Professional Documents
Culture Documents
MODELING
PORTFOLIO
SHARM EL SHEIKH
INTERNATIONAL AIRPORT
Programs
Used :
The project was 1. Autodesk 4. Autodesk 7. Autodesk
50,000 KM SQ.
Revit Fusion MeshMixer
The Calculated 360
Capactiy for 2. 3DS Max 5. Google’s 8. Vray 3.6
the 2017 Sketch up for 3dsmax
expected
scheduled
planes is 20 3. Dynamo 6. Cinema 4D 9. Adobe
planes. 2.0 Photoshop
1
TERMINAL
MEGA STRUCTURE
DONE BY DYNAMO 2.0 FOR REVIT
A GRAPHICAL COMPUTATIONAL MODELING TOOL
The roof alone was modeled in 3 days , with the help of Fusion 360
and Dynamo for Revit
It was a challenge due to the time given, to completely design a mega structur-
al roof that is design wise, structural wise and architecturally appealing to the
human eye.
Every Architectural element was modeled in Revit 2018 and Fusion 360
and then textured and rendered in 3DS MAX 2017 with 4K Materials
then rendered with VRAY 3.6 for 3DS MAX
2
SHARM El-SHIKH
INTERNATIONAL AIRPORT
ACADE MIC
4 PAGE ARCHITECTURE
PORTFOLIO
AIRPORT TERMINAL
GROUND FLOOR
MASTER PLAN OF THE AIRPORT TERMINAL
WITH BAGGAGE CLAIM AREA, MAINTENANCE,
BAGGAGE HANDLING SYSTEM & SHADED PARKING
AREA
ACADEMIC
ARCHITECTURE
PORTFOLIO
PAGE 5
AIRPORT TERMINAL
FIRST FLOOR
MASTER PLAN OF THE AIRPORT TERMINAL
ARRIVAL FLOOR WITH PATHS & ESCALATORS TO THE
EXIT IN THE GROUND FLOOR
ACADE MIC
6 PAGE ARCHITECTURE
PORTFOLIO
AIRPORT TERMINAL
SECOND FLOOR
MASTER PLAN OF THE AIRPORT TERMINAL
DEPARTURE FLOOR WITH SELF CHECH-IN TERMINALS
AND REGULAR CHECK-IN WITH THE QUEUE TO
HARMONIZE THE FLOW OF PASSENGERS & WAITING
AREAS & DUTY FREE AREAS
ACADEMIC
ARCHITECTURE
PORTFOLIO
PAGE 7
3D ORTHOGRAPHICAL PLAN
3D PLAN TO SHOW THE PLACEMENT OF THE ROOF 3D RENDERS OF THE TOWER
OVER THE MAIN CORE OF THE TERMINAL
ACADE MIC
8 PAGE ARCHITECTURE
PORTFOLIO
The Primary elements to put into
Consideration dealing with a Air-
port Terminal building :
• Programmatic parameters
• LOS performance standards
• Demand/Capacity assessment
• Terminal facility requirements
• Ticketing/Check-in
• Passanger screening
• Holdrooms
• Concessions
• Baggage Claim
• Circulation
• Airline Offices and operations
• areas.
• Baggage Handeling
• Baggage Screening Services
• International facilities - Fedral
Inspection Services
• Support area
• special requirments
• Buikling systems
• Functional relationships
PEAK HOUR CALCULATION : Based on the latest 2 slides. To calculate peak hour for
Sharm el sheikh airport expecting 12,000,000 annual passengers , the following ap-
plies : 10,000,000 to 19,999,999 21then the typical peak hour percentage of annual
flows = 0.045% Then 12,000,000 x 0.045% = 5400 passenger/peak hour
Then to calculate the number of gates required to tolerate the peak hour passen-
gers = 5400 ÷ 280* = 20 Gates *Based on the number of seats of the widebody &
Jumbo average planes by the EQA standards And to be sure : number of seats x
number of gates = Peak Hour Passengers 280 x 20 = 5,600
GRADUATION PROJECT
SHOP DRAWING’S AND BLUEPRINTS OF :
MOTEL ROOMS
WEDDING HALL
SECTION 1 PROJECT
SECTIONS
SECTION 2
ACADE MIC
8 PAGE ARCHITECTURE
PORTFOLIO
PROJECT
ELEVATIONS
INTERNATIONAL AVIATION SECOND PROJECT OF THE GRADUATION YEAR OF ARCHITECTURE
& SPACE SCIENCE MUSEUM A BIOMEMIC CONCEPT TAKEN FROM THE BIRD’S HOME THE NEST.