Professional Documents
Culture Documents
As on:05.04.06
Name Project Designation Date of Grievance Status if in Target date of Action taken if completed
reporting Reported Assessed process completion
Prepared by: HR
Circulation to: VC
Frequency: Monthly
EMPLOYEE EXITS DURING THE MON
AND STATUS AS ON:30.0
1
2
3
4
5
6
*
Re
Prepared by: HR
sig
Circulation to: VC/ Projects
nat
Frequency:
ion Monthly
ma
de
dur
ing
the
mo
nth
but
acc
ept
anc
e
pe
ndi
ng,
sh
oul
d
als
o
for
m
a
par
EXITS DURING THE MONTH :APRIL 2006
AND STATUS AS ON:30.04.06
Total
7
VACANCY CHART PROJECT - WISE
As on: 05.04.06
SI Project Location Designation No. of Vacancy Status of Recruitment Target of Appointment Remarks
No. Positions since
Awaiting Awaiting Awaiting Short Awaiting Awaiting Awaiting issue Awaiting 10 20 30 45 60 90 > 90
Response
Action -listing Interview Selection of App. Letter joining days days days days days days days
7
JOB CONFIRMATION STATUS AS ON 21.01.06
Sl. Location Name Designation Date of Grade Reporting Authority H.O. Reporting Date of Confirmation Status
Joining Confirmation
No. Overdue Due within 1 Due more
month than 1
month
10
11
JOB CONFIRMATION STATUS AS ON 21.01.06
Sl. Location Name Designation Date of Grade Reporting Authority H.O. Reporting Date of Confirmation Status
Joining Confirmation
No. Overdue Due within 1 Due more
month than 1
month
Prepared by: HR
Circulation to: VC / Projects
Frequency: Monthly
CONTRACT RENEWAL STATUS AS ON 03.05.06
Sl. Location Name Designation Date of Grade Reporting H.O. Contract Confirmation Status
No. Joining Authority Reporting Renewal
Date Overdue Due within Due more
1 month than 1
1 month
Prepared by: HR
Circulation to: VC / Projects
Frequency: Monthly
Note: Appraisal report not recived from Contai Site
MIS FOR ITEMS NOR PROVIDED TO NEW JOINEE AS ON .........
Sl. No. Location Name Designation Department Date of Items not provided Target date of Providing
Joining although entitled as per the items
Checklist
Prepared by: HR
Circulation to: VC / Projects
Frequency: Monthly