Customer:
Customer P.O.:
Date:
Exciter
Project Mgr. Approved:
Casing -QA-ITP-001
Witness Point (W): A Witness Point is defined as an inspection or test that FLS and/or its customers plan to attend. Suppliers are required to notify FLS Quality and / or Project Managers via email of upcoming witness
points within a minimum of the following number of BUSINESS DAYS: (FLS and /or its customers may elect to waive witness of inspections and / or tests.) 10
Top Cover -QA-ITP-002 BUSINESS DAYS
Hold Point (H): A Hold Point is defined as a critical point at which manufacturing, inspection and testing may not proceed without the attendance, or prior written agreement, of FLS and / or it customers. Hold points
Shafts -QA-ITP-003 that are bypassed due to failure of the supplier to provide proper notification shall be reported to FLS for resolution. Suppliers are required to notify FLS Quality and / or Project Managers via email of upcoming hold
points within a minimum of the following number of BUSINESS DAYS:
10
Gears -QA-ITP-004
Inspection and expediting activities may be carried out by FLSmidth customers, as well as representatives of higher level organizations within our customers’ supply chain. This section shall establish and communicate clear guidelines for protocol,
including introduction of participants, establishment of lines of communications, and types of information exchange needed to ensure the efficient and effective execution of supplier surveillance activities.
Approved IFC
IFC Drawings issued to supplier are correct
IFC Drawing
IFC Drawings match Drawing register
1.2 Drawing Revisions
numbers and revision
Purchase order
Purchase order with updated
revisions
(3) Casting
Signed ITP
Casing is compliant to FLS acceptance
3.1 Casting
criteria.
IFC Drawing / P775 or P774 IFC Drawing / P775 or P774 Signed IFC W
Drawings
(4) Machining
Signed IFC
4.1 Surface Finish Surface finish as per IFC drawing. IFC Drawing IFC Drawing
Drawing/s
DR
1000725109
1000725109
9.2 MDR Documentation Supplier provided MDR documentation Purchase Order / Supplier ITP Signed off MDR Supplier Final MDR DR
Notes:
1: FLSmidth at its discretion has the right to accept supplier Quality forms for any inspection activities provided that they are either an equivalent or meet a higher standard than what is outlined in standard FLSmidth's Checklists or Forms.
revisions
(3) Casting
Signed ITP
Casing is compliant to FLS acceptance
3.1 Casting
criteria.
IFC Drawing / P775 or P774 IFC Drawing / P775 or P774 Signed IFC W
Drawings
(4) Machining
Signed IFC
4.1 Surface Finish Surface finish as per IFC drawing. IFC Drawing IFC Drawing
Drawing/s
DR
1000725283
1000725283
9.2 MDR Documentation Supplier provided MDR documentation Purchase Order / Supplier ITP Signed off MDR Supplier Final MDR DR
Notes:
1: FLSmidth at its discretion has the right to accept supplier Quality forms for any inspection activities provided that they are either an equivalent or meet a higher standard than what is outlined in standard FLSmidth's Checklists or Forms.
revisions
6.2 MDR Documentation Supplier provided MDR documentation Purchase Order / Supplier ITP Signed off MDR Supplier Final MDR DR
Notes:
1: FLSmidth at its discretion has the right to accept supplier Quality forms for any inspection activities provided that they are either an equivalent or meet a higher standard than what is outlined in standard FLSmidth's Checklists or Forms.
revisions
6.2 MDR Documentation Supplier provided MDR documentation Purchase Order / Supplier ITP Signed off MDR Supplier Final MDR DR
Notes:
1: FLSmidth at its discretion has the right to accept supplier Quality forms for any inspection activities provided that they are either an equivalent or meet a higher standard than what is outlined in standard FLSmidth's Checklists or Forms.
revisions
(3) Casting
Signed ITP
Casing is compliant to FLS acceptance
3.1 Casting
criteria.
IFC Drawing / P775 or P774 IFC Drawing / P775 or P774 Signed IFC W
Drawings
(5) Machining
Signed IFC
4.1 Surface Finish Surface finish as per IFC drawing. IFC Drawing IFC Drawing
Drawing/s
W
1000725280
Form F82541SLC, Rev 1 Page 12 of 37
FLSmidth Pty Ltd
67 Randle Road • Pinkenba, Qld 4008 • Australia
Tel +61 7 3121 8453
www.flsmidth.com
1000725280
12.2 MDR Documentation Supplier provided MDR documentation Purchase Order / Supplier ITP Signed off MDR Supplier Final MDR DR
Notes:
1: FLSmidth at its discretion has the right to accept supplier Quality forms for any inspection activities provided that they are either an equivalent or meet a higher standard than what is outlined in standard FLSmidth's Checklists or Forms.
Approved IFC
IFC Drawings issued to fabricator are IFC Drawing IFC Drawings match Drawing register
1.1 Drawing Revisions
correct numbers and revision
Purchase order
Purchase order with updated
revisions
(3) Machining
Signed IFC
3.1 Surface Finish Surface finish as per IFC drawing. IFC Drawing IFC Drawing
Drawing/s
W
1000725281
Paint Specification
Parts are undercoated as per Paint
5.2 Surface Treatment specifications IFC Drawings / 1000511047 Document Paint Reports DR
FLS W 86 AUS
6.2 MDR Documentation Supplier provided MDR documentation Purchase Order / Supplier ITP Signed off MDR Supplier Final MDR DR
Notes:
1: FLSmidth at its discretion has the right to accept supplier Quality forms for any inspection activities provided that they are either an equivalent or meet a higher standard than what is outlined in standard FLSmidth's Checklists or Forms.
Approved IFC
IFC Drawings issued to fabricator are IFC Drawing IFC Drawings match Drawing register
1.1 Drawing Revisions
correct numbers and revision
Purchase order
Purchase order with updated
revisions
(3) Machining
Signed IFC
3.1 Surface Finish Surface finish as per IFC drawing. IFC Drawing IFC Drawing
Drawing/s
W
1000725281
6.2 MDR Documentation Supplier provided MDR documentation Purchase Order / Supplier ITP Signed off MDR Supplier Final MDR DR
Notes:
1: FLSmidth at its discretion has the right to accept supplier Quality forms for any inspection activities provided that they are either an equivalent or meet a higher standard than what is outlined in standard FLSmidth's Checklists or Forms.
Approved IFC
IFC Drawings issued to fabricator are IFC Drawing IFC Drawings match Drawing register
1.1 Drawing Revisions
correct numbers and revision
Purchase order
Purchase order with updated
revisions
6.2 MDR Documentation Supplier provided MDR documentation Purchase Order / Supplier ITP Signed off MDR Supplier Final MDR DR
Notes:
1: FLSmidth at its discretion has the right to accept supplier Quality forms for any inspection activities provided that they are either an equivalent or meet a higher standard than what is outlined in standard FLSmidth's Checklists or Forms.
Submit Welder Qualifications Test (WQT) AWS D1.1; 2015 / Approved WQT
1.3 Welder Qualifications and Register AWS D1.1; 2015 / 1000531489 1000531489 Qualifications
DR
Approved IFC
IFC Drawings issued to fabricator are
IFC Drawing
IFC Drawings match Drawing register
1.4 Drawing Revisions
correct numbers and revision
Purchase order
Purchase order with updated
revisions
achieved.
(4) Welding
Welding to be performed by qualified AWS D1.1; 2015 / Approved WQT &
4.1 Welder Qualifications
welder in accordance with approved WPS
AWS D1.1; 2015 / 1000531489
1000531489 WPS
DR
6.2 NDT NDT to be conducted Post PWHT 1000531489 1000531489 Signed ITP DR
(7) PWHT
Signed
9.2 Hole Checks All holes to have 1mm x 45degree chamfer 1000531489 1000531489 ITP/Supplier Check W
sheet
Signed Release
12.2 Release Certificate Inspection Release Certificate to be issued. Certificate of Conformance Certificate of Conformance
Certificate
DR
Fabricator Final
12.3 MDR Documentation Fabricator provided MDR documentation Purchase Order / Fabricator ITP Signed off MDR
MDR
DR
(13) Packaging
Form F82541SLC, Rev 1 Page 26 of 37
FLSmidth Pty Ltd
67 Randle Road • Pinkenba, Qld 4008 • Australia
Tel +61 7 3121 8453
www.flsmidth.com
Notes:
1: FLSmidth at its discretion has the right to accept supplier Quality forms for any inspection activities provided that they are either an equivalent or meet a higher standard than what is outlined in standard FLSmidth's Checklists or Forms.
(1) Documentation
Surface preparation shall be per greater IFC Drawings
requirement of FLS and manufacturers
1.1 Surface Preparation
standard requirements, and applicable
1000511047
IFC Drawings 1000725109 DR
specification. (AS APPLICABLE)
Paint Specification
Parts are undercoated as per Paint
1.3 Surface Treatment specifications IFC Drawings / 1000511047 Document
FLS W 86 AUS
Paint Reports DR
Notes:
1: FLSmidth at its discretion has the right to accept supplier Quality forms for any inspection activities provided that they are either an equivalent or meet a higher standard than what is outlined in standard FLSmidth's Checklists or Forms.
Review and confirm the FLSmidth job FLS Engineering Drawings FLS Engineering Drawings Signed Job
1.2 Job Traveller traveller is complete and correct and Specifications, and Specifications,
Traveller
W
FLS Job Traveller FLS Job Traveller
(2) Assembly
Signed Assembly
FLS Engineering Drawings Checklist
2.1 Checks during Assembly Refer to Assembly Checklist and Specifications 1000727306
Signed Exciter Test
W
Form 1000704479
Notes:
1: FLSmidth at its discretion has the right to accept supplier Quality forms for any inspection activities provided that they are either an equivalent or meet a higher standard than what is outlined in standard FLSmidth's Checklists or Forms.
Verify that the final exciter assembly FLS Engineering Drawings Signed Job
1.1 Exciter Assembly checklist is completed and is in accordance and Specifications - Traveller or Signed DR
with FLS drawings and specifications.
1000726146
(3) Testing/Verification
Conduct Run test and vibration test as per FLS Engineering Drawings Signed Exciter
3.1 Run Test WS3, LE/LSK Exciter Testing (1000703911, and Specifications P 3507
Testing Form
DR
1000703910 ) 1000703911, 1000703910
Notes:
1: FLSmidth at its discretion has the right to accept supplier Quality forms for any inspection activities provided that they are either an equivalent or meet a higher standard than what is outlined in standard FLSmidth's Checklists or Forms.
(1) Inspection
Verify that the final Inspection checklist is FLS Engineering Drawings FLS Engineering Drawings
1.1 Visual Inspection completed and is in accordance with FLS
drawings and specifications.
and Specifications and Specifications DR
Any NCRs have been recorded into the FLS Engineering Drawings
1.3 Non-Conformance Reports system and Specifications NCR Records W
Notes:
1: FLSmidth at its discretion has the right to accept supplier Quality forms for any inspection activities provided that they are either an equivalent or meet a higher standard than what is outlined in standard FLSmidth's Checklists or Forms.
Notes:
1: FLSmidth at its discretion has the right to accept supplier Quality forms for any inspection activities provided that they are either an equivalent or meet a higher standard than what is outlined in standard FLSmidth's Checklists or Forms.
1000727313
1000727306
1000726147
1000726146
1000725283 -
1000725282 -
1000725281 -
1000725280 -
1000725129 -
1000725109 -
1000704479 F3193
1000703911
1000683278 QSE SOP
1000511047 7149, FLS
P 817
AUS
QC Checking of Painted components
Correct Handling and Storage of Screen Components
Correct Handling and Storage of Screen Components
Guide to theCriteria
Acceptance Application of Protective
of LSK/LE Coatings
Exciter S.G. on Exciters
Iron Casting by
Mechanical and Ultrasonic
Vibration Acceptance Testing
Testing of Geared Exciters
Project Engineering Risk Review
Acceptance Criteria of LSK/LE Exciter S.G. Iron Casting by Visual Inspection
Exciter Test – Pre-Start Checklist
Enovia
Enovia
Enovia
Enovia
Enovia
Enovia
Enovia
Enovia
Enovia
Australian Management System