New citations harmonised standards in OJEU

On 19 March 2019, the below new harmonised standard or new versions of harmonised standards
were adopted in the commission implementing decision No. 2019/451 – see direct LINK.

Standard Number Title Transition period SG/SH


EN 54-5:2017+A1:2018 Fire detection and fire alarm XX.yy.2019 31.08.2022 SG07
systems — Part 5: Heat
detectors — Point heat
detectors
EN 54-7:2018 Fire detection and fire alarm xx.yy.2019 31.08.2022 SG07
systems — Part 7: Smoke
detectors — Point smoke
detectors that operate using
scattered light, transmitted light
or ionization
EN 492:2012+A2:2018 Fibre-cement slates and fittings xx.yy.2019 xx.yy.2020 SG01
— Product specification and
test methods
EN 1096-4:2018 Glass in building — Coated xx.yy.2019 xx.yy.2020 SG09
glass — Part 4: Product
standard
EN 1279-5:2018 Glass in building — Insulating xx.yy.2019 xx.yy.2020 SG09
glass units — Part 5: Evaluation
of conformity
EN 12467:2012+A2:2018 Fibre-cement flat sheets — xx.yy.2019 xx.yy.2020 SG01
Product specification and test
methods
EN 15824:2017 Specifications for external 09.03.2018 09.03.2020 SG02
renders and internal plasters
based on organic binders

Transition
During the transition, both the old and the new version of the standards are applicable as harmonised
standards. After the transition period, only the new versions can be applied.

For some of the standards, the transition period is listed as xx.yy.2019 to xx.yy. The correct transition
periods are expected to be indicated in the NANDO database, see LINK.

IMPORTANT NOTICE FOR NOTOFIED BODIES:


The notification scopes of notified bodies are no longer automatically are no longer automatically
updated when harmonised standards are amended and/or new versions are adopted.

Each notified body will need to apply with its notifying authority to have the new versions
included in their scope of notification.
After the end of the transition period, bodies which have not obtained notification for the new versions
will no longer be notified bodies for the harmonised standards in question.