Professional Documents
Culture Documents
50 Km of MRBC
Clear Span = 5.70 m Loading = IRC Class AA - Tracked (70 R Tonne)
Eff. Span (L) = 6.15 m Ratio of K = L' / L = 8.45 ÷ 6.15 = 1.37
Overall width of deck slab (L') = 8.45 m
Overall length of deck slab = 6.95 m From Table :- K = 2.80
Bearing for slab= 0.40 m
Thickness of deck slab = 0.50 m 15 20.68 %
Impact Factor = 10 + 9 - 6.15 =
Effective Cover = 4 cm (9-5)
Main Reinforcement dia = 20 mm
Dist. Bar diameter = 12 mm
Dia of Top bars = 10 mm
Grade of Cocrete = M25
Safe Stress in Steel (t)
For Main Reinf. = 2000 Kg / Sq cm
For Dsitri. Reinf. = 2000 Kg / Sq cm
Live Load :- 70 T
3.75
x=3.075 x= 0.775
6.15 m
0.075
Dispersion Width be = 1.00
2.80 x 3.075 [1-( 3.075 ÷ 6.55 )] + 1.00 = 5.305 m bw = 0.85 + 2 x 0.075
Effective Width =
2.10 + 2.05 + ( 5.305 ÷ 2 ) = 6.802 m 0.20 0.227
1.20
0.85 0.85
Intensity of Loading = 0.05
1.20
[ 70 x 1000 x (1 + 0.20 ) ] = 2594 Kg / sqm
6.802 x 4.76
x 2.10 2.05
2594 Kg / sqm
4.76 C = 0.05+0.2+0.225+1.2+0.425
= 2.10
A B
x= 0.675 x x= 0.675
6.15
Ra= 6174 Rb= 6174
6.15 4.76 2
Therefore Max. BM due to Live Load = 6174 x
2 - 2594 x
8
= 11638 Kg-m
1640 x 6.15 2
BM due to Dead Load = = 7754 Kg-m
8
Total BM = LL BM + DL BM = 11638 + 7754 = 19392 Kg-m
For M25 grade of Concrete : For Main Reinforcement :- MRt = 11.05 j= 0.902 tt= 2000
For Distri. Reinforcement :- MRa = 11.05 j= 0.902 ta= 2000
19392
Effective depth d = = 41.89 cm < 46 cm Hence O.K.
11.05
19392 x 100
Reqd. Area of Main Reinf. = = 23 Sq cm
2000 x 0.902 x 46
0.08 x 50 x 100
Min. Area of Distribution Reinf. = = 4.0 Sq cm
100
Design of Abutment
Design of Pier
13.90
Approach Slab
WC
0.6 1.60
M 15
6.00
0.70
30 M 10
20
22.5 27.5 Wearing Coat = M25 CC 20 mm D /S metal
77 5
750 Deck Slab = M25 CC 20 mm D /S metal
M20 0.45 Abutment = M15 CC 40 mm D /S with 5 Kg / Sqm steel
Padding = M10 CC 40 mm D/S metal
M15 Approach Slab = M15 CC 20 mm D/S metal
845 3.5 m length with 12 mm dia 15 cms C / C
Both ways Top and Bottom Mesh
M10 30
ABUTMENT
Reinforcement details of Road Bridge
(d) (c)
40 6.95
(e)
50
50
(f)
40 (g)
5.70
30
30
(a) (b)
Dirt Wall and Bearing Slab Cross section of Deck Slab
32
72
7 (g) 12 18 1 x 48 2.03 22 97.44 0.89 86
Total Weight of Steel in Kgs = 2163
1 Steel for Deck slab,Dirt wall & Bearing Slab = 22x x 2163 = 4326
2 Steel for Pier, Pier cap & Footing = 865
3 Steel for abutment at 5 Kg / Sqm 500
4 Steel for Approach Slab, Parapet, kerbs, returns etc., 1800
Total Weight of Steel in Kgs = 7491
Say 7.60 M.T.
Note:-
1 The approach Slabs are of M15 CC, 20 mm D/S, 15 cms thick, with reinforcement of
12 mm dia bars at 15 cm c /c bothways both at top and bottom as mesh.
2 The Abutments / Returns are of M15 CC 40 mm D/S with surface steel of 5 Kg / Sq m.
(Main bars of 12 mm dia at 25 cms C/C and Distribution bars of 8 mm dia at 25 cms C/C)
3 Reinforcement shall be of HYSD bars confirming to latest IS code
4 Laps shall be avoided at the centre of the span.
5 Lap length shall be 55 times the diameter and it shall be staggred.
6 The details shown in the schedule are typical and one set of bars are to be bent and
examined for their suitability at site.
Pier cap design:-
DATA:
18821 Kg/m
8.45m
0.20 m
0.40 m
1.48m 5.50m
2
For M 25 CC t= 2000 Kg / m
2
C= 83.33 Kg / m
Q= 11.050
j= 0.902 m
20681 x 1000
de required= =48.36cms < 55.0 cms
11.05 x 0.8
20681x 100
Ast= = 19.01 Sqcms
2000 x 0.902 x 55
Check for minimum steel in beams = 0.20 x 0.80 x 0.60 = 9.60 Sqcms
100
Provide 4 Nos. 25.00 Tor at top = 19.63 Sqcms > 19.01 Sqcms
Provide 4 Nos. 12.00 Tor at bottom
V+ M tanβ
τv= d from IS 456 B-5.1.1 Page 84
bd
2 2
c= 0.294 N / mm or 2.94 Kg / cm
550
565
695
60
Loads:-
1) Load from Deck slab = 159038 Kg
0.60 x 5.50 x 0.80 x 2500 = 6600 Kg Note : All dimensions are in Cms
2
Area of Pier provided = 550 x 60 = 33000 cm
Hence OK
2
At required @ 0.8% of c/s= 0.8 x 3991 = 31.93 cm
100
Min. steel @ 0.3% of C/sec
2
0.3 x 33000 = 99.00 cm
100
Provide pier reinforcement of 16 mm dia at 19 cm c / c on both faces
Provide a distribution steel of 10 mm dia at 18 cm c / c
2 2
Area of main Steel Provided = 120.43 cm > 99.00 cm
2 2
Area of Dist. Steel Provided = 8.73 cm > 7.20 cm
2
(min steel of 0.12 % cross section) cm
Pier Footing :-
Loads:-
1) Load from Pier = 182967 Kg
2) Weight of Footing =
5.65 x 0.75 + 1.90 x 6.95
x 0.20 x 2400
2
+ 1.90 x 6.95 x 0.20 x 2400 10525 Kg
Total load on ground = 193492 Kg
193492
Pressure at base = = 14652 Kg / m2
1.90 x 6.95
14652 x 0.65 2
BM for footing = = 3095 Kg-m
2
3095 x 100
Area of steel reqd. (At) = = 5.52 cm 2
2000 x 0.933 x 30
60
40
550 (i) (j)
x (i1)
210
80 (k)
60
550
72
3 (i1) 12 17 50 2.63 52 131.5 0.89 117
(At centre)
Pier
300
542
4 (k) 10 18 14 12.03 52 168.42 0.62 105
Footing
5 (l) 12 20 36 2.20 20 180 20 79.2 0.89 70
75 59
7 (n) 8 20 35 2.22 15 15 77.7 0.39 31
550 59
8 (o) 8 20 11 6.67 73.4 0.39 29
15 15
Total Weight of Steel for one pier & footing in Kgs = 865
STABILITY ANALYSIS OF ABUTMENT:---
DATA:----- Height abutment (in mts):--- (Ha) 2.40 m
Top width of abutment(in mts):----- A= 0.40 m
B= 0.40 m
Dirt wall depth :----------- C= 0.30 m
Bottom width of abutment(in mts):----- X= 0.000 m
Y= 1.200 m
Depth of abutment above FSD (in mts) :----- 0.30 m
Depth of abutment below CBL (in mts):--- Z= 0.70 m
Depth of slab(in mts):------ 0.500 m
Thickness of bed concrete(in mts):---- 0.30 m
Offset of bed concrete(in mts):----- 0.30 m
Vertical reaction (in Kgs):---- 12466 Kgs
Horizontal reaction (in Kgs) ------- 3527 Kgs
3
A= 0.40 m Density of material used for abutment(in Kg/m3):---- 2400 Kg/m
Density of soil(in Kg/m3):---- 2080 Kg/m
3
B= 0.40 m
V
0.50 m
5 H
6 0.30 m
Ha= 2.40 m
7
Ep 2 3
CBL
4 0.70 m
1 0.30 m
A
0.80
1.20
(A+B) Y
2.00 m
2.60 m
SL. V H LA M+ M-
No. Particulars (Kgs) (mts) (in mts) (Kg-m) (Kg-m)
1 0.30 X 2.60 X 2300 1794.00 1.300 2332.20
2 0.800 X 2.40 X 2400 4608.00 0.700 3225.60
3 0.5 X 1.20 X 1.70 X 2400 2448.00 1.500 3671.90
4 1.20 X 0.70 X 2400 2016.00 1.700 3427.20
5 0.400 X 0.800 X 2500 800.00 0.500 400.00
6 0.400 X 0.30 X 2500 300.00 0.900 270.00
7 0.300 X 3.200 X 2080 1996.80 0.150 299.52
10 Vertical reaction V 12466.00 0.900 11219.40
11 Horizontal reaction H 3527.00 3.000 10581.00
12 Earth Pressure(Ep)
0.3333 X 0.5 X 2080 X 3.500 X 3.500 4246.24 1.167 4953.95
26428.80 1.528 40380.77
S M = 40380.77
S M 40380.77
X = = = 1.528 m
S V 26428.80
b 2.60 b
e = - X = - 1.528 = 0.228 m But = 0.433 m
2 2 6
b
ie., e < Hence o.k.
6
Pmax S V 6X e
= 1 +
(or) Pmin b b
26428.80 6X 0.228
= 1 +
2.60 2.60
Pmax = 15511 Kg/m2 Both are compressive. Hence o.k.
Pmin = 4819 Kg/m2