Preventive Maintenance of Purified Water (Generation and Distribution)


System
Posted By: Pharmaceutical Guidanace on: April 11, 2016 In: Engineering, SOP 1 Comment

Objective:To lay down a procedure for Preventive Maintenance of Puri ed Water System (Generation and Distribution).

Scope:This Standard Operating Procedure is applicable for formulation plant of pharmaceutical company.

Responsibility

The Concerned Technician shall follow the procedure for Preventive Maintenance as per this SOP.

The O cer/Executive-Engineering shall be responsible for implementation of this procedure as per this SOP.

Accountability:Head-Engineering and QA shall be accountable for the compliance of this SOP.

Abbreviations and De nitions:

UV- Ultra Violet

FRC -Filter Regulator and Connector

RO – Reverse Osmosis

LPH – Liter Per Hour

TC – Tri Coupling

Procedure:

Monthly Schedule

Switch “OFF” the main power supply through MCC and hang the Preventive Maintenance Display Board on the electrical control panel.

Check all pressure switches for proper functioning.

Check and note the reading of hour meters of all UV lamps and change the UV lamp between 7200 hours to 7500 hours.

Clean all S. S. visible part of puri ed water system by coline and cloth properly.

Checked, all pressure gauges for proper functioning, if not working, replace with same range calibrated gauge.

Clean all panels by vacuum cleaner and duster.

Check all TC joints for leakages, if leakage found change its silicon gasket.

Checked dosing pump, cleaned its suction & discharge pipe with air & water pressure.

Check all indicators change if fused.

Check all electrical connections, MCB, push button & switches for proper functioning. Rectify if required

Check three way valves for smooth functioning, lubricate if required.

Check all diaphragm valves for proper functioning change, if faulty.

Clean the Pre lter and air vent lter if required. Change the Pre lter if pressure gauge (PI001) shows measure pressure drop upto 2 bar.

Check all pumps for any leakages and smooth operation, rectify if found any abnormality.

Check the all motors for the loose connection and smooth operation and apply grease on the bearing and change the bearing if

necessary.

Record all the observations in Preventive Maintenance Checklist (Annexure -I).

Yearly Schedule

Check all pneumatic valve for proper functioning change if found faulty.

Change the Pre lter and Vent lter with a new lter after every 2 years.

Change MCF lter after every two years or as and when required.

Record all the observations in Preventive Maintenance Checklist (Annexure-1).
Forms and Annexure:

Preventive Maintenance Logbook –  Annexure -I

Distribution

Master Copy –  Documentation Cell

Controlled Copies : Engineering, Quality Assurance, Production,Warehouse, Quality Control, Administration and House keeping

8.0       History           

Revision
Date Reason for Revision
Number

– 00 New SOP