Recieved Drawing to BHG Company

SNO Drawing Name Date Hand-over


1 PM#4 footing and piles details 4/18/2019 Hasrat ali
2 Piling details 4/18/2019 Hasrat ali
3 Plan layout of PM#4 4/18/2019 Hasrat ali
4 Piling details 4/19/2019 Hasrat ali
5 RCC column pile fdn. Plan detail 2set 5/29/2019 Mandeep Civil
6 RCC column pile fdn. Plan detail 2set 6/5/2019 Sunil BHG
7 Revised RCC column pile fdn. Plan detail 2set 6/8/2019 Sunil BHG
8 F5,F6,F7,F8,F8,F9,F10,F11,F12 piling &fdn. Detail 6/10/2019 Sunil BHG
9 Pliles fdn. Plan layoput drg-1 6/17/2019 Sunil BHG
10 RCC column & padestral detail Reinforced detail A0 3set drg-2 6/19/2019 Sunil BHG
11 Pile fdn. Dim layout drg-3 6/19/2019 Sunil BHG
12 Pile fdn. Detail 6/19/2019 Sunil BHG
13 Pile fdn. Detail 6/19/2019 Sunil BHG
14 RCC Plinth beam Plan 6/23/2019 Hasrat ali
15 RCC Plinth beam Plan 6/23/2019 Hasrat ali
16 RCC Plinth beam Plan 8/6/2019 Hasrat ali
17 RCC Plinth beam details 8/6/2019 Hasrat ali
18 White water tank plan 7/6/2019 BHG
19 Couch pit 90m3 7/6/2019 BHG
20 Press pulper 80m3 7/6/2019 BHG
21 Reel Pulper 120m3 7/6/2019 BHG
22 Size pulper 60m3 7/6/2019 BHG
23 Base plate drg no-1065815-1/3 7/6/2019 BHG
24 Base plate drg no-1065815-2/3 7/6/2019 BHG
25 Base plate drg no-1065815-3/3 7/6/2019 BHG
27 RCC floor beam plan size and section A0 8/7/2019 BHG
28 Machine area beam plan slab & roof 8/20/2019 BHG
29 8/20/2019 BHG
First floor RCC beam plan slab and details
Machine area beam 6.5 9/2/2019 BHG
30 Staircase details 8/20/2019 BHG
31 Pile and reinforced F12,F13,F14, F14 pile detail cantilever beam 8/30/2019 BHG
32 Layout locatin fdn. F13,F14, 8/30/2019 BHG
33 Cantilever details drg 8/30/2019 BHG
34 1st floor RCC beam plan A0-2set 9/2/2019 BHG
35 RCC column and pedestal details A3-2set 9/2/2019 BHG
36 Insert plate layout pm4 A2-2set 9/6/2019 BHG
37 Finishing house fdn 9/10/2019 BHG
38 Base plate location allimand = 1/3, 2/3,3/3 9/16/2019 BHG
39 Loads drg civil work 9/16/2019 BHG
40 Revised pedestral and beam 10/13/2019 BHG
44 Reel pulpuer RYA FOR PM4 1001-D-005 R2 10/25/2019 Sunil BHG
45 W.W PIT 70M3 RYA -SIL-PM4-1001-D-001 R2 10/25/2019 Sunil BHG
46 W.W PIT 70M3 RYA -SIL-PM4-1002-D-001 R2 10/25/2019 Sunil BHG
47 W.W PIT 70M3 RYA -SIL-PM4-1003-D-001 R1 10/25/2019 Sunil BHG
48 W.W PIT 70M3 RYA -SIL-PM4-1004-D-001 R2 10/25/2019 Sunil BHG
49 Tie beam plan detail 12/14/2019 BHG
50 12m floor slabs of pm4 2print 12/17/2019 BHG
51 Stairs 6 to 12 m 12/17/2019 BHG
52 GA of machine building 1/2/2020 BHG
54 1065815 3/3 rev-e pm4 1/2/2020 BHG
56 DIP layout (1001-LA 002-02 R1 1/9/2020 BHG
57 DIP layout (1001-LA 002-02/1 R1 1/9/2020 BHG
58 Di-inking piling details steel detail 1/9/2020 BHG
59 SK-PM4-M-0195 R5 1/9/2020 BHG
60 Floor beam plan slab and details at 6.450m stock prep. 1/11/2020 BHG
61 RCC beam and bracket and gutter details 1/13/2020 BHG
62 Di-inking piling details 1/13/2020 BHG
63 Di-inking fdn.details 1/13/2020 Mandeep Civil
64 RCC beam and bracket and gutter details 1/13/2020 Mandeep Civil
65 Floor beam plan of details at lvl.-12.0 2/13/2020 BHG
67 Apprach flow foundation 1001-FDN-001-04 to 10 3/16/2020 Mandeep Civil
68 Foundation plan layout for approach flow at 0.0mtr. Rev-2 3/16/2020 Mandeep Civil
78 12m floor section drive side and tender side-1001-GA-003-024-R5 7/6/2020 Chanderprakash
93 Plinth beam - R0 7/23/2020 BHG
94 Equipment fdn - 1001-LA-002-08 R0 7/23/2020 BHG
95 Layout DIP building -1001-LA-00-21 R0 1 to 32 7/23/2020 BHG
96 Bleach tower 1001-FDN-002-21 R2 7/23/2020 BHG
99 Column detail pedestal 7/23/2020 BHG
100 Layout of supporting plate location of DIP building R0 8/25/2020 BHG