N NOTES:
6"
8. LAP LENGTH OF BARS : 50Ø, AT COLUMN LAPPING PROVIDE 4"
15
5'
3' SPACING OF TIES, NO LAPPING ALLOWED AT BEAM-COLUMN JOINT.
Y8-8"C/C 9. DEVELOPMENT LENGTH (Ld) FOR REINFORCEMENT BARS
6"
E IN COMPRESSION : 40Ø E
IN TENSION : 50Ø
13 10. IN CASE OF BEAM REINFORCEMENT, NO LAPPING SHALL BE ALLOWED
IN FOLLOWING PLACES
(a) TOP ROD NEAR COLUMN, L/4 ON EITHER SIDES OF COLUMN
(b) TOP ROD OF CANTILEVER BEAM ALONG THE LENGTH AND
11
Y10-5"C/C ALSO DEVELOPMENT LENGTH, BEYOND COLUMN
Y10-5"C/C (c) BOTTOM ROD AT MID SPAN OF BEAM
10 11. REMOVAL OF SHUTTERING / FORM WORK
(a) COLUMN : 24 HOURS
6"
(b) BEAM SIDES : 24 HOURS
6" MLB (c) BEAM BOTTOM : LESS THAN 6M SPAN : 14 DAYS
: MORE THAN 6M SPAN: 28 DAYS
Y8-8"C/C (d) SLAB : LESS THAN 20'SPAN : 14 DAYS
: MORE THAN 20'SPAN : 28 DAYS
HOWEVER 7 DAYS STRENGTH OF CONCRETE SHOULD BE 65% OF THE
TARGET STRENGTH, TO REMOVE FORM WORK.
D SECTION B-B 12. THIS BUILDING IS DESIGNED FOR GROUND FLOOR + 1. D
9"
7'-6" 3'
2-Y12
Y10-5"C/C
10
12"
Y8@6"
6"
C 3' 9 C
MLB
2-Y12
Y8-8"C/C
7 6" REV NO Date REVISION REMARKS
10"
MID LANDING BEAM DETAIL
6"
6"
5
5'
3'-1"
6" B STAIRCASE LAYOUT &
6'-11"
DETAIL
Y8-8"C/C REINFORCEMENT DETAILS
VARIES
PB Scale 1:100
DRAWN CHECKED APPROVED
A
A B Date 03-05-2021 A
AS KR Y.BOOPATHI Paper A3
Size
STAIRCASE LAYOUT Rev.no R0
DRAWING NO:- YB-21031-ST-08
Sheet.no (07 OF 8)
1 2 3 4 5 6 7 8 9 10