You are on page 1of 3

Title Area

Coal Handling sytem


ON THE JOB TRAINING (OJT)
Coal Crusher

Coal Crusher

Function
Coal Crusher functions as a stone crusher from 12mm to smaller,There are two
coal crushers, namely:

1. Coal Crusher A 2. Coal Crusher B

Preparations before running at location


 make sure no people and no work in coal crusher area
 check the condition of the motor and motor oil
 check safety support

Checking after running at location


make sure all equipment is turned off
Crusher start sequance
a. select windows crusher
b. select manual
c. inform to field operator
crusher is ready to start
d. click start
e. motor Indication change to
red
f. communication with field
operator that crusher
actually running

crusher stop sequance


a. select windows crusher
b. select manual
c. inform to field operator that
crusher is ready to stop
d. click stop
e. motor Indication change to
red
f. communication with field
operator that crusher
actually stop running
Trouble
 hammer crusher blunt
 the occurrence of clogging on the crusher wall

Trubel handling
1. Analyze the problem first
2. Take a photo of the problematic equipment
3. report the problematic equipment condition to the shift leader
4. make trouble memo (TM)

Date Create by Shift leader Section head

Friday, 5
November 2021
Rangga Pangestu

You might also like