Professional Documents
Culture Documents
Waste Water Line Layout Gonzales-Jimenez
Waste Water Line Layout Gonzales-Jimenez
4.4
0.3 0.1
SANITARY TEE AS BAFFLE SAME
SIZE AS BUILDING SEWER PIPE FREEBOARD FREEBOARD FREEBOARD
1
1700
WASTEWATER
FROM OTHER
UNITS,IF THERE
IS ANY
SCUM STORAGE ZONE
2 200MM THICK CHB WALL WITH 10MM
1.35
LAV
WC Ø HORIZONTAL REINFORCEMENT SEDIMENTATION ZONE
CO SPACED EVERY 3 BLOCKS AND 10MM
1.0
FD Ø VERTICAL BARS SPACED AT 600MM SLUDGE DIGESTION ZONE
3300
100MM Ø
SP U/G SK
150MM THICK RC BOTTOM SLAB
WITH 12MM MESH REINFORCEMENT DIGESTED SLUDGE STORAGE ZONE
3 SPACED AT 125MM O.C. B.W.
0.15
DENTAL
3300
4
3600
UP
5
100MM Ø
SP U/G
3500
1.0
1.4
MANHOLE MANHOLE MANHOLE
(MIN) (MIN) (MIN)
SEPTIC
TANK
AS
6 CONTAINMENT
FACILITY
3000
1 A
7 2
17 B 3 SEPTIC TANK DETAILS
0 0 00 SE2 SCALE NTS
25
3 33
00
00 C
40 0
00
4 13
1 WASTEWATER LINE LAYOUT 00
33
F WA
TH UNROMSTE
SE2 SCALE 1:100 MTS ER IT O WA
E S, TH TE
IS I ER R 00 D
ANF 40
5 36 Y
00 E
00
25
6 35
0 1
SP00M
0
UP U/ M Ø LA
G V
7 30 CLDENT FD WC
00 IN AL SK CO
IC
S
C T EP
FAONTAASANKTIC
CI IN 1
LI ME
TY NT SP00M
U/M Ø
G
ISOMETRIC
2 WASTEWATER LINE LAYOUT
SCALE 1:100 MTS
SE2