SURVEY REPORT

for

….. STREET

SANTA ILOCOS SUR ROAD INVENTORY SURVEY

CE 145 PRINCIPLES OF TRANSPORTATION ENGINEERING


I. NAME

Santa Ilocos Sur Road Inventory

ROAD INVENTORY: A TRAFFIC STUDY

NAME OF ACTIVITY: ROAD INVENTORY: A TRAFFIC STUDY

Parts:

a. Title page

b. Preface

c. Dedication

d. Table of content ( with page number)


II. Introduction

brief background or rationale of the study on road Inventory. This may also include a brief history of the
study area and what are the reasons Why you are conducting such study.
III. Objective of the study
IV. Scope and limitation
V. Related literature

this refer to study/readings/articles that are related to the study being Conducted.
VI. Methodology

this refer to the procedure, materials, and statistical methods/formula use in the study ( if any), ETC.

The team has planned everything that needs to be done before doing the actual survey in order to
establish a more detailed procedure in conducting the inventory and also it provides the group a
baseline data that is needed in the assessing of the land uses of the site area investigated.

The team made use of the observation method in gathering data and information needed to answer the
objectives of the survey or investigation. Secondary data are also considered in order to backup the
information gathered.

The team facilitates the immediate completion of the investigation. All member of the survey team
observed on the links/ mid blocks, intersections and junctions of the road. The materials used in
conducting the road inventory are steel tape.measure,.

VII. Results and discussion.


Present table that describe the data gathered. Include textual presentations of the data
gathered.
The section presents the results and discussion of data gathered to answer the objectives of the
survey or investigation.

1. Present information relative to the study area ( e.g. 1. length of road, width, the presence of
sidewalks, the presence of temporary / permanent structures ( i.e. Building, electric post,
telephone facilities, terminal, etc) meaning the usage of the lot adjacent the road being
studied, etc. 2. The pavement condition such as the surface defects and other form of
pavement distresses)

Table 1. Inventory of Road Being Surveyed ( Santa Boulevard St.)


Name of Length of Existing Pavement & No. of Lane Road Side
Road Road (m) Pavement Condition Friction
Width (m)
Santa 243 m 10m Dual
Blvrd. carriageway

Table 1 revealed the present condition of Santa Boulevard St. which is the primary road surveyed by
the team.
2. The road conditions ( e.g. distress of the concrete pavement), also include the geometrics,
and traffic control devices such as signage’s, signals, pavement markings, etc. k. Appendices:
Used/accomplished table/forms during survey, documentations, etc.
Table 2. Inventory of Link/Mid-Block
Link/Mid Length of Existing Existing road Distance of REMARK/S
Block Link/Mid Adjacent markings & such road
Block Land Use other marking &
structure other
within structure
roadway within
roadway (m)
A
B
C
D

Table 3. Inventory of Junction/Intersection within the Road Being Surveyed Santa Boulevard St.)
Table 4. Inventory of Geometric Within Santa Boulevard St.

Profile
a. Author/s ( student)
b. Subject professor

Note: The report shall be submitted in PDF form at the google classroom on or before the DUE
Date. Take note you have to submit in the google classroom. The printed material/the
electronic copy in CD form shall be submitted when the new normal is okay before final
( Meaning when you can come to the University. Further, the electronic copy in CD and the hard
copy shall be considered as one ACTIVITY counted when the final grade be computed.