Contractor's Work Schedule- Civil - FDT05 - KING FAISAL-RIYADH

Line FROM TO Item Length BB005 BB007 BB008 asphalt BB034 BB018 BB023 BB025 BB026 BB028 BB029 BB046 BB058 BB085 BB156
No. HH HH & TB Code (C-C) Qty Qty Qty QTY Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty
1 FDT-05 MH TYPE-A-001 12X50mm 13.5 13.5 13.50 1 6 1 1 524
2 MH TYPE-A-001 MMH-002 12X50mm 152.0 152.0 152.00 1 1988.4
3 MMH-002 HH2-003 12X50mm 133.5 133.5 133.50 1
4 HH2-003 HH2-004 12X50mm 70.0 70.0 70.00 1
5 HH2-004 HH2-005 12X50mm 68.6 68.6 68.60 1
6 HH2-005 FDT-04 HH2-016 12X50mm 92.9 92.9 92.90
7 MMH-002 HH2-006 12X50mm 89.8 89.8 89.80 1
8 HH2-006 HH2-007 12X50mm 209.9 209.9 209.90 1
9 HH2-007 HH2-008 12X50mm 68.0 68.0 68.00 1
10 HH2-008 HH2-009 12X50mm 69.3 69.3 69.30 1
11 MH TYPE-A-001 HH2-010 12X50mm 146.1 146.1 146.10 1
12 HH2-010 HH2-011 12X50mm 67.0 67.0 67.00 1
13 HH2-011 HH2-012 12X50mm 74.5 74.5 74.50 1
14 HH2-012 MMH-013 12X50mm 69.6 69.6 69.60 1
15 MMH-013 HH2-014 12X50mm 137.7 137.7 137.70 1
16 HH2-014 HH2-015 12X50mm 86.4 86.4 86.40 1
17 HH2-015 FDT-09 MMH-08 12X50mm 172.5 172.5 172.50
18 MH TYPE-A-001 HH2-016 12X50mm 146.0 146.0 146.00 1
19 HH2-016 HH2-017 12X50mm 215.7 215.7 215.70 1
20 HH2-017 HH2-018 12X50mm 77.3 77.3 77.30 1
21 HH2-018 HH2-019 12X50mm 95.5 95.5 95.50 1
22 HH2-019 HH2-020 12X50mm 80.2 80.2 80.20 1
23 MMH-002 Ref-01 2X20mm 179.7 0 4.7 4.7 0 179.7 1
27 MMH-002 Ref-02 2X20mm 59.5 0 3.5 2 1.5 59.5 1
28 MMH-002 Ref-309 2X20mm 19.5 0 4.5 3 1.5 19.5 1
33 HH2-003 Ref-18 2X20mm 171.0 19 4 4 0 171.0 1
34 HH2-003 Ref-19 2X20mm 152.0 26 4 3 1 152.0 1
35 HH2-003 Ref-20 2X20mm 126.0 25 4 4 0 126.0 1
36 HH2-003 Ref-21 2X20mm 101.0 16 4 4 0 101.0 1
37 HH2-003 Ref-22 2X20mm 84.8 14.5 3.8 3 0.8 84.8 1
38 HH2-003 Ref-23 2X20mm 70.5 12.5 4 3 1 70.5 1
39 HH2-003 Ref-24 2X20mm 57.5 12 3.5 2.5 1 57.5 1
40 HH2-003 Ref-25 2X20mm 45.5 14.5 3.5 2.5 1 45.5 1
41 HH2-003 Ref-26 2X20mm 45.3 0 4 2.5 1.5 45.3 1
42 HH2-003 Ref-27 2X20mm 64.5 0 4 2.5 1.5 64.5 1
43 HH2-003 Ref-28 2X20mm 93.0 0 4 2.5 1.5 93.0 1
44 HH2-003 Ref-29 2X20mm 108.0 12 4 4 0 108.0 1
Contractor's Work Schedule- Civil - FDT05 - KING FAISAL-RIYADH
Line FROM TO Item Length BB005 BB007 BB008 asphalt BB034 BB018 BB023 BB025 BB026 BB028 BB029 BB046 BB058 BB085 BB156
No. HH HH & TB Code (C-C) Qty Qty Qty QTY Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty
45 HH2-003 Ref-30 2X20mm 120.9 12.9 4 4 0 120.9 1
46 HH2-003 Ref-31 2X20mm 156.8 35 4.9 3.5 1.4 156.8 1
47 HH2-003 Ref-32 2X20mm 170.9 14 5 5 0 170.9 1
48 HH2-004 Ref-33 2X20mm 18.3 0 3.8 3.8 0 18.3 1
49 HH2-004 Ref-34 2X20mm 54.7 23.5 4.2 4.2 0 54.7 1
50 HH2-004 Ref-35 2X20mm 69.3 14.5 4.3 3 1.3 69.3 1
51 HH2-004 Ref-36 2X20mm 90.1 20.8 4.3 3 1.3 90.1 1
52 HH2-004 Ref-37 2X20mm 107.2 17 4.4 4.4 0 107.2 1
53 HH2-004 Ref-38 2X20mm 132.1 24.9 4.4 3.4 1 132.1 1
54 HH2-004 Ref-39 2X20mm 150.5 18.2 4.6 3.8 0.8 150.5 1
55 HH2-004 Ref-40 2X20mm 174.6 24.4 4.3 3.3 1 174.6 1
56 HH2-004 Ref-41 2X20mm 192.9 19.0 3.6 3.6 0 192.9 1
57 HH2-004 Ref-42 2X20mm 214.1 33.5 10 9 1 214.1 1
58 HH2-004 Ref-43 2X20mm 174.6 27.0 4 4 0 174.6 1
59 HH2-004 Ref-44 2X20mm 153.5 8.8 9.9 8.5 1.4 153.5 1
60 HH2-004 Ref-45 2X20mm 145.8 23.0 11 10 1 145.8 1
61 HH2-004 Ref-46 2X20mm 121.6 20.2 9.8 7.2 2.6 121.6 1
62 HH2-004 Ref-47 2X20mm 101.7 19.0 10.1 7.4 2.7 101.7 1
63 HH2-004 Ref-48 2X20mm 82.9 49.0 10.3 4.8 5.5 82.9 1
64 HH2-004 Ref-49 2X20mm 24.2 0 7.6 6.2 1.4 24.2 1
66 HH2-005 Ref-50 2X20mm 25.4 0 4.4 3 1.4 25.4 1
67 HH2-005 Ref-51 2X20mm 72.5 40 3.5 3.5 0 72.5 1
69 HH2-005 Ref-53 2X20mm 101.0 28 4 4 0 101.0 1
70 HH2-005 Ref-54 2X20mm 120.5 19.5 4 4 0 120.5 1
71 HH2-005 Ref-55 2X20mm 134.0 13.5 4 4 0 134.0 1
72 HH2-005 Ref-56 2X20mm 146.2 12.5 3.7 2.5 1.2 146.2 1
73 HH2-005 Ref-57 2X20mm 164.0 18 3.5 2.5 1 164.0 1
74 HH2-005 Ref-58 2X20mm 180.0 16 3.5 2.5 1 180.0 1
75 HH2-005 Ref-59 2X20mm 201.7 21.5 3.7 3.7 0 201.7 1
76 HH2-005 Ref-60 2X20mm 213.8 12 3.8 3.8 0 213.8 1
77 HH2-005 Ref-61 2X20mm 231.5 17.5 4 2.5 1.5 231.5 1
78 HH2-005 Ref-310 2X20mm 277.1 45.6 4 2 2 277.1 1
79 HH2-005 Ref-62 2X20mm 236.8 10.5 3.6 3.6 0 236.8 1
80 HH2-005 Ref-63 2X20mm 226.2 7.5 3.5 3.5 0 226.2 1
81 HH2-005 Ref-64 2X20mm 219.2 25 4 4 0 219.2 1
82 HH2-005 Ref-65 2X20mm 199.7 3 9.5 8 1.5 199.7 1
83 HH2-005 Ref-66 2X20mm 196.7 25 9.5 8 1.5 196.7 1
Contractor's Work Schedule- Civil - FDT05 - KING FAISAL-RIYADH
Line FROM TO Item Length BB005 BB007 BB008 asphalt BB034 BB018 BB023 BB025 BB026 BB028 BB029 BB046 BB058 BB085 BB156
No. HH HH & TB Code (C-C) Qty Qty Qty QTY Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty
84 HH2-005 Ref-67 2X20mm 172.0 40 9.8 8 1.8 172.0 1
85 HH2-005 Ref-68 2X20mm 133.5 21.9 11.3 8.3 3 133.5 1
86 HH2-005 Ref-69 2X20mm 112.8 5.5 12.5 8.5 4 112.8 1
87 HH2-005 Ref-70 2X20mm 104.3 32.4 9.5 8.5 1 104.3 1
88 HH2-005 Ref-71 2X20mm 65.9 6.5 3.5 2.5 1 65.9 1
89 HH2-005 Ref-72 2X20mm 60.9 31.5 5 3.5 1.5 60.9 1
90 HH2-005 Ref-311 2X20mm 14.0 0 10 8 2 14.0 1
91 HH2-006 Ref-03 2X20mm 41.7 12 2.7 2.7 0 41.7 1
92 HH2-006 Ref-04 2X20mm 60.8 18.9 2.9 1.5 1.4 60.8 1
93 HH2-006 Ref-05 2X20mm 83.4 22 3.5 2.5 1 83.4 1
94 HH2-006 Ref-06 2X20mm 101.6 17 4.7 3.7 1 101.6 1
95 HH2-006 Ref-07 2X20mm 119.4 18.5 4 3 1 119.4 1
96 HH2-006 Ref-08 2X20mm 145.8 26 4.4 4.4 0 145.8 1
97 HH2-006 Ref-09 2X20mm 158.8 13 4.4 4.4 0 158.8 1
98 HH2-006 Ref-10 2X20mm 193.9 18 4.5 3 1.5 193.9 1
99 HH2-006 Ref-11 2X20mm 143.4 0 5 5 0 143.4 1
100 HH2-006 Ref-12 2X20mm 118.0 0 4.6 4.6 0 118.0 1
101 HH2-006 Ref-13 2X20mm 107.9 0 5 4.5 0.5 107.9 1
102 HH2-006 Ref-14 2X20mm 92.0 0 5.5 4.5 1 92.0 1
103 HH2-006 Ref-15 2X20mm 67.5 0 5 4 1 67.5 1
104 HH2-006 Ref-16 2X20mm 46.0 0 4.5 3.5 1 46.0 1
105 HH2-006 Ref-17 2X20mm 13.0 0 3.5 3 0.5 13.0 1
106 HH2-007 Ref-312 2X20mm 10.5 0 3 3 0 10.5 1
107 HH2-007 Ref-73 2X20mm 48.1 17 3.6 3.6 0 48.1 1
108 HH2-007 Ref-74 2X20mm 67.4 19.5 3.4 2.4 1 67.4 1
109 HH2-007 Ref-75 2X20mm 91.8 24 3.8 2.8 1 91.8 1
110 HH2-007 Ref-76 2X20mm 111.8 20 3.8 2.8 1 111.8 1
111 HH2-007 Ref-77 2X20mm 130.4 18.5 3.9 3.9 0 130.4 1
112 HH2-007 Ref-78 2X20mm 147.0 17 3.5 2 1.5 147.0 1
113 HH2-007 Ref-79 2X20mm 173.2 25.5 4.2 2.7 1.5 173.2 1
114 HH2-007 Ref-80 2X20mm 181.0 8 4 4 0 181.0 1
115 HH2-007 Ref-81 2X20mm 214.5 34 3.5 2 1.5 214.5 1
116 HH2-007 Ref-82 2X20mm 228.0 13 4 2.5 1.5 228.0 1
117 HH2-007 Ref-83 2X20mm 228.1 18.5 5.3 3.8 1.5 228.1 1
118 HH2-007 Ref-84 2X20mm 209.3 17 5 3.5 1.5 209.3 1
119 HH2-007 Ref-85 2X20mm 191.9 17 4.6 3.3 1.3 191.9 1
120 HH2-007 Ref-86 2X20mm 174.8 27.9 4.5 3 1.5 174.8 1
Contractor's Work Schedule- Civil - FDT05 - KING FAISAL-RIYADH
Line FROM TO Item Length BB005 BB007 BB008 asphalt BB034 BB018 BB023 BB025 BB026 BB028 BB029 BB046 BB058 BB085 BB156
No. HH HH & TB Code (C-C) Qty Qty Qty QTY Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty
121 HH2-007 Ref-87 2X20mm 146.6 13 4.2 3 1.2 146.6 1
122 HH2-007 Ref-88 2X20mm 133.4 27 4 2.5 1.5 133.4 1
123 HH2-007 Ref-89 2X20mm 106.4 14 4 2.5 1.5 106.4 1
124 HH2-007 Ref-90 2X20mm 92.7 27 4.3 2.8 1.5 92.7 1
125 HH2-007 Ref-91 2X20mm 65.4 15.9 4 4 0 65.4 1
126 HH2-007 Ref-92 2X20mm 49.5 20 4 4 0 49.5 1
127 HH2-007 Ref-313 2X20mm 13.5 0 3 3 0 13.5 1
128 HH2-008 Ref-314 2X20mm 19 0 4.5 3 1.5 19.0 1
129 HH2-008 Ref-93 2X20mm 49.5 17.5 4.5 3 1.5 49.5 1
130 HH2-008 Ref-94 2X20mm 75 26 4 3 1 75.0 1
131 HH2-008 Ref-95 2X20mm 104 29 4 3 1 104.0 1
132 HH2-008 Ref-96 2X20mm 115.5 12 3.5 3.5 0 115.5 1
133 HH2-008 Ref-97 2X20mm 132.6 16.8 3.8 3.8 0 132.6 1
134 HH2-008 Ref-98 2X20mm 139.8 7 4 4 0 139.8 1
135 HH2-008 Ref-315 2X20mm 154.7 15 3.9 3.9 0 154.7 1
137 HH2-008 Ref-99 2X20mm 202.1 22.8 3.5 2.5 1 202.1 1
138 HH2-008 Ref-100 2X20mm 228.1 25 4.5 3.5 1 228.1 1
139 HH2-008 Ref-101 2X20mm 264.4 56 6.5 6.5 0 264.4 1
140 HH2-008 Ref-102 2X20mm 204.5 31 2.6 2.6 0 204.5 1
141 HH2-008 Ref-103 2X20mm 174.7 16 3.8 3.8 0 174.7 1
142 HH2-008 Ref-104 2X20mm 157.9 12.5 3 3 0 157.9 1
143 HH2-008 Ref-105 2X20mm 145.1 15 2.7 2.7 0 145.1 1
144 HH2-008 Ref-106 2X20mm 136.1 19.5 8.7 7.5 1.2 136.1 1
145 HH2-008 Ref-107 2X20mm 117.9 30.9 10 7.5 2.5 117.9 1
146 HH2-008 Ref-108 2X20mm 79.8 14.7 2.8 2.8 0 79.8 1
147 HH2-008 Ref-109 2X20mm 65.1 37.5 2.8 2.8 0 65.1 1
148 HH2-008 Ref-110 2X20mm 16.8 0 4.8 4 0.8 16.8 1
150 HH2-009 Ref-111 2X20mm 67.4 14.5 5.4 4 1.4 67.4 1
151 HH2-009 Ref-112 2X20mm 77.9 10.5 5.4 4 1.4 77.9 1
152 HH2-009 Ref-113 2X20mm 100.3 22.6 5.2 4 1.2 100.3 1
153 HH2-009 Ref-114 2X20mm 124.4 25 4.3 3 1.3 124.4 1
154 HH2-009 Ref-115 2X20mm 139.1 14.6 4.4 3 1.4 139.1 1
155 HH2-009 Ref-116 2X20mm 152 13 4.3 2.9 1.4 152.0 1
157 HH2-009 Ref-117 2X20mm 199.7 30 4 2.5 1.5 199.7 1
158 HH2-009 Ref-316 2X20mm 233.9 36 2.5 2.5 0 233.9 1
159 HH2-009 Ref-118 2X20mm 199.7 11 4.3 4.3 0 199.7 1
160 HH2-009 Ref-119 2X20mm 192.9 38 8.5 8 0.5 192.9 1
Contractor's Work Schedule- Civil - FDT05 - KING FAISAL-RIYADH
Line FROM TO Item Length BB005 BB007 BB008 asphalt BB034 BB018 BB023 BB025 BB026 BB028 BB029 BB046 BB058 BB085 BB156
No. HH HH & TB Code (C-C) Qty Qty Qty QTY Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty
161 HH2-009 Ref-120 2X20mm 150.1 19.5 3.7 2.5 1.2 150.1 1
162 HH2-009 Ref-121 2X20mm 130.7 32.9 3.8 2.6 1.2 130.7 1
163 HH2-009 Ref-122 2X20mm 97.7 13 3.7 2.5 1.2 97.7 1
164 HH2-009 Ref-123 2X20mm 84.3 12.5 3.3 2 1.3 84.3 1
165 HH2-009 Ref-124 2X20mm 71.8 4 3.3 2 1.3 71.8 1
166 HH2-009 Ref-125 2X20mm 76.3 63 11.8 3 8.8 76.3 1
167 HH2-010 Ref-126 2X20mm 46.6 0 4 2.6 1.4 46.6 1
168 HH2-010 Ref-127 2X20mm 60.9 0 3.8 2.5 1.3 60.9 1
169 HH2-010 Ref-128 2X20mm 87.6 0 4 3 1 87.6 1
170 HH2-010 Ref-129 2X20mm 99.7 0 4.1 3 1.1 99.7 1
171 HH2-010 Ref-130 2X20mm 118.3 8.4 4.3 3.2 1.1 118.3 1
172 HH2-010 Ref-131 2X20mm 136.2 0 4.3 3 1.3 136.2 1
173 HH2-010 Ref-132 2X20mm 187.6 22 3.7 2.2 1.5 187.6 1
174 HH2-010 Ref-133 2X20mm 190.3 44 2.8 1.8 1 190.3 1
176 HH2-010 Ref-135 2X20mm 124.8 18.1 4.8 3.8 1 124.8 1
177 HH2-010 Ref-136 2X20mm 106.9 18.2 5 3.8 1.2 106.9 1
178 HH2-010 Ref-137 2X20mm 88.6 20.7 4.9 3.9 1 88.6 1
179 HH2-010 Ref-138 2X20mm 67.8 19.5 4.8 3.8 1 67.8 1
180 HH2-010 Ref-139 2X20mm 48 16.5 4.5 4.5 0 48.0 1
181 HH2-011 Ref-140 2X20mm 46.9 13.5 3.4 2.4 1 46.9 1
182 HH2-011 Ref-317 2X20mm 61.7 13.5 4.7 3.3 1.4 61.7 1
183 HH2-011 Ref-141 2X20mm 70.2 8.6 4.6 3.3 1.3 70.2 1
184 HH2-011 Ref-142 2X20mm 91.6 21 5 5 0 91.6 1
185 HH2-011 Ref-143 2X20mm 114.2 22.7 4.9 3.5 1.4 114.2 1
186 HH2-011 Ref-144 2X20mm 129.8 15.5 5 3.2 1.8 129.8 1
187 HH2-011 Ref-145 2X20mm 156.8 27 5 5 0 156.8 1
188 HH2-011 Ref-146 2X20mm 170.7 14 4.9 3.5 1.4 170.7 1
189 HH2-011 Ref-147 2X20mm 192.9 22 5.1 3.6 1.5 192.9 1
190 HH2-011 Ref-148 2X20mm 211.9 19 5.1 3.6 1.5 211.9 1
191 HH2-011 Ref-149 2X20mm 226.4 14.6 5 3.5 1.5 226.4 1
192 HH2-011 Ref-150 2X20mm 239.9 13.5 5 3.5 1.5 239.9 1
193 HH2-011 Ref-151 2X20mm 226.9 17.7 5.2 5.2 0 226.9 1
195 HH2-011 Ref-152 2X20mm 187.8 20.5 5.8 4.8 1 187.8 1
196 HH2-011 Ref-153 2X20mm 167.1 19 5.6 4.6 1 167.1 1
197 HH2-011 Ref-154 2X20mm 148.1 17 5.6 4.5 1.1 148.1 1
198 HH2-011 Ref-155 2X20mm 131.1 7.5 5.6 5.6 0 131.1 1
199 HH2-011 Ref-156 2X20mm 123.6 26 5.6 5.6 0 123.6 1
Contractor's Work Schedule- Civil - FDT05 - KING FAISAL-RIYADH
Line FROM TO Item Length BB005 BB007 BB008 asphalt BB034 BB018 BB023 BB025 BB026 BB028 BB029 BB046 BB058 BB085 BB156
No. HH HH & TB Code (C-C) Qty Qty Qty QTY Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty
200 HH2-011 Ref-157 2X20mm 97.6 14 5.6 5.6 0 97.6 1
201 HH2-011 Ref-158 2X20mm 83.4 14.5 5.4 4 1.4 83.4 1
202 HH2-011 Ref-159 2X20mm 69 22.5 5.5 4.2 1.3 69.0 1
203 HH2-011 Ref-160 2X20mm 46.4 16 5.4 4 1.4 46.4 1
205 HH2-012 Ref-161 2X20mm 77.7 25.8 4.9 3.6 1.3 77.7 1
206 HH2-012 Ref-162 2X20mm 86.7 9 4.9 3.6 1.3 86.7 1
207 HH2-012 Ref-163 2X20mm 110.7 23.8 5.1 3.6 1.5 110.7 1
208 HH2-012 Ref-164 2X20mm 136 25 5.4 4.4 1 136.0 1
209 HH2-012 Ref-165 2X20mm 154.5 18.5 5.4 4.4 1 154.5 1
210 HH2-012 Ref-166 2X20mm 188.7 34.5 5.1 4 1.1 188.7 1
211 HH2-012 Ref-167 2X20mm 213.2 24.4 5.2 4 1.2 213.2 1
212 HH2-012 Ref-168 2X20mm 237.2 24 5.2 4 1.2 237.2 1
213 HH2-012 Ref-169 2X20mm 265.2 28.5 4.7 3.3 1.4 265.2 1
214 HH2-012 Ref-170 2X20mm 291.2 25.5 5.2 3.8 1.4 291.2 1
215 HH2-012 Ref-171 2X20mm 254.3 5.8 10.7 6.2 4.5 254.3 1
216 HH2-012 Ref-172 2X20mm 246.3 31.5 8.5 6.5 2 246.3 1
217 HH2-012 Ref-173 2X20mm 209 7.5 2.7 1.3 1.4 209.0 1
218 HH2-012 Ref-174 2X20mm 201.3 33.8 2.5 1.3 1.2 201.3 1
219 HH2-012 Ref-175 2X20mm 186.7 31 2.7 1.5 1.2 186.7 1
221 HH2-012 Ref-176 2X20mm 162.2 40.2 9.2 3 6.2 162.2 1
222 HH2-012 Ref-177 2X20mm 122.8 9 10 6 4 122.8 1
223 HH2-012 Ref-178 2X20mm 112.6 41.2 8.8 6.8 2 112.6 1
224 HH2-012 Ref-179 2X20mm 70.6 35 8 6.6 1.4 70.6 1
225 HH2-012 Ref-180 2X20mm 25.6 0 8.5 7.5 1 25.6 1
226 MMH-013 Ref-318 2X20mm 25.7 0 9.2 7.7 1.5 25.7 1
226 MMH-013 Ref-181 2X20mm 58.4 23.5 8.4 7 1.4 58.4 1
227 MMH-013 Ref-182 2X20mm 78 23.5 4.5 4.5 0 78.0 1
228 MMH-013 Ref-183 2X20mm 98.4 20.5 4.4 3 1.4 98.4 1
229 MMH-013 Ref-184 2X20mm 105.4 7 4.4 4.4 0 105.4 1
230 MMH-013 Ref-185 2X20mm 130 24.4 4.6 3.6 1 130.0 1
231 MMH-013 Ref-186 2X20mm 154.7 24.8 4.5 4.5 0 154.7 1
232 MMH-013 Ref-187 2X20mm 169.9 14.6 5.1 3.3 1.8 169.9 1
233 MMH-013 Ref-188 2X20mm 191.3 21.3 5.2 4.2 1 191.3 1
234 MMH-013 Ref-189 2X20mm 205.1 13 6 6 0 205.1 1
235 MMH-013 Ref-190 2X20mm 222.1 50 4.4 4.4 0 222.1 1
236 MMH-013 Ref-191 2X20mm 177.6 25.6 9.9 7.2 2.7 177.6 1
237 MMH-013 Ref-192 2X20mm 152.2 17.8 10.1 8.5 1.6 152.2 1
Contractor's Work Schedule- Civil - FDT05 - KING FAISAL-RIYADH
Line FROM TO Item Length BB005 BB007 BB008 asphalt BB034 BB018 BB023 BB025 BB026 BB028 BB029 BB046 BB058 BB085 BB156
No. HH HH & TB Code (C-C) Qty Qty Qty QTY Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty
238 MMH-013 Ref-193 2X20mm 134.5 6.9 10.2 6 4.2 134.5 1
239 MMH-013 Ref-194 2X20mm 128.2 31 10.8 2 8.8 128.2 1
241 MMH-013 Ref-195 2X20mm 68.9 52.5 12 7 5 68.9 1
242 MMH-013 Ref-196 2X20mm 13.3 2.9 8.9 5.3 3.6 13.3 1
243 HH2-014 Ref-319 2X20mm 12.3 0 4.6 3.2 1.4 12.3 1
244 HH2-014 Ref-320 2X20mm 25.8 0 4.6 3.2 1.4 25.8 1
245 HH2-014 Ref-197 2X20mm 54.4 0 2.7 1.3 1.4 54.4 1
246 HH2-014 Ref-198 2X20mm 94.6 4.5 8.6 7 1.6 94.6 1
247 HH2-014 Ref-199 2X20mm 118.4 23.8 8.6 7 1.6 118.4 1
248 HH2-014 Ref-200 2X20mm 145 26.5 8.7 7 1.7 145.0 1
249 HH2-014 Ref-201 2X20mm 172.3 27.5 8.5 6.8 1.7 172.3 1
250 HH2-014 Ref-202 2X20mm 215.2 43 8.4 6.7 1.7 215.2 1
251 HH2-014 Ref-203 2X20mm 242.3 32.7 2.8 1.1 1.7 242.3 1
252 HH2-014 Ref-204 2X20mm 262.4 20 2.9 1 1.9 262.4 1
253 HH2-014 Ref-205 2X20mm 262.8 17.5 5.6 5.6 0 262.8 1
254 HH2-014 Ref-206 2X20mm 244.8 25 5.1 3.7 1.4 244.8 1
255 HH2-014 Ref-207 2X20mm 219.8 44 5.1 3.6 1.5 219.8 1
256 HH2-014 Ref-208 2X20mm 175.9 12 5.2 3.7 1.5 175.9 1
257 HH2-014 Ref-209 2X20mm 163.9 36.3 5.2 3.7 1.5 163.9 1
258 HH2-014 Ref-210 2X20mm 127.5 34.5 5.1 3.6 1.5 127.5 1
259 HH2-014 Ref-321 2X20mm 93.2 48.4 5.3 3.8 1.5 93.2 1
260 HH2-014 Ref-322 2X20mm 8.6 0 4.6 3.2 1.4 8.6 1
262 HH2-014 Ref-211 2X20mm 90 24.5 6 4.5 1.5 90.0 1
263 HH2-014 Ref-212 2X20mm 121.5 34 3.5 2.5 1 121.5 1
264 HH2-014 Ref-213 2X20mm 140.9 19.5 3.4 2.4 1 140.9 1
265 HH2-015 Ref-214 2X20mm 64.3 25.5 5.1 3.6 1.5 64.3 1
267 HH2-015 Ref-216 2X20mm 88.6 24.4 5 3.5 1.5 88.6 1
268 HH2-015 Ref-217 2X20mm 109 20.2 5.2 3.7 1.5 109.0 1
269 HH2-015 Ref-218 2X20mm 130.8 21.8 5.2 3.7 1.5 130.8 1
270 HH2-015 Ref-219 2X20mm 142.8 12 5.2 3.7 1.5 142.8 1
272 HH2-015 Ref-220 2X20mm 190.2 15.5 5.1 3.8 1.3 190.2 1
273 HH2-015 Ref-221 2X20mm 219 29 4.9 3.9 1 219.0 1
274 HH2-015 Ref-222 2X20mm 237.8 18.4 5.3 3.9 1.4 237.8 1
275 HH2-015 Ref-223 2X20mm 254 16.5 5 3.5 1.5 254.0 1
276 HH2-015 Ref-224 2X20mm 272 18 5 3.5 1.5 272.0 1
278 HH2-015 Ref-225 2X20mm 237 30.3 9.4 7.6 1.8 237.0 1
279 HH2-015 Ref-226 2X20mm 206.8 3.5 9.5 8 1.5 206.8 1
Contractor's Work Schedule- Civil - FDT05 - KING FAISAL-RIYADH
Line FROM TO Item Length BB005 BB007 BB008 asphalt BB034 BB018 BB023 BB025 BB026 BB028 BB029 BB046 BB058 BB085 BB156
No. HH HH & TB Code (C-C) Qty Qty Qty QTY Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty
280 HH2-015 Ref-227 2X20mm 204.1 53 10.3 10.3 0 204.1 1
281 HH2-015 Ref-228 2X20mm 150.8 12 10 8.3 1.7 150.8 1
282 HH2-015 Ref-229 2X20mm 138.8 28.4 10 8.3 1.7 138.8 1
283 HH2-015 Ref-230 2X20mm 110.1 64.4 9.7 8 1.7 110.1 1
284 HH2-015 Ref-231 2X20mm 23.7 0 7.7 6 1.7 23.7 1
285 HH2-016 Ref-232 2X20mm 175.5 27 4.2 3.2 1 175.5 1
286 HH2-016 Ref-233 2X20mm 148.5 20.5 4.2 2.5 1.7 148.5 1
287 HH2-016 Ref-234 2X20mm 128.2 18 4.4 3 1.4 128.2 1
288 HH2-016 Ref-235 2X20mm 110.2 20.5 4.4 4.4 0 110.2 1
289 HH2-016 Ref-236 2X20mm 89.6 20 4.3 4.3 0 89.6 1
290 HH2-016 Ref-237 2X20mm 69.3 21.8 4 4 0 69.3 1
291 HH2-016 Ref-238 2X20mm 47.5 13 4 4 0 47.5 1
291 HH2-016 Ref-323 2X20mm 18.5 0 3 3 0 18.5 1
291 HH2-016 Ref-324 2X20mm 10.5 0 3 2 1 10.5 1
292 HH2-016 Ref-239 2X20mm 45 0 4.5 3.5 1 45.0 1
293 HH2-016 Ref-240 2X20mm 60.5 0 4.5 3.5 1 60.5 1
294 HH2-016 Ref-241 2X20mm 80.5 0 4.5 3.5 1 80.5 1
295 HH2-016 Ref-242 2X20mm 94.7 0 4.7 4.7 0 94.7 1
Contractor's Work Schedule- Civil - FDT05 - KING FAISAL-RIYADH
Line FROM TO Item Length BB005 BB007 BB008 asphalt BB034 BB018 BB023 BB025 BB026 BB028 BB029 BB046 BB058 BB085 BB156
No. HH HH & TB Code (C-C) Qty Qty Qty QTY Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty
296 HH2-016 Ref-243 2X20mm 123.5 0 4.5 3.5 1 123.5 1
297 HH2-016 Ref-244 2X20mm 142.7 0 3.7 2.7 1 142.7 1
298 HH2-016 Ref-245 2X20mm 164.8 0 4.8 3.3 1.5 164.8 1
299 HH2-017 Ref-325 2X20mm 14.8 0 4.3 2.8 1.5 14.8 1
300 HH2-017 Ref-246 2X20mm 61.9 26 5.4 4 1.4 61.9 1
301 HH2-017 Ref-247 2X20mm 88.9 27 5.4 4 1.4 88.9 1
302 HH2-017 Ref-248 2X20mm 118.4 29.4 5.5 4 1.5 118.4 1
303 HH2-017 Ref-249 2X20mm 142.3 24 5.4 4 1.4 142.3 1
304 HH2-017 Ref-250 2X20mm 174.4 32.5 5 4 1 174.4 1
305 HH2-017 Ref-251 2X20mm 188.9 14.5 5 4 1 188.9 1
306 HH2-017 Ref-326 2X20mm 239.2 33 3.5 3.5 0 239.2 1
307 HH2-017 Ref-252 2X20mm 206.2 28.5 3.5 3.5 0 206.2 1
309 HH2-017 Ref-253 2X20mm 143.2 16.5 3.4 2.8 0.6 143.2 1
310 HH2-017 Ref-254 2X20mm 126.7 21 3.4 2 1.4 126.7 1
311 HH2-017 Ref-255 2X20mm 109.3 57 7 7 0 109.3 1
312 HH2-017 Ref-256 2X20mm 54.3 12.8 9 7.7 1.3 54.3 1
313 HH2-018 Ref-327 2X20mm 39 0 8.7 7 1.7 39.0 1
314 HH2-018 Ref-257 2X20mm 63.8 25.7 4.3 2.9 1.4 63.8 1
315 HH2-018 Ref-258 2X20mm 69.6 6 4.1 4.1 0 69.6 1
316 HH2-018 Ref-259 2X20mm 87.4 17.5 4.4 3 1.4 87.4 1
317 HH2-018 Ref-260 2X20mm 103.6 16.5 4.1 2.3 1.8 103.6 1
318 HH2-018 Ref-261 2X20mm 126.2 22.5 4.2 4.2 0 126.2 1
319 HH2-018 Ref-262 2X20mm 137.6 11.5 4.1 3 1.1 137.6 1
320 HH2-018 Ref-328 2X20mm 153 15 4.5 4.5 0 153.0 1
321 HH2-018 Ref-263 2X20mm 181.9 31 2.4 2.4 0 181.9 1
322 HH2-018 Ref-264 2X20mm 192.4 10.5 2.4 1.9 0.5 192.4 1
323 HH2-018 Ref-265 2X20mm 186.8 20.5 4.8 4.8 0 186.8 1
324 HH2-018 Ref-266 2X20mm 200.8 14 4.8 4.8 0 200.8 1
325 HH2-018 Ref-267 2X20mm 215.2 14.0 5.2 4.2 1 215.2 1
326 HH2-018 Ref-268 2X20mm 236.7 17 9.6 8 1.6 236.7 1
327 HH2-018 Ref-269 2X20mm 219.8 20 9.7 8 1.7 219.8 1
328 HH2-018 Ref-270 2X20mm 199.3 30.6 9.2 7.5 1.7 199.3 1
329 HH2-018 Ref-271 2X20mm 168.9 43 9.4 8 1.4 168.9 1
330 HH2-018 Ref-272 2X20mm 126.2 9 9.7 7 2.7 126.2 1
331 HH2-018 Ref-273 2X20mm 117.1 42.5 9.6 8 1.6 117.1 1
332 HH2-018 Ref-274 2X20mm 74.4 33 9.4 7.5 1.9 74.4 1
333 HH2-018 Ref-275 2X20mm 15.2 0 3.2 1.4 1.8 15.2 1
Contractor's Work Schedule- Civil - FDT05 - KING FAISAL-RIYADH
Line FROM TO Item Length BB005 BB007 BB008 asphalt BB034 BB018 BB023 BB025 BB026 BB028 BB029 BB046 BB058 BB085 BB156
No. HH HH & TB Code (C-C) Qty Qty Qty QTY Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty
334 HH2-019 Ref-276 2X20mm 14 0 9 9 0 14.0 1
335 HH2-019 Ref-277 2X20mm 110 63 10 7 3 110.0 1
336 HH2-019 Ref-278 2X20mm 136.2 27 9.2 7.2 2 136.2 1
337 HH2-019 Ref-279 2X20mm 171 33 11 8 3 171.0 1
338 HH2-019 Ref-280 2X20mm 191.6 22.5 9.1 7.2 1.9 191.6 1
339 HH2-019 Ref-281 2X20mm 288.5 102 4 4 0 288.5 1
340 HH2-019 Ref-329 2X20mm 277.6 33 4.2 3 1.2 277.6 1
341 HH2-019 Ref-282 2X20mm 245.6 13 5.2 4 1.2 245.6 1
342 HH2-019 Ref-283 2X20mm 232.7 14.5 5.3 4 1.3 232.7 1
343 HH2-019 Ref-284 2X20mm 218.4 21 5.5 4.3 1.2 218.4 1
344 HH2-019 Ref-285 2X20mm 197.4 13.5 5.5 4.3 1.2 197.4 1
345 HH2-019 Ref-286 2X20mm 183.2 12.5 4.8 3.5 1.3 183.2 1
346 HH2-019 Ref-287 2X20mm 170.7 15 4.8 3.5 1.3 170.7 1
347 HH2-019 Ref-288 2X20mm 156.1 35 5.2 3.9 1.3 156.1 1
348 HH2-019 Ref-289 2X20mm 120.7 14 4.8 3.5 1.3 120.7 1
349 HH2-019 Ref-290 2X20mm 106.5 11.5 4.6 3.3 1.3 106.5 1
350 HH2-019 Ref-291 2X20mm 95.5 41 5.1 3.8 1.3 95.5 1
351 HH2-019 Ref-292 2X20mm 54.1 19 4.7 3.4 1.3 54.1 1
352 HH-020 Ref-293 2X20mm 51.4 13.5 4.6 3.8 0.8 51.4 1
353 HH-020 Ref-294 2X20mm 71.3 20 4.5 4.5 0 71.3 1
354 HH-020 Ref-295 2X20mm 102.3 31 4.5 4.5 0 102.3 1
355 HH-020 Ref-296 2X20mm 110.7 8 4.9 3.5 1.4 110.7 1
356 HH-020 Ref-297 2X20mm 128.1 16.8 5.5 4 1.5 128.1 1
358 HH-020 Ref-299 2X20mm 153 26 4.4 3 1.4 153.0 1
360 HH-020 Ref-300 2X20mm 209.4 27 4.3 3 1.3 209.4 1
361 HH-020 Ref-301 2X20mm 235.7 26 4.6 3 1.6 235.7 1
362 HH-020 Ref-302 2X20mm 246.2 10.5 4.6 3 1.6 246.2 1
363 HH-020 Ref-303 2X20mm 268.4 63.3 1.7 0 1.7 268.4 1
364 HH-020 Ref-304 2X20mm 212.7 42.5 9.3 7.5 1.8 212.7 1
365 HH-020 Ref-305 2X20mm 170.2 22 9.3 7.5 1.8 170.2 1
366 HH-020 Ref-306 2X20mm 148.2 20.6 9.3 7.5 1.8 148.2 1
368 HH-020 Ref-307 2X20mm 104.8 41.3 9.5 8 1.5 104.8 1
369 HH-020 Ref-308 2X20mm 63.5 52.5 9.5 8 1.5 63.5 1
Total-Qty Various 48,215.30 2,336.00 6,753.80 1,821.60 152.08 2,336.00 45,879.30 2 17 1 6 325 1 1 7,537.20
PU Item Description Various BB05 BB07 BB08 BB034 BB18 BB23 BB25 BB26 BB28 BB29 BB46 BB58 BB085 BB156
RTP Number
ALHJ-RYH-KFSL-WO-28
Remarks
RTP Number
ALHJ-RYH-KFSL-WO-28
Remarks
RTP Number
ALHJ-RYH-KFSL-WO-28
Remarks
RTP Number
ALHJ-RYH-KFSL-WO-28
Remarks
RTP Number
ALHJ-RYH-KFSL-WO-28
Remarks
RTP Number
ALHJ-RYH-KFSL-WO-28
Remarks
RTP Number
ALHJ-RYH-KFSL-WO-28
Remarks
RTP Number
ALHJ-RYH-KFSL-WO-28
Remarks
RTP Number
ALHJ-RYH-KFSL-WO-28
Remarks
RTP Number
ALHJ-RYH-KFSL-WO-28
Remarks
RTP Number
As Built BOQ -(Civil) Summary - (FDT-005-FTTH 2020 King Faisal District -Riyadh)
ALHJ-RYH-KFSL-WO-28

S/No. PU # Item Description UOM Unit Price Qty Total Remarks

Trench excavation 200MM X 650MM in ROCK including full concrete back filling (with 1M2 milling and
paving) compaction and complete reinstatement. (Lump sum cost, inclusive of preparing all kinds of
1 BB005 M 90.000 2,336.00 210,240.00
drawings, obtaining permits transporting surplus excavated material to designated area etc.) without
marker post.

Trench excavation 100~130MM X 600MM in ROCK including full concrete back filling (with 1M2 milling and
2 BB007 paving) and complete reinstatement. (Lump sum cost, inclusive of preparing all kinds of drawings, obtaining M 84.000 6,753.80 567,319.20
permits, transporting surplus excavated material to designated area etc.) without marker post.

Trench excavation 90MM X 450MM in Rock including full concrete back filling with 1 M2 milling and paving
3 BB008 (Lump sum cost, inclusive of preparing all kinds of drawings, obtaining permits, reinstatement, transporting M 74.000 1,821.60 134,798.40
surplus excavated material to designated area etc.)

4 BB156 Milling and paving by approved supplier of MOT or Municiplaity Sq.M 50 7,537.20 376,860.00

Supply and install 12x50mm HDPE PE100,PN 16 (40.8mm/50 mm (ID/OD)) duct with detectable warning
5 BB018 tape, 6mm Nylon rope, end caps and spacers for 20cm trench M 84.00 2,336.00 196,224.00

Supply and install 2x20mm HDPE PE100,PN 16 duct with detectable warning tap, spacer, 4mm Nylon rope
6 BB023 and end caps. M 10.98 45,879.30 503,754.71

Supply and install Mini-manhole Type-2 with round cover heavy duty cover as per ITC approved design by
7 BB025 approved supplier. Each 8,528.00 2.00 17,056.00

Supply and install Two cover Handhole with square heavy duty cover as per ITC approved design by
8 BB026 approved supplier. Each 3,659.00 17.00 62,203.00

Supply and installation of Street Cabinet Foundation as per ITC approved design and supplier for street
9 BB028 cabinets. Each 3,750.00 1.00 3,750.00

10 BB029 Supply and installation of protection post (Dia. 150mm) as per ITC approved design and supplier Each 236.41 6.00 1,418.46
11 BB034 Breaking and reinstatement of normal concrete tile. Sq.M 89.78 152.08 13,653.74
Supply and install Galvanized U-guard 1.5M height (60mm OD) to accommodate 2x20mm duct with
12 BB046 minimum wall thickness of 2mm and 60 micron of galvanising and clamps with marking plate for Each 48.88 325.00 15,886.00
codification.
Supply and install manhole Type-A with round cover heavy duty cover as per ITC approved design by
13 BB058 Each 13,545.00 1.00 13,545.00
approved supplier.
Survey, plan, design.asbuilt and updating as built in GIS prducing, updating all type of drawings and
14 BB085 inventory in GIS/GDI, per FDT inckuding distriction and feeder design and as built binder and updating in Per stree 14,000.00 1.00 14,000.00
GIS/GDI

Total 2,130,708.516