CONSTRUCTION OF FOUR LANE BRIDGE FROM DHUBRI TO PHULBARI OVER
BRAHMAPUTRA RIVER Format No.: L&T/DPBP/QF 07 Rev 1, Rev Date: 30.07.2021 Client : National Highways & Infrastructure Development Corporation Limited (NHIDCL) Authority Engineer : AECOM Asia Company Limited In Association with PADECO Co.Ltd EPC Contractor : Larsen & Toubro Ltd.
CONCRETE DELIVERY SHEET
TRANSIT MIXER DELIVERY CHALLAN Plant Location Date Transit Mixer No. Time of Despatch Concrete Grade Location of Pour Structure Details Slump at batching plant Mix. Temperature at BP Batch Start Time Batching Finish Time Quantity (Cum) Cumulative Quantity (Cum) Remarks:
FOR L&T FOR CLIENT/AE
LARSEN & TOUBRO LIMITED
CONSTRUCTION OF FOUR LANE BRIDGE FROM DHUBRI TO PHULBARI OVER BRAHMAPUTRA RIVER Format No.: L&T/DPBP/QF 07 Rev 1, Rev Date: 30.07.2021 Client : National Highways & Infrastructure Development Corporation Limited (NHIDCL) Authority Engineer : AECOM Asia Company Limited In Association with PADECO Co.Ltd EPC Contractor : Larsen & Toubro Ltd.
CONCRETE DELIVERY SHEET
TRANSIT MIXER DELIVERY CHALLAN Plant Location Date Transit Mixer No. Time of Despatch Concrete Grade Location of Pour Structure Details Slump at batching plant Mix. Temperature at BP Batch Start Time Batching Finish Time Quantity (Cum) Cumulative Quantity (Cum) Remarks: