HABITABLE ROOM

Patio into habitable room (Living space) habitable room (Bedroom) habitable room
EXTERNAL WALL

Outer wall of a building which can be an adjoining wall of another building and it’s
towards the outer open space of any building. It has to be a load bearing
wall. It includes all elevation walls
Materials Used

Outdoor 3D wooden tiles


Wall tile with texture

Brick Tiles Stone Wall


Passage/channel to move EXIT
out from the building to
street or open space of
safety

Compact design fire exit door

Hospital Wooden exit door Movie hall exit door


FIRE LIFT
Lift that is
often
provided
within a tall
building,
complex
building or a
building with
deep
basement.
The purpose
is to provide
a facility to
assist fire
fighters to
move with
ease
vertically
through a
building
PLINTH
PLINTH

The portion of a
structure between
the surface of the
surrounding wall or
surface of a floor
immediately above
the ground
FOUNDATION

Foundation is the building block/base of a building


MUMTY
Covered area over a staircase and its landing built to enclose it or for the
purpose of providing protection from weather and not to be used
for human habitation
PARAPET WALL
A low wall/railing built along the edge of the room/floor for the
protection is parapet wall (min height-3 feet ; max height-4 feet)

Plain parapet wall Castle parapet Perforated parapet walls

Curved parapet walls. Flat parapet wall Stepped parapet wall


GARAGE
Building/por
tion of a
building of a
building
which is
used as
shelter for
storage or
parking the
vehicle
FLOORS
Lower surface in a storey on which one normally walks in a building
MEZZANINE FLOOR
Additional floor between two consecutive floors. Minimum Height 2.2m;
maximum height 2.7m; shouldn't be used as kitchen
PORCH
Covered surface supported on pillars for the purpose of pedestrian or
vehicular approach to a building
LOFT
Intermediate floor space created between floor and ceiling of
a room clear height of which is 1.5m(5feet) and has to be used
for storage purpose only
DRAIN
A line of pipes including all fitting and equipments such as manholes
inspection chambers, traps which is used for the drainage of a
building or number of buildings
DRAINAGE
Removal of any liquid which can be storm water, waste water, sewage etc.
by a system, constructed for this purpose
DAMP PROOF COURSE
Course consisting of some appropriate water proofing material providing to
penetrate the dampness and moisture
HEADROOM
Clear height from top of a floor to bottom of a ceiling. Minimum height in
educational and industrial place without A/c – 3.6m and without A/c – 3m