You are on page 1of 29

Hydraulic System

* R220LC-9S
* R300LC-9S

HYUNDAI HEANY INDUSTRIES CO. LTD.,

-1- HHI Training Center


Ⅰ. Main Pump
Pi1=Neg. Control
Pm1=Flow Cut Off

Regulator 1

Regulator 2

Pi2=Neg. Control

Pm2=Flow Cut Off

EPPR Pressure

EPPR Valve 35 bar

P1 Front P2 Rear Pilot Pump


-2- HHI Training Center
1. Hydraulic circuit

Pi1 Pi2
PS PS

Horsepower
Control Function

Flow Control
Function

PS

ATT’ Flow Control EPPR V/V

-3- HHI Training Center


1-1. Pump Operation

Pi1 P1 P2 Pi2

1) P1,P2 : Main Pump

2) Pi1,Pi2 : Negative
control Relief

3) ATT’ Flow Control

4) Psv : EPPR V/V

P1 P2

-4- HHI Training Center


Ⅱ. Main Control Valve
1. Check Valve Position

Ck2

Pb21
Dr1

V4

-5- HHI Training Center


Check Valve Position

V3

-6- HHI Training Center


2. Boom up Operation R220LC-9S

BK
Boom Up has priority over
swing/bucket operation
- swing logic v/v 버켓감속

- bucket-in stroke limiter

붐2

P1 P2

-7- HHI Training Center


3. Boom Priority Function (Swing Logic Valve )
When Boom up & Swing are operated simultaneously, it increases Boom up speed. The swing logic valve does not work
in single swing operation.

Manual : Boom up speed depends on the speed level you select


Auto : Boom up speed is automatically adjusted according to the pilot pressures
of boom up & swing.

Boom1
spool

Swing priority
Boom priority EPPR valve Boom 2

Swing Logic
P2

-8- HHI Training Center


3-1. Electric Circuit for Boom Priority

BOOM
MCU
XAb1 XAb2 CN 53-9
Boom Priority EPPR +
CN 53-19
Boom Priority EPPR -
CN 51-2
BATT’ POWER 24V

CN 52-23
BOOM UP P03
PRESSURE
CN 51-5 (MCV)
GND. PRESSURE

CN 52-24
SWING PRESSURE
XBs XAs
SWING
Psp


P3

-9- HHI Training Center


3-2. Swing Logic valve Operation
To/From cylinder

To tank
Swing spool

P03
Bypass passage P2

Swing
spool P2 bypass passage
P2 parallel passage

From boom priority EPPR v/v

- 10 - HHI Training Center


4. Boom-2 Spool, Swing Priority Spool

When swing is operated, the pilot pressure is applied to “Pc3” and the pump flow is supplied to the swing motor
preferentially

When boom up is operated, the pilot pressure is applied to “Pa2” and Boom flow confluence is performed.

Pc3

Pa2

Swing
motor

P2

- 11 - HHI Training Center


4-1. Boom-2 Spool & Swing Priority Spool Operation

Boom summation passage

P1

Swing priority spool

Arm2 spool

Swing pilot Boom up


pressure Pilot pressure

Boom2 sppol
P2

P2 parallel passage (to arm1, option P2 parallel passage(from swing side)


spool)

P2

- 12 - HHI Training Center


5. Boom Down Operation

When boom down is operated, the pressure in the return line can be higher than that of supply line and this allows
the make-up function by pushing the check valve.

P1 P2

- 13 - HHI Training Center


5-1. Make-up Function in Boom 1 Spool
Boom moves down fast

P1

Boom down
Pilot pressure

P1

Boom down
Pilot pressure

Check valve

- 14 - HHI Training Center


6. Bucket-in Operation

● CK2

● Pa5
Pcb ●

- 15 - HHI Training Center


6-1. Bucket-in Confluence

When bucket in is operated, the pilot pressure is


applied to center bypass v/v through port “PCB”,
then P2 flow is summated with P1 flow.
Pcb

P2

Negative control v/v

Pcb

Center bypass v/v


Bucket summation passage

- 16 - HHI Training Center


7. Boom Priority Function : Bucket Stroke Limiter

BK stroke
During the combined operation of boom-up and bucket-in, limiter
boom-up pilot pressure moves the bucket spool to half stroke, BK
not full stroke.
②P2
BM up
Flow to bucket cylinder is reduced and P2 pump oil is supplied pilot
to boom cylinder preferentially.

BM1

①P1

Boom up pilot
(Pb5)
Bucket-in
pilot
Stroke limiter spool

- 17 - HHI Training Center


8. Arm-in Operation

BK

버켓감속

(암재생해제sol)

AM1

선회우선

AM2

P1 P2

- 18 - HHI Training Center


9. Arm Regeneration
9-1. Arm Regeneration Operation
Since Arm regeneration spool blocks return line,
return oil opens check valve and flows to supply
line.

(Low pressure)

Arm-in

Arm Regeneration

Arm-in

- 19 - HHI Training Center


9-2. ARM Regenration completion
Arm regeneration would be finished
when the angle of ARM IN operation is over 90˚

Arm In flow

Arm-in

ARM Regeneration

Arm-in

- 20 - HHI Training Center


9-3. Arm Regeneration Cut

ON
(Low pressure)

ARM In flow

Arm-in

ARM Regeneration

Arm-in

- 21 - HHI Training Center


10. Optional Attachment
10-1. Breaker Mode

At breaker mode, CPU allows the current to ATT’ Flow Control EPPR V/V to reduce the oil flow up to 7 Step.

Max 7 step, reduced 10 lpm each step

- 22 - HHI Training Center


10-2. Crusher Mode

At crusher mode, CPU will send the current to ATT’ Flow Control EPPR V/V and reduces the delivered flow to
maximum 4 step.

210 bar → 280 bar

Max 4 step, reduced 20 lpm each step

- 23 - HHI Training Center


10-3. Option Circuit
(Breaker/Crusher) 210 bar → 280 bar

P2



P1

① ② ③

① Option Att’ Safety sol.


⑤ ④
② Option Att’ pressure sol.
③ Option Att’ conflux sol.
④ Option Att’ flow control v/v
⑤ Safety sol.
P3 ①
⑥ Pilot selector v/v

⑦ Option conflux ON/OFF v/v

⑧ 2-Stage option relief v/v ④

- 24 - HHI Training Center


10-4. Breaker Circuit

When selecting ‘Breaker’ mode and


turning on breaker sw (on RH RCV),
Breaker sol is activated and MCU
sends the current to breaker EPPR
valve.
P2

Breaker sol

Att’ flow control v/v

Safety sol
P3

- 25 - HHI Training Center


10-5. Option Confluence On/Off Valve

If the operator selects ‘crusher’ mode on the cluster, the attachment


conflux solenoid will be activated. So, pilot pressure affects “P05” and
1P, 2P will be summated.

P05
Option Confluence Pilot Port

P1 parallel line P05

- 26 - HHI Training Center


10-6. 2-Stage Option Relief Valve Structure

- 27 - HHI Training Center


11. Straight Travel Valve

- 28 - HHI Training Center


11-1. Circuit for straight travel function

BK

work

X X

Swing parking
TL Brake release
TR Pilot pressure

travel
(P3)

P1 P2

Check v/v

● ●
● ●
● Orifice

P2 P1

- 29 - HHI Training Center