Professional Documents
Culture Documents
9S Exca - Hyd p29
9S Exca - Hyd p29
* R220LC-9S
* R300LC-9S
Regulator 1
Regulator 2
Pi2=Neg. Control
EPPR Pressure
Pi1 Pi2
PS PS
Horsepower
Control Function
Flow Control
Function
PS
Pi1 P1 P2 Pi2
2) Pi1,Pi2 : Negative
control Relief
P1 P2
Ck2
Pb21
Dr1
V4
V3
BK
Boom Up has priority over
swing/bucket operation
- swing logic v/v 버켓감속
붐2
P1 P2
Boom1
spool
Swing priority
Boom priority EPPR valve Boom 2
Swing Logic
P2
BOOM
MCU
XAb1 XAb2 CN 53-9
Boom Priority EPPR +
CN 53-19
Boom Priority EPPR -
CN 51-2
BATT’ POWER 24V
CN 52-23
BOOM UP P03
PRESSURE
CN 51-5 (MCV)
GND. PRESSURE
CN 52-24
SWING PRESSURE
XBs XAs
SWING
Psp
▲
P3
To tank
Swing spool
P03
Bypass passage P2
Swing
spool P2 bypass passage
P2 parallel passage
When swing is operated, the pilot pressure is applied to “Pc3” and the pump flow is supplied to the swing motor
preferentially
When boom up is operated, the pilot pressure is applied to “Pa2” and Boom flow confluence is performed.
Pc3
Pa2
Swing
motor
P2
P1
Arm2 spool
Boom2 sppol
P2
P2
When boom down is operated, the pressure in the return line can be higher than that of supply line and this allows
the make-up function by pushing the check valve.
P1 P2
P1
Boom down
Pilot pressure
P1
Boom down
Pilot pressure
Check valve
● CK2
● Pa5
Pcb ●
P2
Pcb
BK stroke
During the combined operation of boom-up and bucket-in, limiter
boom-up pilot pressure moves the bucket spool to half stroke, BK
not full stroke.
②P2
BM up
Flow to bucket cylinder is reduced and P2 pump oil is supplied pilot
to boom cylinder preferentially.
BM1
①P1
Boom up pilot
(Pb5)
Bucket-in
pilot
Stroke limiter spool
BK
버켓감속
(암재생해제sol)
AM1
선회우선
AM2
P1 P2
(Low pressure)
Arm-in
Arm Regeneration
Arm-in
Arm In flow
Arm-in
ARM Regeneration
Arm-in
ON
(Low pressure)
ARM In flow
Arm-in
ARM Regeneration
Arm-in
At breaker mode, CPU allows the current to ATT’ Flow Control EPPR V/V to reduce the oil flow up to 7 Step.
At crusher mode, CPU will send the current to ATT’ Flow Control EPPR V/V and reduces the delivered flow to
maximum 4 step.
P2
⑦
⑥
P1
① ② ③
Breaker sol
Safety sol
P3
P05
Option Confluence Pilot Port
BK
work
X X
Swing parking
TL Brake release
TR Pilot pressure
travel
(P3)
P1 P2
Check v/v
● ●
● ●
● Orifice
P2 P1