The fly ash from the 2x500 MW CPP is collected in dry form in 3 nos. HCSD silos.
Each
HCSD silo is having two types of dry fly ash unloading system. One (1) no. dry
unloading system & two (2) nos. wet (Slurry) unloading systems for High
Major Systems :
The High Concentration slurry disposal system can be divided into two major
sections.
⦁ Mixing of the fly ash with water in ash mixers to form thick slurry.
⦁ Charge pumps.
⦁ Main pipelines.
⦁ Emergency Stop
SPECIFICATION:
1
Capacity of HCSD SILO : 3 Nos. X 350 TONN
⦁ HCSD CHARGE PUMP DETAILS (3 Nos.):-
- MOTOR RATING - 75 KW
⦁ HT/LT swgr for the HCSD and other assosiated auxiliaries and water pumps to be
run is in charged condition.
2
⦁ Instrument air for valve operation is available and pressure ok.
⦁ All manual valves are in open condition of HCSD system being taken in service.
UNLOADING SYSTEM:
In dry unloading system fly ash unloads via plate valve (manual & cylinder operated),
In Wet (slurry) unloading system fly ash unloads via a surge hopper ,inlet dome
valve,
bin weighing system, rotary Vane Feeder, solid flow meter and an ash Mixer to the
The system will be operated from Local HCSD silo dry unloading Panel only.
Check Points
Before starting the system operation, check and confirm the following:
Starting Sequence
3
⦁ Start Silo Fluidizing blowers . (If not already ON).
⦁ After a “Telescopic spout down position indication” at Panel, start dry unloading
spout fan(Status-ON).
When the spout truck full level is achieved, operator to stops the unloading system
in
following sequence:
Stopping Sequence
⦁ Stop dry unloading rotary feeder ,then telescopic spout can be raised UP.
⦁ When the spout reaches its UP position dry unloading spout Fan and its timer
unit are automatically stopped.
⦁ The unloading system has stopped and can be started again when the next truck is
available.
4
⦁ One Mainline HCSD pump piston diaphragm slurry pumps.
First select the desired system to unload. Then operator will provide a
“Preconditions Check” Command to Main PLC and then system will check all the
healthy conditions given below:-
Pre-conditions:
⦁ Bag Filter is in remote and not under fault or Bag filter already ON by operator.
⦁ ART agitator is in remote mode & not under fault or already running.
⦁ HCSD pump in Remote selected from Main PLC SCADA screen & not under any
fault.
⦁ When all above preconditions are OK, then “FA feed System Ready” will come.
⦁ When water level in ART is above min. level (say 10-15%), open Ash conditioner
header water valve.
5
⦁ Now make up water valve is closed.
⦁ Rotary vane feeder below Surge hopper shall start & fluidizing valve for Air Slide
shall open. (In addition Bag filter fan must start if not already started.)
⦁ After getting proper ash rate sample calculations, give a start command to Hose
Pump.
⦁ Exact fly ash feed rate will be adjusted by varying the rotary vane feeder speed as
per the signal received from SFM .
⦁ Flushing water requirement will also be met by opening the branch valves and
controlling the motorized control valve.
⦁ Now FA feed system will be operating as an integral part of the HCSD system.
Parameter to set
Pump System
Before starting the system, following parameters shall be set / checked :
⦁ Slurry Concentration.
For operation of HCSD system there are few facilities provided below:
6
⦁ HCSD Emergency Stop.
Preconditions:
⦁ Lubrication & propelling pumps for selected HCSD system in remote & not under
⦁ HCSD Pump will provide start request for Power end lubrication pump &
⦁ HCSD Pump PLC will check for other healthy conditions and give Pump ready to
start signal to Main PLC.
⦁ Now only Main PLC will give the HCSD pump start command to HCSD Pump PLC.
7
⦁ HCSD Pump will start at 10% speed and ramp-up to 20% at a preset rate defined in
the VFD and hold.
Ramp-up Sequence:-
⦁ Limit of 20% can be adjusted from PC based on exact slurry behavior at site.
⦁ If the pressure is not stable and is shooting up but within limits, pressure can be
allowed to increase.
⦁ If the pressure further increases, the pump trips (HCSD system only goes into Shut
down Mode).
⦁ When the pressure starts reducing and comes down, fly ash can be introduced
into the system.
⦁ Now start taking Fly ash into the ART at full preset TPH.
⦁ Water feed rate will also increase accordingly to maintain the slurry concentration.
⦁ When slurry level reaches 30% in the ART, further ramp-up of the pump starts.
⦁ Slurry level in the ART is finally maintained near 65-70% while maintaining the FA
feed rate at the set value.
⦁ If the fly ash is not available, water need to be increased to maintain the flow.
⦁ After this time, operator can decide to run the system at reduced flow with
normal
⦁ Slurry system can be stopped in regular shutdown if sufficient fly ash is not
available for conveying.
ways:
⦁ Emergency Stop
8
a) Normal System Stop
Each time a normal system stop is executed; system shall follow the sequence as
follows:
⦁ After another 5 minutes of Rotary Vane feeder stop, ash Mixer is stopped after it
is cleaned by feeding only process water (100% opening of Motorized valve).
⦁ The makeup water valve is opened and fills the ART to 50-70% level.
⦁ The system will pump water for 20-30 minutes (Flushing Time), after which
makeup water to ART is stopped.
⦁ Charge pump and HCSD pump will stop when “low low level” in the ART is
reached.
⦁ The level in the ART is allowed to lower until “low level” is reached.
the system will suddenly stop operating or an instrument will give a signal which will
initiate an emergency stop. When it is expected that the system stop will last for