III. Assumptions
2) Storm water discharge from PFF Pit is not considered.
Q= 13.95 ft3/s
n= 0.015
S= 0.003 W
By derivation,
Q = 3w2 x (1.4859/n) x (3W2/7W) 2/3 x S 1/2
W= 1.167 ft
D= 3.500 ft
VI. Ditch Dimension
W = 1.16
7
D2= 0.62
D1= 3.50
Summary of Tributay Area for Tie-in Point 1 (by Autocad)
1. Paved Areas
Overall Road 54200.96823
Area A Paved Areas 4934.5
Area E Paved Areas 9353.261906
Area G Paved Areas 5913.660486
Total: 74402.39062
2. Roof
Area A Roof 11307.24307
Total: 11307.24307
3. Gravel
Area H 80878.16116
Area G 9075.694227
Area E 13420.15705
Total: 103374.0124
JOB NUMBER : GH3145
JOB NAME : NEL (POE) PROJECT FEED WORKS
TITLE/STRUCTURE : Discharge Volume at Tie-in Point TI02
REFERENCE DRAWING :-
III. Assumptions
2) Storm water discharge from PFF Pit is not considered.
Q= 8.84 ft3/s
n= 0.015
S= 0.003 W
By derivation,
Q = 3w2 x (1.4859/n) x (3W2/7W) 2/3 x S 1/2
W= 0.983 ft
D= 2.949 ft
VI. Ditch Dimension
W = 0.98
3
D2= 0.52
D1= 2.95
Summary of Tributay Area for Tie-in Point 1 (by Autocad)
1. Paved Areas
Overall Road 26334.04308
Parking 35787.04072
Total: 62121.0838
2. Roof
Total: 0
3. Gravel
Area H 46857.90119
Total: 46857.90119
JOB NUMBER : GH3145
JOB NAME : NEL (POE) PROJECT FEED WORKS
TITLE/STRUCTURE : Discharge Volume at Tie-in Point TI03
REFERENCE DRAWING :-
III. Assumptions
2) Storm water discharge from PFF Pit is not considered.
Q= 62.50 ft3/s
n= 0.015
S= 0.003 W
By derivation,
Q = 3w2 x (1.4859/n) x (3W2/7W) 2/3 x S 1/2
W= 2.047 ft
D= 6.141 ft
VI. Ditch Dimension
W = 2.04
7
D2= 1.08
D1= 6.14
Summary of Tributay Area for Tie-in Point 3 (by Autocad)
1. Paved Areas
Overall Road 101324.2466
Area A Paved Areas 13551.7857
Area B Paved Areas 47875.2507
Area C Paved Areas 18980.8312
Area D Paved Areas 68272.6107
Area F Paved Areas 1711.8232
Area H Paved Areas 7429
Parking 26351.3193
Total: 285496.8674
2. Roof
Area A Roof 20599.6967
Area B Roof 6044.1595
Area C Roof 146635.2131
Area F Roof 2426.2202
Total: 175705.2895
3. Gravel
Area A/H 99875.5288
Area B 53345.8769
Area C 32246.2286
Area D 61269.1891
Area F 9322.0921
Area H 23428.9501
Total: 279487.8656
JOB NUMBER : GH3145
JOB NAME : NEL (POE) PROJECT FEED WORKS
TITLE/STRUCTURE : Discharge Volume at Tie-in Point TI03
REFERENCE DRAWING :-
III. Assumptions
1) Ditch at Tie-in Point 3 (TI03) shall be the focus of study since it will receive
the maximum volume of water.
2) Storm water discharge from PFF Pit is not considered.
V. Sizing of Ditch
Q=VxA
A=Q/V
Q= 62.50 ft3/s
V= 3.00 ft/s
A= 20.83 ft2
W = 2'
D2= 1.84
D1= 10.4
2