2

4
Excavated area filling upto two feet height asper soil test report and PPC
Foundation,Footing, PCC
Plinth Beam Concrete  
Superstructure – Column Ground floor
Brick Masonry Work/Brick work for wall
The Lintel ,Shade cover Over Door Window Framing and Fixations Gaps concrete
staircase
Floor Slab or Slab upto Ground Slab including Ground floor Concrete

Superstructure – Column
Brick Masonry Work/Brick work for wall
The Lintel ,Shade cover Over Door Window Framing and Fixations Gaps concrete
Floor Slab or Roof Structure including parapet concrete asper submitted 3D
Plastering Works on External and Internal Walls, Ceiling, Sunshade
10. Electrical and Plumbing
11. Exterior Finishing
12. Terrace and Roof Finishing
13. Internal Finishes
14. Woodwork and Fixture Fittings
15. Waterproofing
16. Painting Work
AGREEMENT OF HOUSE CONSTRUCTION WORK LABOUR CONTRACT

Appendix A part.1 TABLE 1 CONSRUCTION PAYMENT PLAN PAGE 1/2


Mutual  Agreed contract Notes
STAGES NOS DESCRIPTION PAYMENT AMOUNT % Agreed Amount ACTUAL

STAGE A TO STAGE F ( Contractor Agree & shall execute the labour works of the building, as per the construction drawings submitted by owner of the total fees payable at the rate seventeen lakh
Set out and markings . (foundation+ plinth
+ wall masonry),Excavated area filling upto Advance payment only on 5 % of the total fees payable
two feet height asper soil test report work starting date From STAGE A TO STAGE F
85000
A)CASTING OF
UPPER BASEMENT and Foundation,Footing, PCC
SLAB

Based On completion up to 15 % of the total fees payable


B)CASTING OF Plinth Beam Concrete  
Ground floor lintel level, From STAGE A TO STAGE F
255000
UPPER BASEMENT less payment already
SLAB made at stage A
Superstructure – Column Ground floor

Brick Masonry Work/Brick work for


wall,kitchen slab
20 % of the total fees payable
C) COMPLETION
On completion up to From STAGE A TO STAGE F
OF GROUND The Lintel concrete,Shade concrete cover Ground floor lintel level, less payment already
340000
FLOOR SLAB Over Door Window Framing and Fixations made at stage A,B
Gaps concrete

staircase

Floor Slab or Slab upto Ground Slab


including Ground floor Concrete
Roofslab concrete 10 % of the total fees payable
D)COMPLETION
Ground floor roofing and From STAGE A TO STAGE F
OF GROUND
completion reports less payment already
170000
FLOOR SLAB
GROUND FLOOR Plastering Works on made at stage A,B,C
External and Internal Walls, Ceiling,
Sunshade

Superstructure – Column first floor

Brick Masonry Work/Brick work for wall


10 % of the total fees payable
E)COMPLETION
On completion up to first From STAGE A TO STAGE F
OF FIRST FLOOR
floor lintel level, less payment already
170000
SLAB The Lintel concrete ,Shade concrete cover made at stage A,B,C,D
Over Door Window Framing and Fixations
Gaps concrete

staircase

Floor Slab or Slab upto Ground Slab


including Ground floor Concrete
(total fees payable From STAGE A TO STAGE F is 1700000 Rs)

Roofslab concrete 20 % of the total fees payable


F)COMPLETION
first floor roofing and , From STAGE A TO STAGE F
OF FIRST FLOOR
completion reports less payment already
340000
SLAB
made at stage A,B,C,D,E
Plastering Works STARTING on External
and Internal Walls, Ceiling, Sunshade

G)COMPLETION 10 % of the total fees payable


Plastering Works on External and Internal On completion up to
OF GROUND From STAGE A TO STAGE F
FLOOR & FIRST
of house/building(INCLUDING ALL Ground & floorfirst floor
less payment already
170000
AREAS) all Plastering works
FLOOR made at stage A,B,C,D,E,F

5 % of the total fees payable


From STAGE A TO STAGE F
H AT the Time of final inspection possession Ground floor & first floor 85000
rupees only

less payment alreadymade at


stage A,B,C,D,E,F,G

Owner
AJIN/SATHYABABU/GIRIJA 3
CONTRACTOR
Mr. Madhusoodanan
Mr. Nandujithyadav
AGREEMENT OF HOUSE CONSTRUCTION WORK LABOUR CONTRACT

STAGES NOS DESCRIPTION PAYMENT AMOUNT % Agreed Amount ACTUAL

Electrical layout,
Lighting asper owner requirements
electronic,
25 % of the total fees payable
I communication systems On completion
From STAGE I
43750
Heating,
ventilation,
and air conditioning design (HVAC).

25 % of the total fees payable


From STAGE I TO STAGE J
J AT the Time of final inspection possession Ground floor & first floor
less payment alreadymade at
43750

STAGE I & K
On completion
stage I

175,000/-
PLUMBING LAYOUT
25 % of the total fees payable
K Sanitary, plumbing, and sewerage On completion
From STAGE K
43750
design.Drainage and water supply.

20 % of the total fees payable


From STAGE K TO STAGE L
L AT the Time of final inspection possession Ground floor & first floor
less payment alreadymade at
35000
stage K

Tile layout,Flooring & Wall Tiels


On completion
Flooring
STAGE M
Bathroom floor &
M Bathroom FULL Wall On completion 125,000/- 118750
stair grainte or tiels
kitchen slab granite
Granaite & tiles Edge molding

PAINTING WITH PUTTY


1coat cement primer, On completion
N
1 coat Medium grade putty,
On completion 170,000/-
STAGE N
161500
2 coat interior emulsion

FINAL INSPECTION COMPLETION 5 % of the total fees payable From STAGE A TO STAGE
O
AND POSSESSION
On completion
N
108500

MUTUALLY AGREED 2170000

Owner
AJIN/SATHYABABU/GIRIJA 4
CONTRACTOR
Mr. Madhusoodanan