Alexandria Pinon
Pacific Regency 4K
Robert L. Tang
Owner
Design Phases
4. Construction Phase
Deliverables per Phase
Submission of final
Final plans, elevations, plans for construction,
Initial Proposals of ceiling design, initial final cost estimate,
Supervision of site,
space planning, cost estimates of processing of needed
coordination for all
concept and color construction, work permits, schedule
parties needed, styling
schemes appliances, accessories of deliveries for
& finishes selection appliances &
accessories
Schematic Design Phase
COLOR
CONCEPT LAYOUT
SCHEME
Up to 3 revisions for the concepts, color scheme and final layout of entire space
In this phase, we will hire consultants (Architect, Electrical engr. & Master Plumber)
for the required plans and signature & seal. This is a fixed rate.
Contract Document & Coordination Phase
Once finals plans are submitted, major revisions would be subject to a
“Change Order” with a fixed fee of 2,000
During construction:
o Drafting of necessary adjustments in plan to resolve issues
o Review and approval of materials prior to application on site
o Final punch listing to ensure proper application of finishes, furniture etc.,