You are on page 1of 1

E

LEGEND
ROCKBOLTS

SHOTCRETE

ROCK LINE / MIN. EXCAVATION LINE

NOTES
1. ALL DIMENSIONS ARE IN MILLIMETERS, UNLESS OTHERWISE SPECIFIED.
2. NO DIMENSION SHALL BE MEASURED, ONLY WRITTEN DIMENSIONS ARE TO BE TAKEN AS
CORRECT.
3. ALL ROCK SUPPORT AS PER CONSTRUCTION SEQUENCE SHALL BE PROVIDED BEFORE
BLASTING OF SUBSEQUENT ROUND.
4. ADDITIONAL ROCK SUPPORT MAY BE INSTALLED AS PER SITE CONDITION.
5. SHOTCRETE / SFRS AS SPECIFIED SHALL BE APPLIED CONFORMING TO THE TECHNICAL
SPECIFICATIONS.
6. DRAINAGE HOLES SHALL BE PROVIDED WHEREVER REQUIRED.
7.
OF THE ROCKBOLTS SHALL BE CONFIRMED AT SITE THROUGH PULL OUT TEST.
8. ALL ROCK BOLTS SHOULD BE OF Fe500 STEEL.
9. ADDITIONAL LAYER OF SHOTCRETE / ROCK BOLT SHALL BE PROVIDED AS PER SITE
CONDITION.

1 2 3 4 5 6 7 8
REFERENCES DRAWN

CHECKED
SM CONSULTANTS
DESIGNED

CHECKED TUNNEL SUPPORT IN ROCK CLASS- I


APPROVED

DATE

DATE

C:\USERS\ADMIN\DESKTOP\CHAMOLI22072018\ROCK SUPPORT\RDL ENG\8X5.5 I.DWG