Answer to the question no 1:
Our selected product is drinking water.

Answer to the question no 2:


Equipment
a. Suitability.
(1) All plant equipment and utensils will be appropriate for their intended use. This include all
assortment and capacity piping, tanks, fittings, connections, bottle washers, cappers and other
equipment which might be utilized to store, handle, process, bundle, or transport product water.
(2) All product water contact surfaces will be developed of nontoxic and nonabsorbent material
which can be sufficiently cleaned and disinfected and is in consistence with Bangladesh Water
Act 2013 (BWA).
b. Design
Storage tanks will be of the kind that can be shut to bar all foreign matter and will be sufficiently
vented.

Production and Process Controls


Mineral water creation Process Controls follows different advances.

Step-1: raw water is collected in the tank. An available quantity is tapped into the above tank

where water is mixed with alum to solidify with sufficient metal or inexplicable problems.

Step-2: After the quartz sand filter is allowed to form due to the water with a few minutes.

Uncleanness can be eliminated through reverse osmosis method. Supernatant water is transported

to the activated carbon filter tank where the essential sterilization is done by perforating the

chlorine gas.
Step-3: The water then passes through the fish filter channel to capture the dissolved

contaminants. After filtration, water passes through carbon channels for odor, shade and

chlorination.

Step-4: It then goes through a series of contained miniature fillers. The last advance is pressed.

Step-5: Prerequisite is pressed through a programmed washing, filling and covering machine

attached to the ozone generator. The containers are then wrapped and stuffed into a dozen

layered boxes. In addition to untreated water, other natural substances are needed in synthetics,

reagents, pockets, containers, and outdoor. In a mineral water plant, the main required utility is

electricity.

Time for producing per unit

1. Raw water tank


2. Quartz sand filter
3. Carbon Filter
4. Pumping
5. Gas water mixer

Our automation machine can make 160units per day in 8-hour workday

So, our cycle time is 3 minutes

Raw water Quartz sand Carbon Pumping Gas water Final water
tank filter filter mix product
Workstatio Workstation Workstation Workstation Workstation
n1 2 3 4 5
3 minutes 3 minutes 3 minutes 3 minutes 3 minutes
8am 8.03am 8.6am 8.9am 8.12am 8.12am
If a bottle starts to manufacture at 8am in the morning it finished by 8.12am.
Answer to the question no:3

Step: 1- Raw Water

Raw water
tank
Pump Step: 2 Quartz sand
filter

Step:3

Carbon Filter
(Activated)

Fine filter
Step: 4

Final water Pumping


product

Step:5 Ozone
generator

Gas
water
mixer