Proposal IDr.

Alexandria Pinon

Pacific Regency 4K
Robert L. Tang
Owner
Design Phases

1. Schematic Design Phase

2. Design Development Phase

3. Contract Document & Coordination Phase

4. Construction Phase
Deliverables per Phase

Schematic Design Design Development Contract Document & Construction


Phase Phase Coordination Phase Phase

Submission of final
Final plans, elevations, plans for construction,
Initial Proposals of ceiling design, initial final cost estimate,
Supervision of site,
space planning, cost estimates of processing of needed
coordination for all
concept and color construction, work permits, schedule
parties needed, styling
schemes appliances, accessories of deliveries for
& finishes selection appliances &
accessories
Schematic Design Phase

COLOR
CONCEPT LAYOUT
SCHEME

Up to 3 revisions for the concepts, color scheme and final layout of entire space

Items to be submitted to owner before moving to the next phase:


o Initial floor plans
o Initial furniture layout
o Concept deck & Mood Board
o Preliminary cost estimate
o Initial 3d perspectives
Design Development Phase
Back and forth planning and approval between owner and designer regarding:
o Finishes to be used
o Final design of cabinetry
o Fixtures (faucet, showerhead, water closet etc.)
o Appliances to be used
o Accessories to be used
o Final look of the space before construction PROPOSAL
REVISIONS/
SOURCING

Items to be submitted to owner before moving to the


next phase:
o Detailed plans & elevations APPROVAL
o Ceiling & Lighting plan
o Initial electrical layout
o Updated cost estimate
Contract Document & Coordination Phase
For submission to contractor & admin before construction, in A3 size:
o Floor plan
o Perspectives
o Floor tile layout
o Ceiling plan
o Elevations
o Shop drawings
o Furniture schedule
o Electrical Plans
o Plumbing Plans

In this phase, we will hire consultants (Architect, Electrical engr. & Master Plumber)
for the required plans and signature & seal. This is a fixed rate.
Contract Document & Coordination Phase
Once finals plans are submitted, major revisions would be subject to a
“Change Order” with a fixed fee of 2,000

Meeting with contractor discussing:


o Scope of Work
o Schedule of Construction
o Contract and Billing
o Construction Bond

Start of applying for work permits.


Construction Phase
o Periodic supervision of site
o Scheduling of delivery of owner’s furniture/appliances/accessories

Things to expect during construction:


o Contingencies for unforeseen additional work on unit

During construction:
o Drafting of necessary adjustments in plan to resolve issues
o Review and approval of materials prior to application on site
o Final punch listing to ensure proper application of finishes, furniture etc.,

Estimate Duration of Construction: 1 month


Fees
Lump-Sum minimum of 50,000 % DESIGN PHASE AMOUNT
Discount – 5,000
10% Acceptance Fee 4,500
Total Interior Design Fee: 45,000
20% Schematic Design Phase 9,000

35% Design Development Phase 15,750

20% Contract Document & Coordination 9,000


Phase
For meetings & sourcing:
15% Construction Phase 6,750
Professional Fee: 1,000
Food & Transportation: 500 Total: 45,000