Lean Consortium - Project Initiation Plan - 130921 - v0.4
Lean Consortium - Project Initiation Plan - 130921 - v0.4
VERSION
ORION HEALTH
LEAN CONSORTIUM –
PROJECT INITIATION
Activities for PMO, Technical and
Clinical Workshops
Commercial in Confidence
ORION HEALTH | PROJECT INITIATION ACTIVITIES VERSION 0.2 2
Kevin Rumble
Orion Health
Email: kevin.rumble@orionhealth.com
Website: www.orionhealth.com
ORION HEALTH | PROJECT INITIATION ACTIVITIES VERSION 0.2 3
DOCUMENT HISTORY
Version Date Author(s) Comment
0.1 12-Sep-2021 Kevin Rumble Initial draft
0.2 12-Sep-2021 Kevin Rumble Initial draft for discussion with Lean
Consortium on 12-Sep-2021
ORION HEALTH | PROJECT INITIATION ACTIVITIES VERSION 0.2 4
TABLE OF CONTENTS
1. BACKGROUND.....................................................................................................4
2. DOCUMENT PURPOSE.......................................................................................5
3. PMO WORKSHOPS..............................................................................................6
5. TECHNICAL WORKSHOPS...............................................................................13
1. BACKGROUND
The Lean Consortium has been awarded the nphies project for delivering a HIE to the
Kingdom of Saudi Arabia. This project is scoped to deliver the HIE functionality over two
Releases (R2 and R3). The goal is to have R2 live by 12 months and R3 by 18 months.
It is also scoped to onboard the six Early Adopters from month 12 onwards.
Following month 12 there is a 12 month production Application Management Support and
following month 18 there is a further 6 month Application Management Support.
2. DOCUMENT PURPOSE
As this project has a number of deliverables and has a complex stakeholder engagement there
is a need to ensure that it starts with a clear understanding of roles, responsibility, technical
requirements/solution and clinical requirements/solution. To achieve this the Lean
Consortium will be running a number of PMO, Clinical and Technical workshops over the
first 2-8 weeks.
This document is designed to detail the required activities to occur during the project
initiation phase. The initiation phase will cover the establishment of the PMO process and
associated meetings, along with the project management meetings required
3. PMO WORKSHOPS
This section covers the list of proposed PMO workshops, required attendees and agendas. PMO workshops can be scheduled starting Week 2 of
the project, according to the availability of the required nphies attendees. nphies decision makers will need to be present in the workshops. The
expected outcome of the PMO workshops is to agree on the approach and tools that will be used to deliver and track the project.
Hina Laghari
Week 2 Project CCHI Program/Project CCHI/NHIC Project Communication 1 hour
Communication, Status management team Hessa Al-Abbad Plan
Meetings and Sehati Program/Project Sara Al-Shaya Project status updates
Reporting management team Others TBC o Steering
Lean Consortium Sehati Committee
Program Managers, Ahmad Bukhari (quarterly)
Project Managers and Jose Mussi o Project
Project Coordinators Lean Consortium – Management
Nawaf Alharbi Committee
Ahmed Alnaji (monthly)
Hani Akrim o PMO Status
Majed Eshaq Update (weekly)
Kevin Rumble
Rana Rizk
Hina Laghari
Week 2 Project Scheduling and CCHI Program/Project CCHI/NHIC Tools and approach of 1 – 2 hours
Reporting management team Hessa Al- master project plan
Sehati Program/Project Abbad Detailed project plan
management team Sara Al-Shaya structure requirements
Lean Consortium Others TBC
Program Managers, Sehati
Project Managers and Ahmad Bukhari
Project Coordinators Jose Mussi
Lean Consortium –
Nawaf Alharbi
ORION HEALTH | PROJECT INITIATION ACTIVITIES VERSION 0.2
Ahmed Alnaji
Hani Akrim
Majed Eshaq
Kevin Rumble
Rana Rizk
Hina Laghari
Week 3 Deliverable Review CCHI Program/Project CCHI/NHIC Deliverable submission, 1.5 hours
and Approval Process management team Hessa Al-Abbad review and
Sara Al-Shaya approval/sign-off
Sehati Program/Project Others TBC process
management team Sehati Certificate of
Lean Consortium Ahmad Bukhari Completion (CoC)
Program Managers, Jose Mussi template and
Project Managers and Lean Consortium – submission/approval
Project Coordinators process
Nawaf Alharbi
Ahmed Alnaji Deliverables tracker and
Hani Akrim status meeting
Majed Eshaq
Kevin Rumble
Rana Rizk
Hina Laghari
Week 3 Project Charter CCHI Program/Project CCHI/NHIC Project Charter template 1 hour
management team Hessa Al-Abbad and required sections
Sehati Program/Project Sara Al-Shaya
management team Others TBC
Lean Consortium Sehati
Program Managers,
ORION HEALTH | PROJECT INITIATION ACTIVITIES VERSION 0.2
Ahmed Alnaji
Hani Akrim
Majed Eshaq
Kevin Rumble
Rana Rizk
Hina Laghari
of n
12 CCHI/NHIC 2 hrs
Sep. Hessa Al-Abbad
2021 Sara Al-Shaya
Other TBC
Sehati
Onboarding initiation workshop 1: Ahmad Bukhari
- OB framework overview Jose Mussi
- mandate and governance Lean Consortium –
model Lean Ahmed Alnaji
- stakeholders' identification -
Consortium Nawaf Alharbi
- communication
methodology Amjad Ageel
- Terms of reference Mohammed Alfaqih
May Alasmary
Rehab Madkhali
Kevin Rumble
Rana Rizk
Hina Laghari
Others TBD
Onboarding initiation workshop 2: Lean CCHI/NHIC 2hrs -
- 4 weeks Deliverables Plan Consortium Hessa Al-Abbad
- Timeline and Project Sara Al-Shaya
Constraints Overview
Others TBC
- RACI Review
- Early adopters’ orientation Sehati
preparation Ahmad Bukhari
Jose Mussi
Lean Consortium –
Ahmed Alnaji
Nawaf Alharbi
Amjad Ageel
Mohammed Alfaqih
May Alasmary
ORION HEALTH | PROJECT INITIATION ACTIVITIES VERSION 0.2
Rehab Madkhali
Kevin Rumble
Rana Rizk
Hina Laghari
Others TBD
19 CCHI/NHIC 1 hr
Sep. Hessa Al-Abbad
2021 Sara Al-Shaya
Others TBC
Sehati
Ahmad Bukhari
Jose Mussi
Lean Consortium –
Ahmed Alnaji
Nawaf Alharbi
Amjad Ageel
Mohammed Alfaqih
May Alasmary
Rehab Madkhali
Kevin Rumble
Rana Rizk
Hina Laghari
Massis Ovanessoff
Others TBD
Solution Overview - Kick Off: Start first round of technical and clinical clarifications workshops
Refer to Technical workshops section.
New Site Survey Development Lean CCHI/NHIC 3 hrs Finalize Survey
Workshop: Consortium Hessa Al-Abbad
- Tooling, publishing and Sara Al-Shaya
management Others TBC Clinical/Technical
- CM Track
Sehati
- Clinical Track
- Technical Track Ahmad Bukhari
Jose Mussi
Lean Consortium –
Ahmed Alnaji
Nawaf Alharbi
Amjad Ageel
Mohammed Alfaqih
May Alasmary
Rehab Madkhali
Kevin Rumble
Rana Rizk
Hina Laghari
ORION HEALTH | PROJECT INITIATION ACTIVITIES VERSION 0.2
Massis Ovanessoff
Others TBD
Lean CCHI/NHIC 5 WD to
Consortium Hessa Al-Abbad respond
Sara Al-Shaya to the
survey
Others TBC and send
Sehati it back
Ahmad Bukhari Early Adopters feedback on previous
responses and new survey
Jose Mussi
walkthrough and guidelines.
Early Adopters Single Point of Contact*
Early Adopters Technical and Clinical Teams
Sehati/NHIC Dependency:
Early Adopters' site survey Workshop Lean Consortium – - Provide the final list of the
Ahmed Alnaji early adopters
Nawaf Alharbi - Single Point of Contact
Amjad Ageel Orientation and appointment
is completed (6+2
Mohammed Alfaqih
candidates early adopters
May Alasmary group)
Rehab Madkhali
Kevin Rumble
Rana Rizk
Hina Laghari
Other TBC
26 Onboarding KPIs identification Lean CCHI/NHIC 2 hrs Initial onboarding KPI Baseline and
Sep. Workshop Consortium Hessa Al-Abbad targets
2021 Sara Al-Shaya
Others TBC Clinical/Technical
Sehati
Ahmad Bukhari
Jose Mussi
Lean Consortium –
Ahmed Alnaji
ORION HEALTH | PROJECT INITIATION ACTIVITIES VERSION 0.2
Nawaf Alharbi
Amjad Ageel
Mohammed Alfaqih
May Alasmary
Rehab Madkhali
Kevin Rumble
Rana Rizk
Hina Laghari
Other TBC
Lean CCHI/NHIC 2 hrs
Consortium Hessa Al-Abbad
Sara Al-Shaya
Others TBC Clinical/Technical
Sehati
Ahmad Bukhari
Jose Mussi
Lean Consortium –
* May require further 1 on 1
Ahmed Alnaji
Survey Results Analysis Workshop* workshops and site visits depending on
Nawaf Alharbi
the results
Amjad Ageel
Mohammed Alfaqih
May Alasmary
Rehab Madkhali
Kevin Rumble
Rana Rizk
Hina Laghari
Other TBC
Early Adopters Solution Overview Lean CCHI/NHIC 2hrs Revised content from Solution
Consortium Overview - Kick Off: Start first
Hessa Al-Abbad
round of technical and
Sara Al-Shaya
clinical clarifications workshops In the
Others TBC Clinical/Technical
technical workshop track for the EA
Sehati
ORION HEALTH | PROJECT INITIATION ACTIVITIES VERSION 0.2
Ahmad Bukhari
Jose Mussi
Massis Ovanessoff
Kevin Rumble
Rana Rizk
Hina Laghari
Other TBC
Lean CCHI/NHIC 2 hrs
Consortium
Hessa Al-Abbad
Sara Al-Shaya
Others TBC Clinical/Technical
Sehati
Ahmad Bukhari
Jose Mussi
Onboarding Plan Development Lean Consortium –
workshop 1 Ahmed Alnaji
- Awareness -
Nawaf Alharbi
- Training Amjad Ageel
Mohammed Alfaqih
May Alasmary
Rehab Madkhali
Kevin Rumble
Rana Rizk
Hina Laghari
Other TBC
Onboarding Plan Development Lean CCHI/NHIC 2 hrs -
workshop 2 Consortium Hessa Al-Abbad
- Knowledge Management Sara Al-Shaya
- Adoption/mapping
monitoring and escalation Others TBC Clinical/Technical
- Testing and Certification Sehati
Ahmad Bukhari
Jose Mussi
Lean Consortium –
Ahmed Alnaji
ORION HEALTH | PROJECT INITIATION ACTIVITIES VERSION 0.2
Nawaf Alharbi
Amjad Ageel
Mohammed Alfaqih
May Alasmary
Rehab Madkhali
Massis Ovanessoff
Kevin Rumble
Rana Rizk
Hina Laghari
Other TBC
Lean NA * once confirmed General
Detailed Onboarding Plan Consortium Not a workshop Awareness for the EA on the
Submission
plan will be scheduled.
5. TECHNICAL WORKSHOPS
WEEK SESSION ATTENDEES NAMES OF DECIDERS AGENDA DURATION
ATTENDEES
Week 1 Planning N/A N/A N/A Plan for Technical N/A
and Clinical
Clarification Workshops
Confirm infrastructure
is available as per BOQ
Week 2 Solution CCHI/NHIC CCHI/NHIC - N/A Start first round 2-3 hours
Overview - Kick Sehati Hessa Al-Abbad of technical and
Off Lean Sara Al-Shaya clinical clarifications
ORION HEALTH | PROJECT INITIATION ACTIVITIES VERSION 0.2
Tariq workshops
Haneen Aseeri
Saud Al-Otaibi
Sehati -
TBC
Lean Consortium -
Massis
Ovanessoff
Lean TBC
Week 2 Infrastructure Lean CCHI Yes Start fine-tuning requirements 2-3 hours
Strategy Sehati and Site Site and addressing gaps
Lean
NHIC Ops
Week 2 Design Authority Sehati PWC David N/A 1-2 hours
and Practice Lean Sawh
Hussein Al Ali
BTAC
Week 2 External CCHI/NHIC TBC N/A National Systems Specs 1-2 hours
Integration Sehati
Lean
Week 3 Interface Design CCHI/NHIC TBC Yes nphies to grant 2-3 hours
(HL7 & XDS) Sehati remote access to Lean
Lean Consortium
Week 3 Participant CCHI/NHIC TBC Yes Continue technical 1-2 hours
Integration & Sehati and clinical
Connectivity Lean clarification workshops
Week 3 Data Migration CCHI/NHIC TBC Yes 1-2 hours
ORION HEALTH | PROJECT INITIATION ACTIVITIES VERSION 0.2
Sehati
Lean
Week 3 Registries CCHI/NHIC TBC N/A 1-2 hours
Sehati
Lean
Week 3 Terminology NHIC/CCHI TBC Yes Deployment, features, 1-2 hours
Services Lean codes and standards
Week 3 Image Viewer CCHI TBC N/A Integration, GE and 1-2 hours
Sehati Imaging scope (studies etc)
Lean check IS Spec
Week 4 Technical CCHI/NHIC TBC Yes 1-2 hours
Requirement Sehati
clarifications Lean
Week 4 Technical CCHI/NHIC TBC Yes Confirm test 2-3 hours
Requirement Sehati environments availability
clarifications Lean
Week 4 Requirement CCHI/NHIC TBC Yes Start preparation 2-3 hours
clarifications Sehati of Solution Design
Lean
Week 4 Requirement CCHI/NHIC TBC Yes Start preparation 2-3 hours
clarifications Sehati of Functional Design
Lean
ORION HEALTH | PROJECT INITIATION ACTIVITIES VERSION 0.2
Week 4 Analysis Workshops OH TBC YES Integration, GE and Imaging scope 2-3 hours
GE (studies etc) check IS Spec
Ascend
ORION HEALTH | PROJECT INITIATION ACTIVITIES VERSION 0.2
Ascend to fill
1 and 3 Overview – CCHI TBC Specific patient information has been Discussion – these topics continue
Information NHIC classified as 'sensitive' in the Provider for each topic.
Privacy Clinical Portal. Break the seal - Sensitive
ORION HEALTH | PROJECT INITIATION ACTIVITIES VERSION 0.2
Tool-tips
Break the seal - patient
privacy
3 Viewing a CCHI TBC The Patient Record is the screen that Patient Record - context view
patient's NHIC is displayed - read-only summary Including - general use - navigation
information Clinical view of the patient's information. and icons
BA's
3 Patient Banner – context banner Default opening - display - column
order, naming conventions (without
(blank) and with information)
Worklists
HL7 example
Code set used
3 Allergies Alert - displays the allergy Default opening - display - order,
status for the patient and is visible naming conventions (without
from anywhere in the patients record. (blank) and with information)
HL7 example
Allergies Alert Code set used
Allergies Not Recorded
No Known Allergies
3 Patient Summary displays all Default opening - display - column
information available for the patient order, naming conventions (without
from all EMR's connected with the (blank) and with information)
Provider Portal, including the user's Tabs
own organization Windowlets
Displays clinically relevant Display and sorting
information in windowlet (table) view. Maximize
ORION HEALTH | PROJECT INITIATION ACTIVITIES VERSION 0.2
Tool-tips
Break the seal - sensitive
information
3 Demographics Default opening - display - order,
naming conventions
HL7 example
Code set used
4 Allergies Default - display - column order,
Displays allergy information recorded naming conventions (without
from each EMR. (blank) and with information)
Ordered by severity first
then date recorded in EMR -
server highlighted in red.
Maximize
Sort
Tool-tips
Roll-up
HL7 example
Code set used
4 Encounter History Default opening - display - column
order, naming conventions (without
Displays information from every visit (blank) and with information)
for the patient - all Source systems Ordered by most recent
connected to the Provider Portal. date.
Primary diagnosis for the
encounter is displayed in the
diagnosis column. Any
ORION HEALTH | PROJECT INITIATION ACTIVITIES VERSION 0.2
recorded Problems.
Maximize
Sort
Tool-tips
Roll-up
NOTE - Break Privacy Seal -
sensitive information.
HL7 example
Code set used
Break Privacy seal -
sensitive information
4 Procedures Default opening - display - column
order, naming conventions (without
Displays a list of the surgical and (blank) and with information)
minor procedures that have been Ordered by most recent date
recorded for the patient. and time.
When more than one
Procedure is performed on
the same date, they will be
rolled up by date - select the
magnifying glass to see all
the Procedures performed
on the same day.
Maximize
Sort
Tool-tips
Roll-up
ORION HEALTH | PROJECT INITIATION ACTIVITIES VERSION 0.2