Ltd. TSB-MTL-VCE-2013-May-25
TECHNICAL SERVICE
BULLETIN
Manufacturer Product Line Engine Model Page
VOLVO Excavator D7EAE2/D6EAE2
Component Group Model Series Date
EC210/EC290BLCprime 3-6-2013
Subject
To share conflux cutoff operation at 210B/290B prime
Failure/Problem
EC 210BPRIME, boom-up,Arm-in and Arm out use only 1-pump flow.
EC210BBRIME, boom-up,Arm-in and Arm –out use only 1-pump flow
At,EC290Bprime,
Only one solenoid is used for conflux cut off operation.A-4 solenoid is normally closed,when F-mode
operation ,VECU send power signal to A-4 solenoid .A-4 solenoid is open and pilot signal flow to center-by-
pass valve through dr1. Boom-up , Arm-In and Arm-out use only 1-pump flow.
Picture
Disclaimer:
This Technical Service Bulletin cannot guarantee the accuracy of all information.
Please confirm the information with an appropriate manual.
Win Progress Co.,
Ltd. TSB-MTL-VCE-2013-May-25
TECHNICAL SERVICE
BULLETIN
Manufacturer Product Line Engine Model Page
VOLVO Excavator D7EAE2/D6EAE2
Component Group Model Series Date
EC210/EC290BLCprime 3-6-2013
Remark
A-1 and A-2 solenoids are located in air cleaner room at EC210 bprime. these solenoids can not change
other solenoid e.g power boost, travel speed solenoid
Disclaimer:
This Technical Service Bulletin cannot guarantee the accuracy of all information.
Please confirm the information with an appropriate manual.
Win Progress Co.,
Ltd. TSB-MTL-VCE-2013-May-25
TECHNICAL SERVICE
BULLETIN
Manufacturer Product Line Engine Model Page
VOLVO Excavator D7EAE2/D6EAE2
Component Group Model Series Date
EC210/EC290BLCprime 3-6-2013
A-4 solenoid is located in pump room at EC 290 Bprime. This solenoid can change other solenoids.
Disclaimer:
This Technical Service Bulletin cannot guarantee the accuracy of all information.
Please confirm the information with an appropriate manual.