You are on page 1of 1

Win Progress Co.

,Ltd(Pharkant Branch)
Engine Overhauling Check Sheet
Customer
D7E Cyliner Block
Machine Model Serial No
Disassembly Engine Model Serial No
Assembly Working hrs Date
Unit=mm
Piston cooling nozzle NO.1 NO.2 NO.3 NO.4 NO.5 NO.6 comment
Condition check (OK or Not OK)

1st 36.9 lbf-ft


Tighting torque for main bearing caps 2nd 60 degree
3rd 60 degree
STD Pl
Plane point
i t 1 point
i t2
A
1
and also in 2

B
A
e in 4 points)

2
B
STD=85.03 to 85.066 A
3
Diiameter(Measure in 2 point

1stOS=85.28 to
ring

B
85 316 2
85.316 2ndOS=85.53
dOS 85 53
Main Beari

p
plane , so measure

A
4 to 85.566
Max; Round B
Out=0.01mm A
5
(Ovality) B
A
6
B
A
7
B

Inlet Exhaust Unit pump


No Bore Tappet Bore Tappet Bore RollerTappet
Tappet, 1
Roller Condition 2
pp
tappet ( /
check(OK/N 3
annd OK) 4
Bore 5
6
No STD Limit Plane Point 1 Point 2
d also in 2

A
1 65 65.08
B
planees, so measure 4 pointss

A
Diameter(Meeasuring in2 points and

2 65 65.08
B
A
3 65 65.08
Cam B
shaft A
4 65 65.08
Bushing B
A
5 65 65.08
B
A
6 65 65.08
B
A
7 65 65.08
B

Engineer/Mechanic Sign_ _ _ _ _ _ _ _ _ _ _ _ _ Service Supervisior Sign_ _ __ _ _ _ _ _ _ _


Engineer/MechanicName_ _ _ _ _ _ _ _ _ _ _ _ _ Service Supervisior Name_ _ _ _ _ _ _ _ _ _

You might also like