joint boxes at the Proposed steel
TESAD-WOA
take-off structures for MEDSO (1Nos).

Refer to drawing number TA-800078 for typical conduit mounting details at latticed
steel take-off structure.

iii. Provide and install One (1) Optical Fiber Management Rack and Two (2) 1x48 Fiber
Splicing/Termination Panel(s) in the Communication room of MEDSO.

D) SPLICING/TERMINATION AND COMPLETING THE LINKS

For all links mentioned above, the CONTRACTOR shall perform splicing/termination of
all fibers cores at the affected take-off structures and at all required locations joint boxes
to form complete Fiber Optic links, As per attached drawing, as follows:
CERTIFIED

BY: MRR MDN PV ICITY: 1x48


DATE: 16-May-19 MDN PV MEDSO: 1x48
ICITY MEDSO: 1x48

See the attached drawing (MDNPV-ICITY-MEDSO.110KV-TL-01). The extra cores shall


be kept at the joint boxes as spare for future use.

THIS DRAWING IS NOT


TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND DATED
MATERIALS UNTIL
CERTIFIED AND DATED

PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.


ATTACHMENT III
JOB ORDER NO. Fiber Optic Cable And Link Requirements For 5
Communication System for new MADINAH PV 110/13.8KV NG0977 A PTS-19WO127 OF 0
SUBSTATION IN MADINAH 19