Potential Cause Verification Pla

Potential Cause Null Hypothesis Alternative Hypothesis

Picking time is longer


H0: µ pick time in 2nd Half Ha: µ pick time in 2nd Half
in the 2nd half of the
Example X = µ pick time in 1st half not = µ pick time in 1st half
shift than in the 1st
half.

X1

X2

X3

X4

X5

X6

X7

X8

X9

X10
Cause
l Cause Verification Plan
Verfication Attribute / Method / Test + Verified?
Data (Y) Variable Sampling Plan Results (Y/N)

2 Sample t test P = 0.00 Means are


30 picks measured from the 1st different, and the
Time to Pick
Variable 4 hours, and 30 picks from the mean in the last 4 Y
Orders
last 4 hours of the work period. hours was the
greatest
Output affect (Y): Mean Pick Time
Potential Cause (X): Pick times increase in the last 4 hours of the work periods

Test Plan Null & Alternative Hypothesis


Select at Random 30 samples in the
first 4 hours of the work period, and Ho: µ pick time in 2nd Half = µ pick
measure the pick time taken for time in 1st half
each.
Repeat for 30 samples in the last 4
hours of the work period. Ha: µ pick time in 2nd Half not = µ
pick time in 1st half

Statistical Conclusion Practical Conclusion


Pick time increases as the work
period progresses. Look for
potential solutions with the team to
reduce this effect as it is reducing
productivity.
Output affect (Y):
Potential Cause (X):

Test Plan Null & Alternative Hypothesis

Statistical Conclusion Practical Conclusion