Engineering & Quality Directorate CSMART Goal

1. CSMART Goal for Engineering and Quality Directorate Director

 Develop strategic electrical plans by studying operational plans; studying existing


conditions determining needs to accomplish operational plans; mapping solutions;
updating and modifying requirements and solutions; preparing cost estimates and
budgets within a specified period of time.
 Direct and coordinate in-depth insight into the dynamics and issues surrounding all
engineering projects political, economic, social, environmental and technological
impacts within established timeframes.
 Correct and improve initiatives and plans which help put into practice and support the
project’s vision and direction, including those shared with other departments for project
ongoing basis.

 Provides centralized Engineering Support Services and Project monitoring and contract
administration ongoing basis.

 Resolve 90% of complaints by establishing, following, and enforcing standards and
procedures; complying with codes and legal regulations to maintains safe and healthy
work environment ongoing basis.

 Plans electrical projects by determining specifications dealing with periodic activity
reports and selecting contractors by analyzing code requirements and updating cost
estimates.

 Evaluates the impact of the risk outcomes and adherence to the in law each month on a
timely and accurate fashion.

 Ensures the availability of proper engineering data base system and provides the
necessary and full information to internal and external users when required on issues of
compliance

 Sets sufficiently high expectations of staff engaged in the work program plans,
objectives and resource for the process; organizing, scheduling, assigning and
monitoring work projects; ensuring and making recommendations to the immediate boss
on personnel and labor relations matters as measured by performance reviews, training
and development, disciplinary actions, employee complaints, disputes and termination.

 Prepares monthly periodic activity reports and the annual budget of the processes and
submits to the stakeholders and thereby manage the department budget to stay within
appropriations and accomplish -% of service results
 Oversee fully implement EEU’s competency based performance management system to
increase the EEU’s Performance on going base.

2. CSMART Goal for Head, Quality Assurance/ Control & Field Quality Assurance

 Oversees **% of Quality Audits at locations for implied by the company operations with
given standards and purchasing distribution and ICTs items within a specified period of
time.
 Approve Vendor assessment for new locally manufacturers and assembler within **
week to check their capacity and to get quality of equipment/material.
 Approve all imported and locally manufactured items aligned to the contract agreement
within established timeframes.
 Approve all inspection test plan and Manufacturing quality plan (MQP) for the items to
be procured by procurement to assure the quality of goods and equpiment in regular
basis.
 Oversee preparation of the EEU’s annual Quality Assurance/ Control & Field Quality
Assurance improvement plan for better performance.
 Ensure that safety and quality measures are implemented on time and in accordance with
regulations
 Prepares periodic activity reports and the annual budget of the processes and submits to
the Engineering, Directorate Director thereby: Monitors progress against budget and
explains variances and Forecasts future personnel and equipment needs timely &
periodically.
 Prepares monthly periodic activity reports and the annual budget of the processes and
submits to the Engineering, Directorate Director thereby: Monitors progress against
budget and explains variances and Forecasts future personnel and equipment needs.
 Oversee fully implement EEU’s competency based performance management system to
increase the EEU’s Performance on going base

3. CSMART Goal for Head, Sub Transmission Engineering


 Develop the ** amount of investment plan at the beginning of budget year to prioritize
and analyzes the benefit of the investments.
 Ensure ** no. of designs and plans to be ready for modifications & expansion to Sub
transmission and the distribution System & design approval for contractor for the
fulfillment of design requirements in ** business days.
 Define overall master schedule initiates studies & select the most adequately satisfy
engineering and economic criteria to determine the effect of the expected loads on the
distribution facilities to serve these loads for a year.
 Prepare and Define effective project schedule and project implementation and
supervision plan in a week to timely accomplish of the project.
 Prepare & direct ** amount sub transmission construction plan and project execution
and control project performance in a budget year.
 Manage ** amount public tender and material return, repair and disposal in year to have
quality material.
 Develop **amount strategic electrical plan by studying operational plans; studying
existing conditions; determining needs to accomplish operational plans; mapping
solutions; updating and modifying requirements and solutions; preparing cost estimates
and budgets in year.
 Manage **amount contract agreement provide consultancy services for sub transmission
project’s design; construction and civil works to insure the effectiveness of project in a
project period.
 Prepares monthly periodic activity reports and the annual budget of the processes and
submits to the Engineering, Directorate Director thereby: Monitors progress against
budget and explains variances and Forecasts future personnel and equipment needs.
 Oversee fully implement EEU’s competency based performance management system to
increase the EEU’s Performance on going base.

4. CSMART Goal for Head, MATERIAL Engineering

 Identify and Assess ** amount of Leading Technology to advancement service in regular


basis.
 Prepare ** amount Project Proposal to upgrade distribution material specification within
project period.
 Develop the ** amount of input for investment plan within a year to select and analyzes
the benefit of the investments.
 Approve ** amount report of Analysis of material and data, test conducted, troubleshoot,
performance, quality control and documentation created ongoing basis.
 Check **amount report of product failure data and laboratory test results in order to
determine causes of problems and develop solutions in month.
 Supervise **amount test on raw materials or finished products in order to ensure their
quality in a period of time.
 Design and direct **amount testing and control of processing procedure for the
effectiveness of process in a year.
 Develop and review **amount of distribution material technical specification and
economic factors relating to process as per the recent international standards & product
design objectives for effectiveness of process & product design ongoing basis.
 Develop all engineering price estimation of distribution material to compare with market
price in regular basis.
 Review **amount of clarification on distribution material technical specification under
procurement in regular basis.
 Plan and implement **amount laboratory operations for the purpose of developing
material and fabrication procedures that meet cost, product specification, and
performance standards ongoing basis.
 Review and make recommendations **amount new product plans for material selection
based on design objectives, such as strength, weight, heat resistance, electrical
conductivity, and cost in a year.
 Prepares monthly periodic activity reports and the annual budget of the processes and
submits to the Engineering, Directorate Director thereby: Monitors progress against
budget and explains variances and Forecasts future personnel and equipment needs.
 Oversee fully implement EEU’s competency based performance management system to
increase the EEU’s Performance on going base.

5. CSMART Goal for Head, DISTRIBUTION Engineering

 Review **amount Established and developed systems, policies and procedures for
distribution project management and administration of contracts to improve the efficiency
ongoing basis.
 Approve **amount Project Proposal Prepared and estimated time, cost, labor, and
materials that are needed for distribution Projects to have extended & rehabilitated
network in the project period.
 Develop the ** amount of input for investment plan within a year to select and analyzes
the benefit of the investments.
 Approve ** amount report of Analysis of material and data, test conducted, troubleshoot,
performance, quality control and documentation created annul basis.
 Review ** amount complex electrical computation to determine type and arrangement of
circuits and size, type, sag(droop), stress and number of pieces of equipment, such as
transformers, circuit breakers, switches, and lightning arresters for capable distribution
network in a year.
 Check **amount report of product failure data and laboratory test results in order to
determine causes of problems and develop solutions in month.
 Review **amount report on distribution project meet electrical and construction safety
regulations to have continuous distribution network operation in the project period.
 Approve **amount test supervision and conduction on raw materials or finished products
in order to ensure their quality within a year.
 Approve **amount feasibility studies prepared for new for new distribution projects and
estimating material, construction, and labor costs, and project time scales to extend
electric network within budget year.
 Design and direct **amount testing and control of processing procedure for the
effectiveness of process in a year.
 Prepare **amount technical specification and economic factors relating to process &
product design objectives for effectiveness of process & product design in cyclic basis.
 Plan and implement **amount laboratory operations for the purpose of developing
material and fabrication procedures that meet cost, product specification, and
performance standards ongoing basis.
 Review and make recommendations **amount new product plans for material selection
based on design objectives, such as strength, weight, heat resistance, electrical
conductivity, and cost in a year.
 Review ** amount project plan the relative costs and benefits of potential actions to
choose the most appropriate one within a month.
 Prepares monthly periodic activity reports and the annual budget of the processes and
submits to the Engineering, Directorate Director thereby: Monitors progress against
budget and explains variances and Forecasts future personnel and equipment needs.
 Oversee fully implement EEU’s competency based performance management system to
increase the EEU’s Performance on going base.

6. CSMART Goal for Head, PROJECT CONSULTANCY AND SUPERVISION

 Prepare **amount formulation of project parameter and assign responsibilities to the


most capable employees and monitor the project team for the effectiveness of the project
in the project period.
 Approve **amount Project Proposal Prepared and estimated time, cost, labor, and
materials that are needed for distribution Projects to have extended & rehabilitated
network in the project period.
 Develop the ** amount of input for investment plan within a year to select and analyzes
the benefit of the investments.
 Approve ** amount report of Analysis of material and data, test conducted,
troubleshoot, performance, quality control and documentation created annul basis.
 Prepare, schedule, coordinate and monitor **amount assigned engineering project
supervision to create more effective and maintain the project's profitability in cost, time
and quality on going base.
 Create ** amount project management calendar for fulfilling each goal and objective to
accomplish the project in time within a budget year.
 Review **amount progressive report on distribution project meet electrical and
construction safety regulations to have continuous distribution network operation in the
project period.
 Approve **amount test supervision and conduction on raw materials or finished
products in order to ensure their quality within a year.
 Approve **amount feasibility studies prepared for new for new distribution projects and
estimating material, construction, and labor costs, and project time scales to extend
electric network within budget year.
 Design and direct **amount testing and control of processing procedure for the
effectiveness of project in a year.
 Review and initiate **amount the engineering task and the necessary corrective action to
have best result the project within budget year.
 Develop **amount project framework to measure the project's metric and data collection
in the project period.
 Review **amount field test method and methods for monitoring the quality of those test
to have effective evaluation procedure in the budget year.
 Review **amount report of project's compliance with the applicable codes, practices,
policies, performance standards, and specifications to have more efficient distribution
network within project period.
 Prepares monthly periodic activity reports and the annual budget of the processes and
submits to the Engineering, Directorate Director thereby: Monitors progress against
budget and explains variances and Forecasts future personnel and equipment needs.
 Oversee fully implement EEU’s competency based performance management system to
increase the EEU’s Performance on going base.

7. CSMART Goal for Head, CIVIL ENGINEERING

 Define and approve **amount detailed working plan to get more efficient outcome at
the end budget year.
 Approve **amount Civil engineering design and plan for modifications & expansion
to Sub transmission and the distribution System to accomplish civil works as per the
standard and quality requirement within a year.
 Approve ** amount Project Proposal Prepared for Civil activities for Sub transmission
Engineering (Civil), Distribution Engineering (Civil), Office Construction Maintenance
and any civil works in the physical year.
 Review **amount Established and developed systems, policies and procedures for
distribution project management and administration of contracts to improve the
efficiency ongoing basis.
 Approve ** amount updated the existing sub transmission and distribution design and
construction manual to improve design and construction outcome in the budget year.
 Prepare and Define effective project schedule and project implementation and
supervision plan in a week to timely accomplish of the project.
 Prepare & direct ** amount civil work construction plan and project execution and
control project performance in a budget year.
 Approve **amount integrated and coordinated civil design engineering services related
to sub transmission line, substation, distribution network and civil work construction
activities to get quality result in the budget year.
 Manage ** amount public tender and material return, repair and disposal in year to have
quality material.
 Manage **amount the performance of contractor and consultant against the planned
program of construction and report the reasons for any delay or alteration from the
planned program in the project period.
 Approve **amount Supervise and commission report of the sub transmission line and
distribution network and Civil work construction activities in the project period.
 Review **amount report of project's compliance with the applicable codes and legal
regulations, practices, policies, performance standards and procedures to maintain safe
and healthy work environment within project period.
 Approve ** amount consultancy service Based on contract agreement for sub
transmission project’s design; construction and civil works within project period.
 Develop monthly periodic activity reports and the annual budget of the processes and
submits to the Engineering, Directorate Director thereby: Monitors progress against
budget and explains variances and Forecasts future personnel and equipment needs.
 Oversee fully implement EEU’s competency based performance management system to
increase the EEU’s Performance on going base.
8. Distribution Planning and Design Electrical Engineer III
 Study ** amount design, standard, concept, method, procedure, specification or
construction method on the existing, revised or new to have efficient and effective
distribution network system ongoing basis.
 Provide ** amount plan and design standard to update and maintain for sub
transmission/ distribution system construction, operation and maintenance in the budget
year.
 Select **amount design criteria, recommends changes in design standards and ensures
documentation of approved design criteria in the budget year.
 Define, develop and Prepare **amount activity and project schedule, implementation
and supervision to effectiveness of the project within project period.
 Direct and control **amount project execution and performance to check the fulfillment
of standard and procedure in the project period.
 Select **amount design criteria, recommends changes in design standards and ensures
documentation of approved design criteria to improve the design criteria ongoing basis.
 Prepare and evaluate **amount specification and tender document of Sub Transmission
material /distribution/ and tool to have quality material in the budget year.
 Develop **amount strategic electrical plan by studying operational plans; studying
existing conditions; determining needs to accomplish operational plans; mapping
solutions; updating and modifying requirements and solutions; preparing cost estimates
and budgets in the budget year.
 Establish **amount distribution design standard data base to accomplish design quality
in the budget year.
 Prepare ** amount consultancy service report Based on contract agreement for sub
transmission and distribution project’s design and construction to insure works done
according the contract within project period.
 Evaluate and accept design and provides expertise to make recommendation and monitor
implementation to accomplish efficiently and effectively on going base.
 Participate in the teams work activities on work of staff engaged to improve the
performance of the team on going base.
 Determines the reliability and cost effectiveness of alternative design components and to
introduce new components to various user groups to awareness and get best option
regular basis.
 Prepares monthly periodic activity reports and the annual budget of the processes and
submits to the Head, DISTRIBUTION engineering thereby: Monitors progress against
budget and explains variances and Forecasts future personnel and equipment needs.
 Take part fully implement EEU’s competency based performance management system
to increase the EEU’s Performance on going base.

9.Distribution Planning and Design Electrical Engineer II

 Study ** amount design, standard, concept, method, procedure, specification or


construction method on the existing, revised or new to have efficient and effective
distribution network system ongoing basis.
 Provide ** amount plan and design standard to update and maintain for sub
transmission/ distribution system construction, operation and maintenance in the budget
year.
 Select **amount design criteria, recommends changes in design standards and ensures
documentation of approved design criteria in the budget year.
 Prepare **amount activity and project schedule, implementation and supervision to
effectiveness of the project within project period.
 Participate **amount project execution and performance report to check the fulfillment
of standard and procedure in the project period.
 Select **amount design criteria, recommends changes in design standards and ensures
documentation of approved design criteria to improve the design criteria ongoing basis.
 Prepare and evaluate **amount specification and tender document of Sub Transmission
material /distribution/ and tool to have quality material in the budget year.
 participate **amount strategic electrical plan by studying operational plans; studying
existing conditions; determining needs to accomplish operational plans; mapping
solutions; updating and modifying requirements and solutions; preparing cost estimates
and budgets in the budget year.
 Prepare **amount distribution design standard data base to accomplish design quality in
the budget year.
 Prepare ** amount consultancy service report Based on contract agreement for sub
transmission and distribution project’s design and construction to insure works done
according the contract within project period.
 Evaluate and accept design and provides expertise to make recommendation and monitor
implementation to accomplish efficiently and effectively on going base.
 Participate in the teams work activities on work of staff engaged to improve the
performance of the team on going base.
 Determines the reliability and cost effectiveness of alternative design components and to
introduce new components to various user groups to awareness and get best option
regular basis.
 Prepares monthly periodic activity reports and the annual budget of the processes and
submits to the Head, DISTRIBUTION engineering thereby: Monitors progress against
budget and explains variances and Forecasts future personnel and equipment needs.
 Take part fully implement EEU’s competency based performance management system
to increase the EEU’s Performance on going base.

10. Distribution Planning and Design Electrical Engineer I

 Perform the economic plan associated with Distribution strategy for better outcome in
beginning of budget year.
 Prepare **amount design criteria, recommends changes in design standards and ensures
documentation of approved design criteria in the budget year.
 Prepare **amount activity and project schedule, implementation and supervision to
effectiveness of the project within project period.
 Participate **amount project execution and performance report to check the fulfillment
of standard and procedure in the project period.
 Select **amount design criteria, recommends changes in design standards and ensures
documentation of approved design criteria to improve the design criteria ongoing basis.
 Prepare and evaluate **amount specification and tender document of Sub Transmission
material /distribution/ and tool to have quality material in the budget year.
 participate **amount strategic electrical plan by studying operational plans; studying
existing conditions; determining needs to accomplish operational plans; mapping
solutions; updating and modifying requirements and solutions; preparing cost estimates
and budgets in the budget year.
 Prepare **amount distribution design standard data base to accomplish design quality in
the budget year.
 participate ** amount consultancy service report Based on contract agreement for sub
transmission and distribution project’s design and construction to insure works done
according the contract within project period.
 Participate in the teams work activities on work of staff engaged to improve the
performance of the team on going base.
 Prepare the reliability and cost effectiveness of alternative design components and to
introduce new components to various user groups to awareness and get best option
regular basis.
 Prepares monthly periodic activity reports and the annual budget of the processes and
submits to the head, distribution engineering thereby: Monitors progress against budget
and explains variances and Forecasts future personnel and equipment needs.
 Take part fully implement EEU’s competency based performance management system
to increase the EEU’s Performance on going base.

11. Distribution Engineer Technician II


 Participate in all Distribution Operation Construction Team plan and strategies for
efficiency and effectiveness of the distribution planning & design at the beginning
budget year.
 Assists for the preparation of annual budget at the beginning of the year for all
Distribution Operation & Construction Team works to get petty cash, material and
logistics on time
 Participate and assist in the preparation of specification and evaluation tender document
for distribution materials and tools to get right quality of material and equipment regular
basis.
 Participate in all the development of standard, Studies and revise the existing for
distribution system construction, operation and maintenance to efficient and recommend
rehabilitation ongoing basis.
 Assist in the determining and the reliability of cost effectiveness of distribution lines to
be constructed to achieve the department goal in budget year.
 Prepare Plans for preventive maintenance and rehabilitation programs to minimize risk
and loss at the beginning of the year.
 Checks and controls the all distribution network construction works with the required
human and material resources to ensure the proper utilization of resources for operation
and construction activities ongoing basis.
 Follow-ups the timely supply of required all materials to distribution construction
project sites for effectiveness of the project ongoing basis.
 Assists commissioning the distribution network construction lines when it is completed
and for the preparation of project completion report for capitalization to assure the work
done according to contract agreement in regular basis.
 Prepares monthly periodic activity reports by Keeping and recording work related
information and documents submits to the head, distribution engineering thereby:
Monitors progress against budget and explains variances and Forecasts future personnel
and equipment needs.
 Take part fully implement EEU’s competency based performance management system
to increase the EEU’s Performance on going base.
12. Civil Works Engineer Technician II
 Participate in all Transmission, Substation and Distribution Civil Construction Team
plan and strategies for efficiency and effectiveness of the Civil Construction planning &
design at the beginning budget year.
 Participate and assist in the preparation of specification and evaluation tender document
for Civil Construction materials and tools to get right quality of material and equipment
regular basis.
 Perform according to the developed engineering standards, policies and procedures
relating to civil design of Transmission lines & substations to improve accuracy of the
design regular basis.
 Prepare engineering drawings and bill of quantities for projects undertaken to achieve
the department goal in budget year.
 Handles modification of the designing part of civil engineering installations of minor
magnitude and follows-up that the works are adhere to the design and specification for
effectiveness of the project ongoing basis.
 Handles systematic compilation of all engineering data for transmission lines,
substations & distributions for good reference in regular basis.
 Prepares narratives and statistical reports on technical engineering assignments.
 Prepares monthly periodic activity reports by using narratives and statistical reports on
technical engineering assignments submits to the head, distribution engineering thereby:
Monitors progress against budget and explains variances and Forecasts future personnel
and equipment needs.
 Take part fully implement EEU’s competency based performance management system
to increase the EEU’s Performance on going base.

13. Quality Engineer III


 Develop procedures for inspection and monitoring by using benchmark in all operations
that affect quality assurance issues to improve performance and all legal standards are
met of department works on going base.
 Supervising and guiding inspectors, technicians and other staff to improve performance
team group on going base.
 Assure the reliability and consistency of service by checking process and final output to
get qualified material & equipment on going base.
 Prepare report by appraise customers, requirement and make sure they are satisfied with
service delivery on going base.
 Prepare database records, statistical reviews and relevant documentation to keep reliably
reports periodically.
 Communicate and Active participant with internal department team to improve
performance in going basis and with external quality assurance offices during on –site
inspections to be confidential regular basis.
 Maintaining and executing all test cases in accordance with established standards and
formats for accurate testing status and get right quality goods ongoing basis.
 Identify and document defects and assist with classification, tracking retesting, and
resolution as required to decrease material abasement ongoing basis.
 Prepares monthly periodic activity reports and the annual budget of the processes and
submits to the Head, Quality Assurance/ Control & Field Quality Assurance: Monitors
progress against budget and explains variances and Forecasts future personnel and
equipment needs to know statues over all department performance.
 Take part fully implement EEU’s competency based performance management system
to increase the EEU’s Performance on going base.

14. Quality Engineer II


 Prepare procedures for inspection and monitoring by using benchmark in all operations
that affect quality assurance issues to improve performance and all legal standards are
met of department works on going base.
 Supervising inspectors, technicians and other staff to improve performance team group
on going base.
 Assure the reliability and consistency of service by checking process and final output to
get qualified material & equipment on going base.
 Prepare report by appraise customers, requirement and make sure they are satisfied with
service delivery on going base.
 Communicate and Active participant with internal department team to improve
performance in going basis and with external quality assurance offices during on –site
inspections to be confidential regular basis.
 Prepare database records, statistical reviews and relevant documentation to keep reliably
reports periodically.
 Maintaining and executing all test cases in accordance with established standards and
formats for accurate testing status and get right quality goods ongoing basis.
 Identify and document defects and assist with classification, tracking retesting, and
resolution as required to decrease material abasement ongoing basis.
 Prepares monthly periodic activity reports and the annual budget of the processes and
submits to the Head, Quality Assurance/ Control & Field Quality Assurance: Monitors
progress against budget and explains variances and Forecasts future personnel and
equipment needs to know statues over all department performance.
 Take part fully implement EEU’s competency based performance management system
to increase the EEU’s Performance on going base.

15. Quality Engineer I


 Participate in Preparation of procedures for inspection and monitoring by using
benchmark in all operations that affect quality assurance issues to improve performance
and all legal standards are met of department works on going base.
 Assure the reliability and consistency of service by checking process and final output to
get qualified material & equipment on going base.
 Prepare report by appraise customers, requirement and make sure they are satisfied with
service delivery on going base.
 Communicate and Active participant with internal department team to improve
performance in going basis and with external quality assurance offices during on –site
inspections to be confidential regular basis.
 Prepare database records, statistical reviews and relevant documentation to keep reliably
reports periodically.
 Participate in Maintaining and executing all test cases in accordance with established
standards and formats for accurate testing status and get right quality goods ongoing
basis.
 Identify and document defects and assist with classification, tracking retesting, and
resolution as required to decrease material abasement ongoing basis.
 Prepares monthly periodic activity reports and the annual budget of the processes and
submits to the Head, Quality Assurance/ Control & Field Quality Assurance: Monitors
progress against budget and explains variances and Forecasts future personnel and
equipment needs to know statues over all department performance.
 Take part fully implement EEU’s competency based performance management system
to increase the EEU’s Performance on going base.

16. Civil Design Engineer III


 Maintains and updates all systems, policies and procedures for project management and
administration of contracts to achieve project objective regular basis.
 Participates in the preparation of ** amount of contracts, commissioning and testing to
assure the effectiveness of the project in project period.
 Update recommend, get approved and distribute the existing sub transmission and
distribution design and construction manual for more awareness and performance
ongoing.
 Define activities; develop project schedule and Prepare project implementation and
supervision plan before project commencement for projects efficiency and effectiveness.
 Supervise and commission project execution, control project performance and follow up
the performance of contractors and consultants against the planned program of
construction and reports the reasons for any delay or alteration from the planned
program in project period.
 Evaluates tender documents and recommends the award of a contract in collaboration
with concerned work units to have right quality material ongoing basis.
 Evaluate and review ** amount civil works designs for generation, transmission,
substation, Distribution, buildings and structures and determine layouts to set standard
for specific project in budget year.
 Prepares monthly periodic activity reports and the annual budget of the processes and
submits to the concerned work unit thereby to monitors progress against budget and
explains variances and Forecasts future personnel and equipment needs.
 Take part fully implement EEU’s competency based performance management system
to increase the EEU’s Performance on going base.
17. Civil Design Engineer II (new)
 Participate in Maintaining and updating all systems, policies and procedures for project
management and administration of contracts to achieve project objective regular basis.
 Prepare of ** amount of contracts, commissioning and testing to assure the effectiveness
of the project in project period.
 Prepare, get approved and distribute the existing sub transmission and distribution
design and construction manual for more awareness and performance ongoing.
 Participate in Defining activities; prepare project schedule and take part project
implementation and supervision plan before project commencement for projects
efficiency and effectiveness.
 Prepare ** amount civil works designs for generation, transmission line, substation,
distribution network, buildings and structures and determine layouts to set standard for
specific project in budget year.
 Supervise and commission project execution, control project performance and follow-up
the performance of contractors and consultants against the planned program of
construction and reports the reasons for any delay or alteration from the planned
program in project period.
 Evaluates tender documents and recommends the award of a contract in collaboration
with concerned work units to have right quality material ongoing basis.
 Prepares monthly periodic activity reports and the annual budget of the processes and
submits to the concerned work unit thereby to monitors progress against budget and
explains variances and Forecasts future personnel and equipment needs.
 Take part fully implement EEU’s competency based performance management system
to increase the EEU’s Performance on going base.
18. Civil Design Engineer I
 Provide evaluation report whether projects are workable by assessing materials, costs
and time requirements to insure the project feasibility ongoing basis.
 Prepare Plan, design and manage construction project and Studies on the existing,
revised or new designs, standards, concepts, methods, procedures, specifications or
construction methods to achieve project objective regular basis.
 Assess and maintain the environmental impact and risks connected to projects to prevent
risk proactively ongoing basis.
 Prepare of ** amount of contracts, commissioning and testing to assure the effectiveness
of the project in project period.
 Prepare, get approved and distribute the existing sub transmission and distribution
design and construction manual for more awareness and performance ongoing basis.
 Prepare to updates and maintains sub transmission/ distribution plan and civil design
standards, Selects civil design criteria, recommends changes in design standards and
ensures documentation of approved design criteria to best project design before all
design preparation in regular basis.
 Prepare in Defining activities; prepare project schedule and take part project
implementation and supervision plan before project commencement for projects
efficiency and effectiveness.
 Prepare ** amount civil works designs for generation, transmission line, substation,
distribution network, buildings and structures and determine layouts to set standard for
specific project in budget year.
 Supervise and commission project execution, control project performance and follow-up
the performance of contractors and consultants against the planned program of
construction and reports the reasons for any delay or alteration from the planned
program in project period.
 Participate ** amount consultancy service report Based on contract agreement for sub
transmission and distribution project’s design and construction to insure works done
according the contract within project period.
 Prepare all bids for tenders, specifications and evaluates tender documents of civil
engineering in collaboration with concerned work units to have right quality material
ongoing basis.
 Prepares monthly periodic activity reports and the annual budget of the processes and
submits to the concerned work unit thereby to monitors progress against budget and
explains variances and Forecasts future personnel and equipment needs.
 Take part fully implement EEU’s competency based performance management system
to increase the EEU’s Performance on going base.

19.Draftsperson II

 Prepares technical drawings from charts and sketches in accordance with specific
standards for advanced civil, graphic, electrical and mechanical to simplify the work
ongoing basis.
 Takes site measurements and Assists in routine engineering calculation when necessary
to coordinate with drawings to make accurate regular basis.
 Ensures that all drawing instruments and equipment are properly handled and
maintained to get better drawing output ongoing basis.
 Ensure the availability of safety policies and procedures to all work unites to improve
awareness ongoing basis.
 Prepares monthly periodic activity reports and submits to the concerned work unit.
 Take part fully implement EEU’s competency based performance management system
to increase the EEU’s Performance on going base.

20. Draftsperson I

 Participate in preparing technical drawings from charts and sketches in accordance with
specific standards for advanced civil, graphic, electrical and mechanical to simplify the
work ongoing basis.
 Takes site measurements and Assists in routine engineering calculation when necessary
to coordinate with drawings to make accurate regular basis.
 Ensures that all drawing instruments and equipment are properly handled and
maintained to get better drawing output ongoing basis.
 Ensure the availability of safety policies and procedures to all work unites to improve
awareness ongoing basis.
 Prepares monthly periodic activity reports and submits to the concerned work unit.
 Take part fully implement EEU’s competency based performance management system
to increase the EEU’s Performance on going base.
21. Surveyor II
 Ensures and determines that maps and Arial photographs for areas identified as
prospective are collected, volumes and relative elevation differences by applying
photogrammetric techniques to assure the correct data ongoing basis.
 Designs site investigation program and outlines plan of action by taking into
consideration the environmental factors for the efficiency of the design ongoing basis.
 Carries out construction surveying on built structure and revises the survey of junior
surveyors for accuracy and determines value for accuracy of data ongoing.
 Supervises and gives on the job training to junior surveyors regularly and Prepares
reports on field and general activities monthly to improve performance and to give the
working status.
 Ensure the availability of safety policies and procedures to all work unites to improve
awareness ongoing basis.
 Prepares monthly periodic activity reports and submits to the concerned work unit.
 Take part fully implement EEU’s competency based performance management system
to increase the EEU’s Performance on going base.

22. Surveyor I

 Participate in Ensures and determines that maps and Arial photographs for areas
identified as prospective are collected, volumes and relative elevation differences by
applying photogrammetric techniques to assure the correct data ongoing basis.
 Participate in Designs site investigation program and outlines plan of action by taking
into consideration the environmental factors for the efficiency of the design ongoing
basis.
 Participate in construction surveying on built structure and revises and determines value
for accuracy of data ongoing basis.
 Prepares reports on field and general activities monthly to improve performance and to
give the working status.
 Ensure the availability of safety policies and procedures to all work unites to improve
awareness ongoing basis.
 Take part fully implement EEU’s competency based performance management system
to increase the EEU’s Performance on going base.

23. Manager, Design, Engineering and Supervision (Type I)

 Define and Formalize ** no. of Investment Alternatives to get cost effective and most
feasible investment with regard to standard and procedure in regular basis.
 Identify and Develop potential network risks and contingency/fail-over network systems
to provide effective technical solutions, mitigate risks and to ensure network
performance and customer service satisfaction at all times by communicate progress
against milestones, taking proactive remedial action where necessary.
 Develop all Project Management Plan with cost optimization in regular basis through
Define Project Requirements, Scope & Work Breakdown Structure and determine its
schedule in the project period.
 Develop all HR plan and Manage Authorizations & Request for purchase to relevant
authorities before the ** business days of the commencement of the project.
 Monitor construction execution & control performance through the project period for
taking remedial action where necessary.
 Approve all network recommend & design for new Connections > 3MVA to Loss
reduction and provide load efficiently in regular basis.
 Prepares monthly periodic activity reports and submits to the concerned work unit.
 Oversee and support fully implement EEU’s competency based performance
management system to increase the EEU’s Performance on going base.

24. Manager, Design, Engineering and Supervision (Type II)

 Define and Formalize ** no. of Investment Alternatives to get cost effective and most
feasible investment with regard to standard and procedure in regular basis.
 Identify and Develop potential network risks and contingency/fail-over network systems
to provide effective technical solutions, mitigate risks and to ensure network
performance and customer service satisfaction at all times by communicate progress
against milestones, taking proactive remedial action where necessary.
 Develop all Project Management Plan with cost optimization in regular basis through
Define Project Requirements, Scope & Work Breakdown Structure and determine its
schedule in the project period.
 Develop all HR plan and Manage Authorizations & Request for purchase to relevant
authorities before the ** business days of the commencement of the project.
 Monitor construction execution & control performance through the project period for
taking remedial action where necessary.
 Approve all network recommend & design for new Connections above 3MVA to Loss
reduction and provide load efficiently in regular basis.
 Prepares monthly periodic activity reports and submits to the concerned work unit.
 Oversee and support fully implements EEU’s competency based performance
management system to increase the EEU’s Performance on going base.