MEREKABENTUK, MEMBINA DAN MENYIAPKAN PEMBINAAN 2 TINGKAT

BANGUNAN PENCAWANG PEMBAHAGIAN UTAMA (PPU) 33/11KV KUALA


TERENGGANU DI DALAM PMU KUALA TERENGGANU, TERENGGANU DARUL
IMAN UNTUK TETUAN TENAGA NASIONAL BERHAD

UNDERGROUND UTILITIES MAPPING AND SITE INVESTIGATION WORKS AT PMU


KUALA TERENGGANU
LOCATION OF LAND SURVEY, U-MAP AND SOIL
INVESTIGATION

PROPOSED PPU 33 KV BUILDING


AREA
PMU KUALA TERENGGANU LAYOUT AREA
ACTUAL SITE CONDITION

• PPU 33KV BUILDING AREA


• CABLE TRENCHES PASSAGE
• GUARD HOUSE AREA
LAND SURVEY(SITE SURVEY)

• The Land Survey was carried out in order to provide general ground elevation
information, existing structure, roads, dimensions and others relevant
information on surface features.
• Drainage system also surveyed to give information on invert levels, watercourse
and sump, etc. Survey points were taken by using assumed coordinates.
• Later, all information gathered is translated into survey drawing to give depiction
of underground utility map at site.
UNDERGROUND UTILITIES MAPPING AT PPU 33KV
PROPOSED AREA AND NEARBY AREA.

a)Utilities detected and marked on the ground,


b) Mapping & surveying using Total Station & GPS.
(onsite work)
c) Post processing direct information download.
d) Charting of information and field verification.
e) Production and quality control (DRAWING)
UTILITIES MAPPING RESULT

LAYOUT FOR PROPOSED BUILDING LOCATION


ONSITE ACTUAL VIEW
UNDERGROUND UTILITIES MAPPING AT PPU 33KV PROPOSED
AREA AND NEARBY AREA.
PROPOSED BUILDING
LOCATION

NO UTILITIES DETECTED IN THE


PROPOSED BUILDING VICINITY
ONSITE LAYOUT (BUILDING PERIMETER)

VIEW B
VIEW A

VIEW C VIEW D
VIEW A (LEFT HANDSIDE)

VIEW A (RIGHT HANDSIDE)


VIEW B (LEFT HANDSIDE)

VIEW B (RIGHT HANDSIDE)


VIEW C (LEFT HANDSIDE)

VIEW C (RIGHT HANDSIDE)


VIEW D (LEFT HANDSIDE)

VIEW D (RIGHT HANDSIDE)


ABOVE GROUND UTILITIES BESIDE
PROPOSED BUILDING LOCATION
SOIL INVESTIGATION
• Soil investigation will be conduct after Site survey and
Utilities mapping are done.
• Site Investigation required 1 number of borehole and 5
numbers of mackintosh probes to be done for study and
design proposes as clearly show in the layout plan
• Bore Hole works will be conduct within 3 days onsite
work
• Proba mackintosh will be conduct within 1 days onsite
works
PROPOSED
LAYOUT PLAN
FOR BORE HOLE
AND PROBA
MACKINTOSH
ACCESS TO SITE LOCATION

Using Main road inside PMU compound


Main access road for transport
5 meter 3.7 meter
Clearance distance
between proposed building
to nearest utilites