You are on page 1of 1

TC

BS
-X3.28 -X2.18 208 -X1.16 -X1.24
4 5

37

35 Watchdog
002.5E
33 -X1.17 -X1.22
1 M 2
36
002.5E
34

6 CC

-X3.27 -X2.17 207 -X1.15 -X1.23


trip 4 output 1 6 7

CB 2

75
12
211
output 2 32 1
76 open 10
L4 31 1 Indikator Gangguan DGR L9
CB 8
67 30 1 Indikator Gangguan OCR Instan L8
212 29 1
16 Indikator Gangguan OCR 1 L7
BS 68 close output 3 L7 28 1 Indikator CB Open L6
14
INCOMING CB 27 1 Indikator CB Close L5
49 20
20kV 213 26 1 Indikator Alarm L4
output 4
18 25 1 Current Test Block TB1
R S T 50 L8
24 1 Box Switching BS
1
51 23 1 VCB 52
output 5 214
3
22 1 PROTECTION RELAY P1

303
52 L9
5 21 1 HEATER H4
53 output 6 20 4 GROUND GND
7
19 1 VCB AUXILLIARY SWITCH SE1
54 9 SE1 18 1 THERMOSTAT TH1
output 7 -X1.18 -X1.28 209 -X2.21 -X3.25
11 17 1 VCB MOTORIZED 24 V DC M
55 9 10
L5 16 1 TRIPPING COIL TC
13 SE1 15 1 CLOSING COIL CC
56 output 8 -X1.19 -X1.27 210 -X2.22 -X3.26
15 14 1 KOTAK KONTAK KK
TB1 15 16
2S1 -T1 10 -X1.1 -X2.1 -X3.1 10 41 L6 13 1 CHARGER 220 V AC - 24 V DC BC1
+
2S2
2S1 -T2 20 -X1.2 -X2.2 -X3.2 20 control 22
input 1 12 2 DRY CELL BATTERY 12 V DC, 17 Ah B1
42 open 24 206 3 4
2S2 30 - 11 1 SELECTOR SWITCH ON/OFF CONTROL S1
2S1 -T3 30 -X1.3 -X2.3 -X3.3
-PB2 10 1 OPEN SWITCH PB2
43 +
2S2 N1 -X1.4 -X2.4 -X3.4 N1 control 26
close 28
input 2 205 3 4
9 1 CLOSE SWITCH PB1
44 - 8 2 LINE UP TERMINAL X1, X3
1S1 -T4 40 -X1.5 -X2.5 -X3.5 40 -PB1
003.2D + SE1 7 1 LINE UP TERMINAL HEAVY DUTY X2
aux 17 305 -X1.21
1S2
50 50 45 input 3
1S1 -T5

1S2
-X1.6 -X2.6 -X3.6

60
003.2D
kWh Meter
P1 CB On 19
-
-X3.24 -X2.20
13 14
-X1.26 6 3 MCB 2 A Q3,Q4,Q5

1S1 -T6 60 -X1.7 -X2.7 -X3.7 5 1 MCB 6 A Q2

303
003.2E 46 +
aux SE1 4 1 MCB 6 A Q1
1S2 N2 -X1.8 -X2.8 -X3.8 N2 21
input 4 304 -X1.20
003.2E CB Off 23 -X3.23 -X2.19 -X1.25
47 3 3 VT Metering T7, T8, T9
-GND Q3 - 11 12
70 -X1.9 -X2.9 -X3.9 70 2 3 CT Metering T4, T5, T6
+
1 Q4 2 48 25 3 CT Proteksi T1, T2, T3
input 5 1
80 -X1.10 -X2.10 -X3.10 80 27
1 Q5 2 - No Jumlah Nama Komponen Kode
-T7 69
90 -X1.11 -X2.11 -X3.11 90
+ 303 -X2.15
1 2
58 -X2.16 204
N3 N3 input 6
-T8
-X1.12 -X2.12 -X3.12 70 60
-
PT PLN (PERSERO)
R 71 +
UNIT INDUK DISTRIBUSI JAWA TIMUR
57
-T9 59 input 7 002.2B
S
72 - Supply Relay Pekerjaan :
+ 002.2B
24 VDC
-X3.25,26
73 61
T input 8 OUTDOOR METERING CUBICLE (OMC)

303
204
74
+
64
-GND
4 NO Penugasan PK : 1965/DAN.02.03/DIST-JATIM/2019
003.2F S1
52 + 3
NO Penugasan KI :
63
B1 B1
003.2G NO Gambar : INOV-DISJATIM-L-6-PMCB4-002
kWh Meter - + - +
003.2G
+ -X3.17 -X3.18 JUDUL :
66
003.2H
Q2 Q1

+
203 201 -X3.15 + L 200
L Supply
WIRING PANEL KONTROL OMC
1 2 2 1
OUTGOING 65 - BC 1
62 -X3.16 301 N 220 VAC
3 4
300
- N
4 3
SUB JUDUL :
29
BS WIRING DIAGRAM RELAY MICOM P127
30

302

202
- TH1
31
KK DISETUJUI DIPERIKSA DIGAMBAR
32
+
tgl : tgl : tgl : tgl :
1 2

-X2.13
77 202
-X1.14
202 -X3.13
78
H4
- -X1.14
302 -X3.14 Manager Enjiniring Manager Unit MB Produksi Ananto D.S.
79
80 -X2.14
+

-
IRIG B 81 Shop Drawing As Build
Modul 82
+
3
-
IRIG B 83 2
Modul 84
PUSHARLIS-F-7.1-1-06

+ 1
SIZE : A3

0
SEMUA UKURAN DALAM
DIREVISI DIPERIKSA DISETUJUI
SATUAN MILIMETER REV. TANGGAL KETERANGAN OLEH OLEH OLEH

JENIS PROYEKSI

PT PLN (PERSERO)
PUSAT PEMELIHARAAN KETENAGALISTRIKAN
HALAMAN:
SKALA: 2 dari 3

You might also like