GULF RESOURCES (RAMBA) LTD MECHANICAL STATUS

PRODUCTION ENGINEERING DEPARTMENT RB-21

PUJ- : GC.DH456-305-168
PUE- : SARGENT-SIZE 5
KBE : 15.70 m
GLE : 10.30 m

9-5/8" Csg, 36 ppf, @ 251.0 m

Long String : Short String :


- 2-7/8" Tbg collar - 1.875" "R" nipple
- 2-7/8"x7" Guib. Uni VI Pkr - 7" Dual Hyd Packer
- 2-7/8"x2-3/8" Swedge - 7"x2-3/8" Latch Seal
- 2-3/8" Tbg collar - 83 jts 2-3/8" tbg
- On-Off tool - (3'+8'+10')x2-3/8" Pup jt
- On-Off tool overshot
- 4'x2-3/8" Pup jt + 7 jts 2-3/8" tbg
- 7" Dual Hyd Packer
- 83 jts 2-3/8" tubing + (6'+10')x2-3/8" Pup jt

7" Dual Hyd Packer (unset) @ 802.8 m


EO Short string w/ "R" nipple c/w RZG plug
= 815.0 - 818.0 m installed @ 802.87 m
= 820.0 - 826.0 m
X 825.0 - 826.m (sqzd) (BRF-A2)

X 830.5 - 832.0 m (BRF-A2)


"RZG" plug set @ X 833.5 - 834.5 m (BRF-A2)
On-Off tool X 847.0 - 853.0 m (BRF Platform)

7"X2-7/8" Guiberson Uni VI Packer @ 875.0 m

= 880.0 - 882.0 m (Pendopo shale)


= 883.0 - 885.0 m (TAF)

PBTD @ 903.14 m
PBTD @ 905.0 m
X 932.0 - 934.0 m TAF (SQZ'D)
X 937.0 - 939.0 m TAF (SQZ'D)
PBTD @ 978.0 m
7" Csg, 23 ppf, @ 994.4 m

TD @ 1000.0 m

Remarks : PROD.ENG Date : Dec. 10, 1997


The 7"x2-7/8" Hyd Packer could not be set up to GROUP File : RB-21.xls
3000 psi RAMBA Prepared by : Joko S
ASAMERA ( SOUTH SUMATRA ) LTD MECHANICAL STATUS
PRODUCTION ENGINEERING DEPARTMENT RB-21
Swab string

KBE : 15.70 m
GLE : 10.30 m

9-5/8" Csg, 36 ppf, @ 251.0 m

Tubing String :
- 2-7/8" Tbg collar
- 2.25" ID "R" nipple
- Balance 2-7/8" tbg to surface

825.0 - 826.m (sqzd) x


(BRF-A2)
x x 830.5 - 832.0 m (BRF-A2)
x x 833.5 - 834.5 m (BRF-A2)
x x 847.0 - 853.0 m (BRF Platform)

RTTS @ 862 m
"R" nipple @ m
EOT @ m

= = 880.0 - 882.0 m (Pendopo shale)


= = 883.0 - 885.0 m (TAF)
PBTD @ 978.0 m
x x 880.0 - 882.0 m (sqzd)(TAF)
x x 937.0 - 839.0 m (sqzd)(TAF)
PBTD @ 978.0 m
7" Csg, 23 ppf, @ 994.4 m

TD @ 1000.0 m

Remarks : PROD.ENG Date : July 27, 1997


GROUP File : RB-21.xls
RAMBA Prepared by : rfk
ASAMERA ( SOUTH SUMATRA ) LTD MECHANICAL STATUS
PRODUCTION ENGINEERING DEPARTMENT RB-21
Production string

KBE : 15.70 m
GLE : 10.30 m

9-5/8" Csg, 36 ppf, @ 251.0 m

Tubing String :
- 2-7/8" Tbg collar
- 1.78" ID "R" nipple
- 2-3/8"x4pup jt
- 2-3/8"x2-7/8" swage
- 7'x2-7/8" Arrow IX double grip packer
- 2-7/8"x7" on-off tool
- Balance 2-7/8" tbg
825.0 - 826.m (sqzd) x x
(BRF-A2)
x x 830.5 - 832.0 m (BRF-A2)
x x 833.5 - 834.5 m (BRF-A2)
x x 847.0 - 853.0 m (BRF Platform)

Arrow IX double grip packer @ 862 m


"R" nipple @ m
EOT @ m

= = 880.0 - 882.0 m (Pendopo shale)


= = 883.0 - 885.0 m (TAF)
PBTD @ 978.0 m
x x 880.0 - 882.0 m (sqzd)(TAF)
x x 937.0 - 839.0 m (sqzd)(TAF)
PBTD @ 978.0 m
7" Csg, 23 ppf, @ 994.4 m

TD @ 1000.0 m

Remarks : PROD.ENG Date : July 27, 1997


GROUP File : RB-21.xls
RAMBA Prepared by : rfk
ASAMERA ( SOUTH SUMATRA ) LTD MECHANICAL STATUS
PRODUCTION ENGINEERING DEPARTMENT RB-21

KBE : 15.70 m
GLE : 10.30 m

9-5/8" Csg, 36 ppf, @ 251.0 m

Tubing String :
- 2-7/8" Tbg collar
- 7'x2-7/8" Arrow Set-IX packer
- 4'x2-7/8" pup jt + X/O
- 1.78" ID "R" nipple + X/O
- 2.25"x2-7/8" On-Off tool
- 10'x2-7/8" pup jt
- 88 jts 2-7/8" tbg
- 12'x2-7/8" pup jt
- 1 jts 2-7/8" tbg

x x 825.0 - 826.0 m (BRF-sqzd)


x x 830.5 - 832.0 m (BRF-A2)
x x 833.5 - 834.5 m (BRF-A2)
x x 847.0 - 853.0 m (BRF Platform)

On-Off tool bottom @ 857.83 m


Arrow Set-IX Packer @ 860.35 m
"R" nipple @ 857.83 m
EOT w/tbg collar @ 861.70
= = 880.0 - 882.0 m (Pendopo shale)
= = 883.0 - 885.0 m (TAF)

PBTD @ 905.0 m
x x 932.0 - 934.0 m (TAF)(sqzd)
x x 937.0 - 839.0 m (TAF)(sqzd)
PBTD @ 978.0 m
7" Csg, 23 ppf, J-55 @ 994.4 m

TD @ 1000.0 m

Remarks : Last workover (WO-3) on Aug 01,1997. PROD.ENG Date : Aug 05,1997
Hydraulic frac.TAF int.880-885 m,using 400 sacks proppant GROUP File : RB-21.xls
Sqzd BRF zone (830.5-834.5 m).Convert to oil producer. RAMBA Prepared by : RFK
GULF RESOURCES (RAMBA) LTD. MECHANICAL STATUS
PRODUCTION ENGINEERING DEPARTMENT RB-21

KBE : 15.70 m
GLE : 10.30 m

9-5/8" Csg, 36 ppf, @ 251.0 m

Tubing String :
- Sand screen (home made)
- 2.21" ID S.nipple
- 2-1/2"x2-1/4"x18' Pp.bbl c/w 2 ea ext
- Tbg to surface (+/- 91 jts 2-7/8" tbg)
Rod String :
- 2-1/4"x4' Martin Plunger
- 5 jts 7/8" S.rod
- 56 jts 3/4" S.rod
- 43 jts 7/8" S.rod
- 7/8" Pony rod as required
= 815.0 - 818.0 m - 1-1/4"x22' Polished rod
= 820.0 - 826.0 m

x x 825.0 - 826.0 m (BRF-sqzd)


x x 830.5 - 832.0 m (BRF-A2)
x x 833.5 - 834.5 m (BRF-A2)
x x 847.0 - 853.0 m (BRF Platform)

= = 880.0 - 882.0 m (Pendopo shale)


= = 883.0 - 885.0 m (TAF)

S.nipple @ 890 mKB

PBTD @ 905.0 m
x x 932.0 - 934.0 m (TAF)(sqzd)
x x 937.0 - 839.0 m (TAF)(sqzd)
PBTD @ 978.0 m
7" Csg, 23 ppf, J-55 @ 994.4 m

TD @ 1000.0 m

Remarks : PROD.ENG Date : Aug.17, 1997


AFTER SERVICE (CONVERT TO PUMPING) GROUP File : RB-21.xls
RAMBA Prepared by : Joko S
GULF RESOURCES (RAMBA) LTD. MECHANICAL STATUS
PRODUCTION ENGINEERING DEPARTMENT RB-21

PUJ - : GC.DH456-305-168
KBE : 15.70 m PU - : SARGENT SIZE-5
GLE : 10.30 m
Csg as a water injector.

9-5/8" Csg, 36 ppf, @ 251.0 m


Tbg string :
Rod string : - tbg collar
- 2-1/4"x4' plunger - Guiberson Uni VI Packer
- 5 jts 7/8" Hubber rod - swage + 2-3/8" tbg collar + On-off tgool
- 63 jts 3/4" Hubber rod - Overshot
- 43 jts 7/8" Hubber rod - 2-3/8"x2-7/8" swage
- 2'+2'x7/8" pony rod - 1 jt 2-7/8" tbg
- 1-1/4"x22' polished rod - 2.21" ID s.nipple
- 2-1/2"2-1/4"x18' p.bbl c/w 2 ea 2' ext
- 89 jts 2-7/8" tbg
= = 815.0 - 818.0 m - (1'+2'+4'+6'+10'x2-7/8" pup jt)
= = 820.0 - 826.0 m - 1 jt tbg c/w hanger

x x 830.5 - 832.0 m (BRF-A2)


x x 833.5 - 834.5 m (BRF-A2)
x x 847.0 - 853.0 m (BRF Platform)

Cup type s.nipple @ 862.46 m


Guiberson Uni VI Packer at 875 m
= = 880.0 - 882.0 m (Pendopo shale)
= = 883.0 - 885.0 m (TAF)
PBTD @ 905.0 m
x x 932.0 - 934.0 m (TAF)(sqzd)
x x 937.0 - 839.0 m (TAF)(sqzd)
PBTD @ 978.0 m
7" Csg, 23 ppf, J-55 @ 994.4 m

TD @ 1000.0 m

Remarks : Last service (SR-2) on Dec 12,1997. DHP service PROD.ENG Date : 4-Mar-98
Perf. and acidized 820-826 m and 815-818 m. Attempted to RIH GROUP File : RB-21.xls
dual string. Unsuccess to set Hydro Pkr. RIH DHP equipment. RAMBA Prepared by : Wid
GULF RESOURCES (RAMBA) LTD. MECHANICAL STATUS
PRODUCTION ENGINEERING DEPARTMENT RB-21

PUJ - : GC.DH456-305-168
KBE : 15.70 m PU - : SARGENT SIZE-5
GLE : 10.30 m
Csg as a water injector.

9-5/8" Csg, 36 ppf, @ 251.0 m


Tbg string :
Rod string : - tbg collar
- 2-1/4"x4' plunger - Guiberson Uni VI Packer
- 5 jts 7/8" Hubber rod - swage + 2-3/8" tbg collar + On-off tool
- 65 jts 3/4" Hubber rod - Overshot
- 42 jts 7/8" Hubber rod - 2-3/8"x2-7/8" swage
- 2'+2'x7/8" pony rod - 1 jt 2-7/8" tbg
- 1-1/4"x22' polished rod - 2.21" ID s.nipple
- 2-1/2"x2-1/4"x18' p.bbl c/w 2 ea 2' ext
- 89 jts 2-7/8" tbg
= = 815.0 - 818.0 m - (1'+2'+4'+6'+10'x2-7/8" pup jt)
= = 820.0 - 826.0 m - 1 jt tbg c/w hanger

x x 830.5 - 832.0 m (BRF-A2)


x x 833.5 - 834.5 m (BRF-A2)
x x 847.0 - 853.0 m (BRF Platform)

Cup type s.nipple @ 862.46 m


Guiberson Uni VI Packer at 875 m
= = 880.0 - 882.0 m (TAF)
= = 883.0 - 885.0 m (TAF)
PBTD @ 905.0 m
x x 932.0 - 934.0 m (TAF)(sqzd)
x x 937.0 - 839.0 m (TAF)(sqzd)
PBTD @ 978.0 m
7" Csg, 23 ppf, J-55 @ 994.4 m

TD @ 1000.0 m

Remarks : Last service (BNP-2) on Mar 6,1998. DHP service PROD.ENG Date : 29-Jul-98
GROUP File : RB-21.xls
RAMBA Prepared by : NPN
GULF RESOURCES (RAMBA) LTD. MECHANICAL STATUS
PRODUCTION ENGINEERING DEPARTMENT RB-21

PUJ - : GC.DH456-305-168
KBE : 15.70 m PU - : SARGENT SIZE-5
GLE : 10.30 m
Csg as a water injector.

9-5/8" Csg, 36 ppf, @ 251.0 m


Tbg string :
Rod string : - 2-7/8" tbg collar
- 2"x1-1/2"x13' Insert pump - 7" Guiberson Uni VI Packer
- 2'x3/4" Pony rod - 2-7/8" swadge + On-off tool
- 5 jts 7/8" s.rod - 2-3/8"x2-7/8" swadge
- 65 jts 3/4" s.rod - 1 jt 2-7/8" tbg
- 41 jts 7/8" s.rod - 2.21" ID mech hold down s.nipple
- (10'+2'+2') x 7/8" pony rod - 8'x2-7/8" pup joint
- 1-1/4"x22' Polish rod - 2.25"ID R.Nipple
- 89 jts 2-7/8" tbg
= = 815.0 - 818.0 m - 2'x2-7/8' pup joint
= = 820.0 - 826.0 m - 1 jt 2-7/8" tbg

x x 830.5 - 832.0 m (BRF-A2)


x x 833.5 - 834.5 m (BRF-A2)
x x 847.0 - 853.0 m (BRF Platform)

2.25" R.Nipple @ 863.23 m 2.21" ID Mech Hold Down s.nipple @ 863.23 m


Guiberson Uni VI Packer at 874.82 m
EOT w/ Collar @ 876.11 m = = 880.0 - 882.0 m (TAF)
= = 883.0 - 885.0 m (TAF)
PBTD @ 905.0 m
x x 932.0 - 934.0 m (TAF)(sqzd)
x x 937.0 - 839.0 m (TAF)(sqzd)
PBTD @ 978.0 m
7" Csg, 23 ppf, J-55 @ 994.4 m

TD @ 1000.0 m

Remarks : Last service (WO-03) on Sept 28,98. DHPS. PROD.ENG Date : Oct. 2,98
Found packer stuck and fish on-off tool. Converted from pp barrel GROUP File : RB-21.xls
to insert pp to produce upper zone and lower zone w/ water inject. RAMBA Prepared by : NPN
Jan 24,99

GULF RESOURCES (RAMBA) LTD. MECHANICAL STATUS


PRODUCTION ENGINEERING DEPARTMENT RB-21

PUJ - : GC.DH456-305-168
KBE : 15.70 m PU - : SARGENT SIZE-5
GLE : 10.30 m
Csg as a water injector.

9-5/8" Csg, 36 ppf, @ 251.0 m


Tbg string :
- 2-7/8" tbg collar
- 7" Guiberson Uni VI Packer
- 2-7/8" swadge + On-off tool
- 2-3/8"x2-7/8" swadge
- 1 jt 2-7/8" tbg
- 2.21" ID mech hold down s.nipple
- 8'x2-7/8" pup joint
- 2.25"ID R.Nipple
- 89 jts 2-7/8" tbg
= = 815.0 - 818.0 m - 2'x2-7/8' pup joint
= = 820.0 - 826.0 m - 1 jt 2-7/8" tbg

x x 830.5 - 832.0 m (BRF-A2)


x x 833.5 - 834.5 m (BRF-A2)
x x 847.0 - 853.0 m (BRF Platform)

2.25" R.Nipple @ 863.23 m 2.21" ID Mech Hold Down s.nipple @ 863.23 m


Guiberson Uni VI Packer at 874.82 m
EOT w/ Collar @ 876.11 m = = 880.0 - 882.0 m (TAF)
= = 883.0 - 885.0 m (TAF)
PBTD @ 905.0 m
x x 932.0 - 934.0 m (TAF)(sqzd)
x x 937.0 - 839.0 m (TAF)(sqzd)
PBTD @ 978.0 m
7" Csg, 23 ppf, J-55 @ 994.4 m

TD @ 1000.0 m

Remarks : Last service (WO-01) on Jan 24,1999. DHPS. PROD.ENG Date :


POH rod string c/w insert pump for PBU survey 63 hrs. GROUP File :
RAMBA Prepared by :

Page 11
Jan 24,99

ANICAL STATUS
RB-21

H456-305-168
ENT SIZE-5

old down s.nipple

5 @ 994.4 m

Jan 24,99
RB-21.xls
Thet

Page 12
Jan 29,99

GULF RESOURCES (RAMBA) LTD. MECHANICAL STATUS


PRODUCTION ENGINEERING DEPARTMENT RB-21

PUJ : B C456-305-168.
KBE : 15.70 m PUE : ARROW C-255
GLE : 10.30 m WATER INJECTOR CASING

9-5/8" Csg, 36 ppf, @ 251.0 m

Rod Stringnya mannaaaaaa…….!!!!

Tbg string :
- 2-7/8" tbg collar
- 7" Guiberson Uni VI Packer
- 2-7/8" swadge + On-off tool
- 2-3/8"x2-7/8" swadge
- 1 jt 2-7/8" tbg
- 2.21" ID mech hold down s.nipple
- 8'x2-7/8" pup joint
- 2.25"ID R.Nipple
- 89 jts 2-7/8" tbg
= = 815.0 - 818.0 m - 2'x2-7/8' pup joint
= = 820.0 - 826.0 m - 1 jt 2-7/8" tbg

x x 830.5 - 832.0 m (BRF-A2)


x x 833.5 - 834.5 m (BRF-A2)
x x 847.0 - 853.0 m (BRF Platform)

2.25" R.Nipple @ 863.23 m 2.21" ID Mech Hold Down s.nipple @ 863.23 m


Guiberson Uni VI Packer at 874.82 m
EOT w/ Collar @ 876.11 m = = 880.0 - 882.0 m (TAF)
= = 883.0 - 885.0 m (TAF)
PBTD @ 905.0 m
x x 932.0 - 934.0 m (TAF)(sqzd)
x x 937.0 - 839.0 m (TAF)(sqzd)
PBTD @ 978.0 m
7" Csg, 23 ppf, J-55 @ 994.4 m

TD @ 1000.0 m

Remarks : Last service (RIG-01) on Jan 29,1999. DHPS. PROD.ENG Date : Jan 24,99
Installed new insert pump. Well on prod w/ SL/SPM: 74/9. GROUP File : RB-21.xls
RAMBA Prepared by : Ninik

Page 13
MECHANICAL STATUS
RB-21

PUJ - : GC.DH456-305-168
KBE : 15.70 m PU - : SARGENT SIZE-5
GLE : 10.30 m
Csg as a water injector.

9-5/8" Csg, 36 ppf, @ 251.0 m

Tbg string :
- 2-7/8" tbg collar
- 7" Guiberson Uni VI Packer
- 2-7/8" swadge + On-off tool
- 2-3/8"x2-7/8" swadge
- 1 jt 2-7/8" tbg
- 2.21" ID mech hold down s.nipple
- 8'x2-7/8" pup joint
- 2.25"ID R.Nipple
- 89 jts 2-7/8" tbg
- 2'x2-7/8' pup joint
- 1 jt 2-7/8" tbg

= = 815.0 - 818.0 m
= = 820.0 - 826.0 m

x x 830.5 - 832.0 m (BRF-A2)


x x 833.5 - 834.5 m (BRF-A2)
x x 847.0 - 853.0 m (BRF Platform)

2.25" R.Nipple @ 863.23 m 2.21" ID Mech Hold Down s.nipple @ 863.23 m


Guiberson Uni VI Packer at 874.82 m
EOT w/ Collar @ 876.11 m = = 880.0 - 882.0 m (TAF)
= = 883.0 - 885.0 m (TAF)
PBTD @ 905.0 m
x x 932.0 - 934.0 m (TAF)(sqzd)
x x 937.0 - 839.0 m (TAF)(sqzd)
PBTD @ 978.0 m
7" Csg, 23 ppf, J-55 @ 994.4 m

TD @ 1000.0 m

Remarks : Last service (WO-01) on Oct 13,2000. Rod job. PROD.ENG Date : 17-Oct-00
POH w/ insert pump on rod string, L/D.Well suspended. GROUP File : RB-21.xls
Put casing on water Injection RAMBA Prepared by : TS
MECHANICAL STATUS

PUJ - : GC.DH456-305-168
KBE : 15.70 m PU - : SARGENT SIZE-5
GLE : 10.30 m
Csg as a water injector.

9-5/8" Csg, 36 ppf, @ 251.0 m

Tbg string :
- 2-7/8" tbg collar
- 7" Guiberson Uni VI Packer
- 2-7/8" swadge + On-off tool
- 2-3/8"x2-7/8" swadge
- 1 jt 2-7/8" tbg
- 2.21" ID mech hold down s.nipple
- 8'x2-7/8" pup joint
- 2.25"ID R.Nipple
- 89 jts 2-7/8" tbg
- 2'x2-7/8' pup joint
- 1 jt 2-7/8" tbg

Ditemukan rembesan dan


penurunan tanah
dipermukaan, indikasi
= = 815.0 - 818.0 m kebocoran pada casing
= = 820.0 - 826.0 m

x x 830.5 - 832.0 m (BRF-A2)


x x 833.5 - 834.5 m (BRF-A2)
x x 847.0 - 853.0 m (BRF Platform)

2.25" R.Nipple @ 863.23 m 2.21" ID Mech Hold Down s.nipple @ 863.23 m


Guiberson Uni VI Packer at 874.82 m
EOT w/ Collar @ 876.11 m = = 880.0 - 882.0 m (TAF)
= = 883.0 - 885.0 m (TAF)
PBTD @ 905.0 m
x x 932.0 - 934.0 m (TAF)(sqzd)
x x 937.0 - 839.0 m (TAF)(sqzd)
PBTD @ 978.0 m
7" Csg, 23 ppf, J-55 @ 994.4 m

TD @ 1000.0 m

Remarks : Last Tag fill by Wireline on December 24, 2013. PROD.ENG Date : 8-Jan-14
Gauge cutter : no progress (Water inject di Casing). GROUP File : RB-21.xls
RAMBA Prepared by : Umar