Ausenco: 104688-EE-00000-28000-002

CMBSAA: SGB-DES-DSH-100-EL-002
Revision Number: T1

Compañía de Minas Buenaventura S.A.A.

EP Phase 1 - San Gabriel Project

Data Sheet -
Electrical Room
November, 2021
Rev Date Description Prepared Checked Approved
A 8/2/2021 Issued for Internal Review R.S. R.F. H.J.
B 10/15/2021 Issued for Client Approval R.S. R.F. H.J.
T1 11/8/2021 Issued for Tender R.S. R.F. H.J.

104688-EE-00000-28000-002
Rev: T1
Date: November, 2021 Page 2 of 3
CMBSAA: SGB-DES-DSH-100-EL-002
EP Phase 1 - San Gabriel Project
DATASHEET Rev
DOCUMENT No: Ausenco: 104688-EE-00000-28000-002
CLIENT DOCUMENT No: SGB-DES-DSH-100-EL-002
TAG: Refer to: 104688-EE-00000-24242-001
EQUIPMENT NAME Electrical Room
QUANTITY REQUIRED: Refer to: 104688-EE-00000-24242-001
CONTRACT PACKAGE No.: 201
VENDOR: (*)
1.00 General Desing
1.01 Manufacturer - (*)
1.02 Location of assembly plant - (*)
1.03 Altitude m.a.s.l 4 850
1.04 Atmosphere: (Salty / Abrasive Dust / Sulfuric Acid) - Abrasive Dust
1.05 Primary Standard (Design, manufacturing and testing) IEC
1.06 Duty - 24 hours/day, 365 days/year
2.00 Equipments to be Installed in the E-Room
Fire Alarm System (include all devices and accesories), analog type,
2.01 - Required according to NFPA-72
directionable, 220 Vac, 60 Hz and approved by CSFM and FM.
Smoke Detectors Req'd, directionable, multisensor (fotoelectric and
2.02 Required
thermic), 2 wires, approved by CSFM and FM -
Fire Alarm System shall have relay contacts to stop the presurization
2.03 - Required
system and HVAC, and to give alarm.
2.04 Fire Suppression Systems FM-200 - Required
2.05 Strobe lights at each door and an audible alarm horn - Required
2.06 Accesories of Fire Alarm System - Required
3.09.01 Audio Control Module - Required
3.09.02 Manual Box of fire detection - Required
3.09.03 Monitoring and control Module - Required
2.07 Sprinklers for FM200 - Required
3.00 Notes
3.01 Vendor to fill datasheet information (*).

TBA - To be advised (when we do not have data but will have eventually)
TBC - To be confirmed (when we have preliminary data but are waiting to confirm)
3.02
VTA - Vendor to advise (this is information the vendor must supply)
VTC - Vendor to confirm (This is data we have inserted from preliminary calcultions but the vendor will have to confirm)