JOB NUMBER : GH3145

JOB NAME : NEL (POE) PROJECT FEED WORKS


TITLE/STRUCTURE : Discharge Volume at Tie-in Point TI01
REFERENCE DRAWING :-

I. Storm Water Quantity Calculation


Q=CxIxA

II. Parameters from General Specifications (060AS0001)


1) Design rainfall intensity is 4.91 in/hr or 0.000114 ft/s
2) Minimum Design Velocity for concrete pipes 3.0ft/sec

III. Assumptions
2) Storm water discharge from PFF Pit is not considered.

IV. Storm Water Quantity Calculation


C I A Q
Paved Areas 0.95 0.000114 74402.39 8.033564
Roof 0.95 0.000114 11307.24 1.220894
Gravel 0.4 0.000114 103374 4.699689
Total Discharge (ft3/s) 13.95415

V. Sizing of Ditch (by Manning Equation)


Q=VxA
V = (1.4859/n) x R 2/3 x S 1/2

Q= 13.95 ft3/s
n= 0.015
S= 0.003 W

Assumming Depth = 3 x Width


R = 3W2 / 7W
A= 3W2 D=3W

By derivation,
Q = 3w2 x (1.4859/n) x (3W2/7W) 2/3 x S 1/2
W= 1.167 ft

D= 3.500 ft
VI. Ditch Dimension

Depth (D1) = 3.50 ft


Depth (D2) = 0.62 ft (assuming15% of total depth of U-ditch)

W = 1.16
7

D2= 0.62

D1= 3.50
Summary of Tributay Area for Tie-in Point 1 (by Autocad)
1. Paved Areas
Overall Road 54200.96823
Area A Paved Areas 4934.5
Area E Paved Areas 9353.261906
Area G Paved Areas 5913.660486

Total: 74402.39062
2. Roof
Area A Roof 11307.24307

Total: 11307.24307
3. Gravel
Area H 80878.16116
Area G 9075.694227
Area E 13420.15705

Total: 103374.0124
JOB NUMBER : GH3145
JOB NAME : NEL (POE) PROJECT FEED WORKS
TITLE/STRUCTURE : Discharge Volume at Tie-in Point TI02
REFERENCE DRAWING :-

I. Storm Water Quantity Calculation


Q=CxIxA

II. Parameters from General Specifications (060AS0001)


1) Design rainfall intensity is 4.91 in/hr or 0.000114 ft/s
2) Minimum Design Velocity for concrete pipes 3.0ft/sec

III. Assumptions
2) Storm water discharge from PFF Pit is not considered.

IV. Storm Water Quantity Calculation


C I A Q
Paved Areas 0.95 0.000114 62121.08 6.707495
Roof 0.95 0.000114 0 0
Gravel 0.4 0.000114 46857.9 2.130299
Total Discharge (ft3/s) 8.837794

V. Sizing of Ditch (by Manning Equation)


Q=VxA
V = (1.4859/n) x R 2/3 x S 1/2

Q= 8.84 ft3/s
n= 0.015
S= 0.003 W

Assumming Depth = 3 x Width


R = 3W2 / 7W
A= 3W2 D=3W

By derivation,
Q = 3w2 x (1.4859/n) x (3W2/7W) 2/3 x S 1/2
W= 0.983 ft

D= 2.949 ft
VI. Ditch Dimension

Depth (D1) = 2.95 ft


Depth (D2) = 0.52 ft (assuming15% of total depth of U-ditch)

W = 0.98
3

D2= 0.52

D1= 2.95
Summary of Tributay Area for Tie-in Point 1 (by Autocad)
1. Paved Areas
Overall Road 26334.04308
Parking 35787.04072

Total: 62121.0838
2. Roof

Total: 0
3. Gravel
Area H 46857.90119

Total: 46857.90119
JOB NUMBER : GH3145
JOB NAME : NEL (POE) PROJECT FEED WORKS
TITLE/STRUCTURE : Discharge Volume at Tie-in Point TI03
REFERENCE DRAWING :-

I. Storm Water Quantity Calculation


Q=CxIxA

II. Parameters from General Specifications (060AS0001)


1) Design rainfall intensity is 4.91 in/hr or 0.000114 ft/s
2) Minimum Design Velocity for concrete pipes 3.0ft/sec

III. Assumptions
2) Storm water discharge from PFF Pit is not considered.

IV. Storm Water Quantity Calculation


C I A Q
Paved Areas 0.95 0.000114 285496.9 30.82639
Roof 0.95 0.000114 175705.3 18.9717
Gravel 0.4 0.000114 279487.9 12.70635
Total Discharge (ft3/s) 62.50444

V. Sizing of Ditch (by Manning Equation)


Q=VxA
V = (1.4859/n) x R 2/3 x S 1/2

Q= 62.50 ft3/s
n= 0.015
S= 0.003 W

Assumming Depth = 3 x Width


R = 3W2 / 7W
A= 3W2 D=3W

By derivation,
Q = 3w2 x (1.4859/n) x (3W2/7W) 2/3 x S 1/2
W= 2.047 ft

D= 6.141 ft
VI. Ditch Dimension

Depth (D1) = 6.14 ft


Depth (D2) = 1.08 ft (assuming15% of total depth of U-ditch)

W = 2.04
7

D2= 1.08

D1= 6.14
Summary of Tributay Area for Tie-in Point 3 (by Autocad)
1. Paved Areas
Overall Road 101324.2466
Area A Paved Areas 13551.7857
Area B Paved Areas 47875.2507
Area C Paved Areas 18980.8312
Area D Paved Areas 68272.6107
Area F Paved Areas 1711.8232
Area H Paved Areas 7429
Parking 26351.3193
Total: 285496.8674
2. Roof
Area A Roof 20599.6967
Area B Roof 6044.1595
Area C Roof 146635.2131
Area F Roof 2426.2202
Total: 175705.2895
3. Gravel
Area A/H 99875.5288
Area B 53345.8769
Area C 32246.2286
Area D 61269.1891
Area F 9322.0921
Area H 23428.9501
Total: 279487.8656
JOB NUMBER : GH3145
JOB NAME : NEL (POE) PROJECT FEED WORKS
TITLE/STRUCTURE : Discharge Volume at Tie-in Point TI03
REFERENCE DRAWING :-

I. Storm Water Quantity Calculation


Q=CxIxA

II. Parameters from General Specifications (060AS0001)


1) Design rainfall intensity is 4.91 in/hr or 0.000114 ft/s
2) Minimum Design Velocity for concrete pipes 3.0ft/sec

III. Assumptions
1) Ditch at Tie-in Point 3 (TI03) shall be the focus of study since it will receive
the maximum volume of water.
2) Storm water discharge from PFF Pit is not considered.

IV. Storm Water Quantity Calculation


C I A Q
Paved Areas 0.95 0.000114 285496.9 30.82639
Roof 0.95 0.000114 175705.3 18.9717
Gravel 0.4 0.000114 279487.9 12.70635
Total Discharge (ft3/s) 62.50444

V. Sizing of Ditch
Q=VxA
A=Q/V

Q= 62.50 ft3/s
V= 3.00 ft/s
A= 20.83 ft2

(Assuming internal width of U-ditch is 2ft)


Depth (D1) = 10.42 ft
Depth (D2) = 1.84 ft (assuming15% of total depth of U-ditch)

W = 2'

D2= 1.84

D1= 10.4
2