Project :- Designed by:M. Abu Shady
Building :- Checked by:-M. Abu Shady
Element:- Date:- 31-Dec-21
Location:-
Input:
h = 400 mm fy = 420 MPa
bw = 1900 mm fc' = 45 MPa Normal weight concrete λ = 1
Clear cover cc = 40 mm fyt = 420 MPa
d = 352 mm Bearing Pad Details
av = 200 mm Points Load @ S spacing
af = 250 mm W = 200 mm
L = 250 mm
Vservice = 312 KN S = 665 mm Spacing between bearing pads
Vu = 502 KN c = 2400 mm Center of last bearing to ledge side edge distance.
Nuc = 100 KN Nuc min. = 0.2 Vu, Clause 11.8.3.4
𝑴_𝒖 = 𝑽_𝒖 𝒂_(𝒇 )+ 𝑵_𝒖𝒄 ("h−d" )= KN.m
130.3 Clause 11.8.3
av/d= 0.57 < 1, Design Corbel using Clause 11.8.3, 11.8.4 as per Clause 11.8.1
𝜙 = 0.75 Clause 11.8.3.1
1- Calculation of Primary tension reinforcement Asc
1.1- Calculation of shear-friction reinforcement Avf
𝑾_(𝒆𝒇𝒇 𝒇𝒓)=𝒎𝒊𝒏. 𝒐𝒇{█(𝑏_𝑤@𝑊+4𝑎_𝑣@𝑆@2𝑐)┤
= 1900 mm
= 1000 mm PCA Notes, p15-5
= 665 mm
= 4800 mm
∴ 𝑾_(𝒆𝒇𝒇 𝒇𝒓) = 665 mm PCA Notes, p15-5
𝒎𝒂𝒙)=𝒎𝒊𝒏. 𝒐𝒇{█(𝜙 𝟎.𝟐𝒇_𝒄^′ 𝑾_(𝒆𝒇𝒇 𝒇𝒓) 𝒅@𝜙(𝟑.𝟑+𝟎.𝟎𝟖𝒇_𝒄^′)𝑾_(𝒆𝒇𝒇 𝒇𝒓) 𝒅@𝜙KN
= 1580.0 𝟏𝟏𝑾_(𝒆𝒇𝒇 𝒇𝒓) 𝒅)┤
Clause 11.8.3.2.1
= 1211.4 KN Clause 11.8.3.2.1
= 1931.2 KN Clause 11.8.3.2.1
𝑨_𝒗𝒇=𝑽_𝒖/(𝜙 𝒇_𝒚𝒕 𝝁)
𝝁 = 1.4 Clause 11.6.4.3 = 1138 mm2 Clause 11.6.4.1
= 1003 mm2 Clause 11.8.5 ∴𝑨_𝑺𝒄= 1788 mm2 Use 9 T 16 /Weff moment
Use 2 Row T 16 Stirrups with 2 Legs OR combine with Asc as per PCA Notes, figure 15-10
Distribute Ah uniformly within (2/3)d adjacent to primary tension reinforcement "Asc", Clause 11.8.4 & Fig. R11.8.2
for small ledge height h, Asc+Ah could be added together and placed as top reinforcement as per PCA Notes, figure 15-10
3- Punching Shear check
𝒃_𝒐 = 𝒎𝒊𝒏. {█(𝑾+𝟐𝑳+𝟐𝒅_𝒇@𝑾+𝑳+𝒅_𝒇+𝒄−𝑾/𝟐)┤
=1404 mm PCA p15-6, for interior bearing load
=3102 mm PCA p15-6, for bearing load @ Ledge end
〖∴𝒃〗 _𝒐 =1404 mm
𝝓𝑽_𝒏=𝝓𝟎.𝟑𝟑𝝀√( 〖𝒇′〗 _𝒄 )
𝒃_(𝒐 ) 𝒅_𝒇= 821 KN >Vu, OK
for small ledge height h, Asc+Ah could be added together and placed as top
reinforcement as per PCA Notes, figure 15-10